The most common failure I see is when project leadership agrees to a fixed scope and timeline then tries to execute in an agile way. Agile is the contract. But it's also a tough sell. It requires a high degree of trust to say "we'll pay you $XM in exchange for X sprints of whatever we prioritize with no fixed end state" but that's what you need to be agile. If you layer sprints on top of a fixed timeline, you're just adding needless complexity since your end state is predetermined and how you get there is irrelevant.
I agree that fixed-scope contacts cause a lot of problems for Agile approaches. However, they also cause a lot of problems for non-Agile approaches. If I have to deal with supposedly fixed-scope situation, I'm going with and Agile approach.
There are two basic cases. One is that scope is truly fixed (which is rare). In that case, having a new releasable version every week with highest-priority features first is excellent risk management. When the date comes, you'll have something to ship. You also get to continually validate and improve internal processes, so you're more likely to be using the time available effectively.
The other is that scope was fixed in the contract but is in practice variable. So every week you deliver something to the customer. Every week you build trust. And every week you encourage them to do tests, deploy early, anything so they start getting value. At that point they get user and business feedback, and come to you with changes. That's the point where you start shifting from fixed-bid to time-and-materials. Maybe you keep to the same budget, but now they're getting more for their money. Maybe they look at the backlog and say, "Wow, there's still lots more value to deliver, let's keep going."
In many places, especially smaller ones, project managers are also developers (or lead developers etc), and they often drink the Scrum kool-aid.
Developers may advocate small-a agile, but I have never heard of an actual developer pushing for Scrum, SAFe, or any of the name-brand "agile" methodologies, that come with expensive consultants and certifications and "coaches" and conferences and a whole ecosystem around them. These are things for project managers for the benefit of project managers who see project management the main deliverable l in and of itself. The same with JIRA actually, it's not a software development tool, it's a project management tool, sold to the same people who previously bought MS Project. These things are all overheads in the software development process, not enablers, as another poster says, the goal of most organisations is not to be effective at their stated mission, but to maintain their internal power structures.
Developing new aircraft, building a new ship, building a custom-designed bridge (most of them are) are processes that often run out of time and / or budget.
If you want predictability, you want repeatability. But in software all reliably repeatable parts become automated away.
But I think good projects release early and often precisely so that they can learn as they go. At which point predictability goes out the window.
I have seen more success in cases where teams estimate for 90% percent confidence instead of 50% confidence. By that I mean "it should almost never take longer than that" vs. "it will probably take that long." Unfortunately, to do that, you need enlightened business management that appreciates the difference between an estimate and a promise, as opposed to business management that pays lip service to the distinction.
This sounds like a much better way to estimate. Do you have any links to content discussing this?
I haven't seen a good way to turn the concept of "it should almost never take longer than that" into a concrete process. I've always seen it as a gut check, often implemented as "take your initial estimate and double/triple it." What I actually see is that a lot of teams implement that but walk back the doubling when the business/PM delegation persistently asks for more in less time. Only in really engineer driven cultures have I seen engineering teams successfully push back.
The alternative is some sort of sub-iteration hybrid where you attempt to fix deadlines for much smaller units of work and constantly revise.
This is OK for some industries. But 2/3rds of a car doesn't quite sell...
That in turn means technical debt; which puts future deadlines and feature sets at risk.
Since in SCRUM as a team you try to not compromise on quality the only way out of this is to push back on deadlines or feature set (or both).
So instead of blindly executing orders; the development teams can push back on deadlines.
Most of the time these are actually negotiable. Even the "hard" deadlines....
It doesnt mean the dev teams always win however they are better equipped to inform "management" about the consequence of the deadline.
https://www.amazon.com/Doesnt-Have-Be-Crazy-Work/dp/00628747...
https://en.wikipedia.org/wiki/Project_management_triangle
If time is fixed, then scope and/or cost must change.
Even if so, that would be in itself a failure of Scrum. A process that works only sporadically and only with exceptionally well organised groups ain't really all that much.
> It requires a high degree of trust to say "we'll pay you $XM in exchange for X sprints of whatever we prioritize with no fixed end state" but that's what you need to be agile.
...no? It requires a well-defined end-state, and that includes not defining the irrelevant. It's not really "give me $XM and we'll deliver anything from accounting software to a really nice puppet."
Unfortunately Scrum is too often explained and implemented that first way, leading to the anti-Agile feedback we see on HN with some regularity. The second way is much more compatible with complementary tools such as Lean Startup and Kanban and I wonder if this (to me very welcome) non-exclusivity explains why it is less talked about.
[1] https://blog.agendashift.com/2018/07/04/righttoleft-works-fo...
From what I can tell, it has all the meaninglessness of an empty buzzword used primarily as a method of trying to engage people and give an opening on selling their services by stating "oh if you don't understand the difference sit down with us and let us show you how different and better it is."
It looks like if scrum doesn't work they call it "falling left to right scrum", and if it works it's their "brilliant right to left scrum".
Even by their own definition they both have a backlog that gets prioritized and selected each 2 weeks into a sprint backlog, and executed during the sprint.
The rest is just hand waving. "One is goal focused vs the other is backlog focused. Oh yeah but we do put our goals in the backlog." So they're both backlog focused then? The only thing they're really sayings is "When prioritizing tasks, make sure they accrue to something and aren't just random work." Which is both obvious, and of course too simple to write and sell a book about, so instead this whole other terminology is made for it.
Thanks for sharing the link though.
If I ever find a developer who can sell, selling is not a developer's USP in general, there are exceptions and I would hire those exceptions instantly!
aka, WaterAgileFall.
You aren't wrong, either. I found Scrum to be a series of waterfalls that weren't well thought out. "Iterative Design" essentially meant, "We aren't sure what the button should do exactly, but we know we need it there and it kinda has to do this and we'll figure the rest out for the next iteration."
That caused so many problems with tech debt.
Stories began to take longer due to the increasingly large and discombobulated code base, but the expectation was that we continue to deliver the same number of story points each sprint.
Then we got blasted for losing pace. "Why are you under-performing? We are just adding little features. You've already implemented this button on another form before? Why does it take longer the second time? You already know how to do it!"
It became absurd and no one could hear or understand what was happening was easily predictable and in fact -- was predicted by several members of the team many months prior.
When the project management was informed of these predictions now having come true, the development team was accused of intentionally causing the delays.
The most upsetting experience in my career thus far was being belittled by an incompetent project manager.
"How could it possibly take that long? How do you not know how long it will take?"
The happiest times of my career have been when we're lacking a PM -- coincidentally the most successful!
Well, if they really said that, you can just dismiss the comment as incompetent. A witty retort may be in order if a non-technical manager is in earshot, e.g.:
"How long would it take for you to earn a green belt in karate?"
"Hmm, what does a green belt entail?"
"Exactly, you don't even know what you don't know, yet."
"We don't know because we've never done this before, and we can only compare to the most similar work we've done, and any existing data."
Before I could say more, they I interrupted: "You have to know, it's your job, or you don't know what your doing," or something along those lines. It was the most heated I've felt. I know what I'd reply with today, but I was younger and more naive then.
> "or you don't know what your doing,"
That though was unprofessional, and should be addressed as such.
Or just offer over-inflated estimates since they won't accept something realistic anyway.
I don't think this will score you a lot of points.
Also, someone asking how could something take so long is not a belittling question. I don't see any problem with either question.
There are so many places where this can sneak in and become an issue, too:
- The development team can groupthink, underestimate and/or fail to account for technical debt payback in planning poker. They may estimate the cost for the new feature, but not include any time for refactoring to keep the codebase healthy
- The Scrum Master may not shield the development team from pressure to deliver coming from the product owner, which may cause the team to cut the above corners
- Codebase health may be split out from vertical stories into its own tasks that get deprioritised by the product owner
- Even if the development team identifies the need for codebase health, this may not be communicated back to the product owner in a way that makes business sense ("but we can still get this feature out the door quickly and fix the mess later, right?" - yes, once or twice, but the downside is a slowing of velocity)
- Even if the team started well with ground rules the Scrum Master is supposed to enforce surrounding technical quality, the Scrum Master may not be effective in enforcing the process - either because they lack authority or because they lack the ability or knowledge to do so
Among several others.
In your situation, the big red flag is that the team predicted the issue many months prior. The process has failed to extract that information from the team members and deliver a consensus between them and the product owner.
Though ultimately, as with any project, if the product owner has more organisational authority than the development team and chooses to exert this authority, no process will be able to save you.
The tricky bit is having a solution and implementing it.
Having something well thought out is hard work. Is hard work rewarded? Is initiative to even try rewarded? I'd say the answer is no.
The answer becomes yes in small teams that are given time, freedom and resources, or in times of crisis (same thing as small team really, minus the time bit), as far as I can tell. Otherwise, most people's natural tendency (including me) is to phone it in. We'd be wise to let people in software development and many other professions that are not manual labor, to switch careers after 30-35 if they haven't done anything worthwhile by then.
Working with people who have to phone it in for the next 30 years and know it is modern day hell for anyone with an iota of ability.
It's permanent compromise and insincerity, or being an outcast that's temporarily tolerated for doing 5-10x the work of the person next to you.
The problem is always : features and customer request over bug fixing or design fixes.
The system, project type does not matter. That's why some PO recommend 10 percent allocation to devops / ops, 10 percent to improving code base . And "no bug survives the Sprint" philosophy. And what is left,is you next feature or customer request.
In other words, Scrum methodology in itself is not mature as a methodology and depends on individual fiat, just like any project that doesn't have any process at all.
The only tangible benefit to Scrum might be paying lip service to development departments while firmly retaining the status quo.
The rest of your post is just warping your initial conjecture to arrive at conclusions you'd already decided upon. I neither agree with those conclusions nor the chain of twisted logic you used to arrive that.
I'm not going to stand on a soapbox and sing for the glory of scrums. People - like yourself it seems - can get very tribal when talking about such things. Which is as weird to read as it is pointless for you to argue. In my experience leading different teams using different methodologies, the thing that really makes the big noticeable impact is people and not methodologies. If you work in a blame culture or have colleagues in your team who don't follow process - then whatever process you put in place will be undermined at every opportunity regardless of it's methodology. However if you work in an environment where people respect one another and want to collaborate in getting work done, then you pick a methodology that works best for the day to day work (eg project work or support operations) and for the way people like their work organised. All the rest of the arguments are superfluous.
Yep. People do not realize that the whole company has to adopt agile/scrum for it to work. It's a shift that many companies can not or will not make. They are tied to fixed deadline, fixed scope for various reasons.
I’ve noticed comments for and against scrum are often so focused on the technical aspects of the methodology that they overlook the human aspect. Which matters more in my opinion.
I think it works well enough, for a few years. I don't think it's sustainable - the blinkers of "sprints" encourage growth of tech debt because nobody has an eye on the future and Product won't prioritize refactorings, and sprints are too short for devs to sneak refactoring into the schedule.
No, it isn't. Iterated waterfall is at least as old as the first paper discussing waterfall, but while scrum mandates interations, it doesn't mandate much about how work is done in the iterations, and specifically does not mandate the process steps associated with waterfall; further, it emphatically rejects the role separations and handoffs associated with waterfall during the iterations.
> munching through backlog items fed to them by product managers.
That's...not actually Scrum, as it implies that either the role of Product Owner is taken by a PM outside of the Scrum Team or that that the Scrum Team is not self-organizing, either of which is a significant (even if common) deviation from Scrum.
> the blinkers of "sprints" encourage growth of tech debt because nobody has an eye on the future
Tech debt should manifest in reduced velocity which should be noticed, taken as a signal of a process defect, and addressed in the Scrub Team’s various inspection and process adjustment points.
OTOH, if the Scrum Team is properly cross-functional and self-organizing instead of having a non-team-member imposed as Product Owner, then including appropriate restarting as components of completion of relevant backlog items shouldn't be a problem.
About the same percentage as that of “Agile” software development shops that put people and interactions above processes and tools.
OTOH, at any place that is considering implementing either, there are decision makers who can influence (or in the case of Scrum more than Agile, authoritatively direct) whether or not that's the case, so for them, at least, it's worth distinguishing between problems with Scrum as prescribed and problems which often occur because decision-makers decided to ignore key parts of Scrum-as-prescribed.
Given that, I think it's worth considering that the problem is Scrum. Especially given that Scrum is not just a process, but an organization and an army of "certified" people that sell services.
When something generally doesn't work for its stated purpose but keeps making money, I think it's worth asking what its real purpose is. E.g., things like crystals and psychics. As Eric Hoffer wrote, “Every great cause begins as a movement, becomes a business, and eventually degenerates into a racket.”
No, most nominally Agile shops are also nominally doing Scrum, but actually doing not-Scrum in a not-Agile context, largely due to sabotage of both core principles of Agile and foundational elements of Scrum by management.
It doesn't matter what name and superficial ritual you put on the process if it's all window dressing over top-down disempowering command-and-control by persons who are neither doing the work nor experts on the work.
Which isn't to say that the Agile and Scrum bodies of work aren't part of the problem: neither really addresses as a key point how the team effectuates ownership of process and how interaction with management works, which means those gaps get filled in (or rendered moot, in the first case) in ways which compromise what those bodies of work do prescribe because.
Lean, which comes from basically the same perspective (while they don't cite exactly the same values as expressed in the Agile Manifesto, being Lean essentially implies being Agile and vice versa) and is a good body of knowledge to draw from alongside Agile, is better in this regard, and so places nominally drawing on Lean seen to be more likely to be doing what they say, because Lean doesn't leave as much of the core vital parts without good guidance.
This process adjustment usually means "sorry about your vacation" and/or "you aren't doing enough overtime".
(Of course, if the wrong actor is monitoring velocity and controlling process, then the team has an incentive to mask the effect of tech debt but continuously adjusting estimates to maintain the illusion of constant velocity, a d avoid the first bad response, or, if that opportunity is missed, to avoid the subsequent external interventions.
"Fortunately," hardly anyone in Silicon Valley plans to be working on the same codebase in a few years. There's a good chance the problem space won't be relevant anymore by then, and on the off chance it's still funded, the new team will rewrite it whether or not it's good.
>sprints are too short for devs to sneak refactoring into the schedule.
As I've gotten more senior, I've just gotten more brazen about doing this less sneakily.
A lot of 6 month old code gets thrown away either because its been rewritten or because it didn't achieve its stated objective. Meanwhile a bunch of companies are relying on systems that were first created in the 90s because that software achieves its objectives and the cost justification for a rewrite isn't there.
The "spiral" model is closer to a true iterated waterfall. I've seen it used successfully in more mature companies.
The effective strategy is to build an oblique, fatally limited prototype, which can not possibly be mistaken for a shippable product. The bad prototype can only be used to test the hardest parts of an idea and must have major holes in it with no way of filling them. It should also have a largely fixed timeline to ensure it is put to bed before it gets "hamstered" into the shipping product.
I once had a manager who, on the subject of upper management wanting to ship the prototype, would say “the difference between dev and prod is one letter.”
For another example, look at what we talk about with Clean Code or SOLID principles. We have that old joke about the two hardest things are naming things, cache invalidation and off by one errors. I think the fourth hardest one is resolving merge conflicts.
You work carefully on code for weeks or months and then in one fell swoop it all gets broken when you aren't looking at it anymore. It's really bad for morale.
If you read through all of these Best Practices with the notion that merge conflicts are dangerous, then you start to see them as designed to keep conflicts from happening. Putting related code together isn't just about reading comprehension. It's also about keeping unrelated code apart. You and I can work on unrelated stories without ever doing a 3 way merge.
And if you look at merges as the problem, you start doing things like alphabetizing data structures that don't have a strong cohesiveness to them because then when you and I add a feature to the same data structure, we aren't both modifying the bottom of the file. I put something under T and you put it under G.
To put this another way, if in some perfect future someone invented a merge tool that never screws up, so that we only get merge conflicts when two people are accidentally working on the same feature/bug, we might start to question all of these practices as overwrought.
Of course the business didn't know all the scenarios at the beginning of the feature development and didn't care because: iterative development means we'll figure it out later.
A lot of devs trap themselves by insisting they can write the tests after. Once managers know the code exists they want to use it, or move on to the next thing people are breathing down their necks for. And code written without tests is difficult to test so becomes a self fulfilling prophecy.
In fact it’s such a reliable mechanism for self sabotage that I look at carefully at people who bring this on themselves and try to figure out if it’s naïveté, learned helplessness, or malice.
We need to unify around these principles, possibly revoke memberships for unprofessional behavior. One dev getting himself fired changes nothing..
But one developer quitting rather than do bad work does change something. At the very least, it means that the developer can find another, better job. But it's also an opportunity for companies to learn. And for those who don't, good people refusing to prop up bad companies is a step forward.
I'd also add there's a a lot that can happen between refusing to do bad work and quitting/getting fired. Saying no is the beginning of a negotiation. A negotiation that won't happen if we just say yes all the time.
We tend towards 4 or 5 sprints in which nothing is completed, only to suddenly have a flood of completed things the next.
It's perfectly possible to deliver small units of work weekly. One still gets frameworks while doing that. It's just that the work of making the framework happens over time, not up front. Which is good, because good designs are based on good information, and the beginning of the project is when you have the least information.
The terminology is so incredibly developer hostile.
Could you elaborate?
This creates a confusing code-base with lots of IF statements, copy/pasted code, data modifications from several areas of the system, etc.
You'll fix a problem with data getting into the database incorrectly and realize a couple sprints later, fixing that bug caused other bugs elsewhere.
Automated testing doesn't catch it because automated testing only handled certain scenarios.
It's a mess.
Well there's your problem. How is that inherent to scrum?
Besides tech debt, a concern I have that I don't see brought up is burn out. With Scrum, every action you perform is micromanaged and with a push for "high velocity". There is no proverbial breathing room in this where the pressure lets up. At least with waterfall (for how we did it before Scrum), the windows of high pressure times were shorter. During the beginning of our 6 month waterfall, in parallel to spec work we'd be taking care of tech debt or implementing our pet feature and it was a time of mental recovery.
In a perfect SCRUM world you could not be forced to implement this in a time not of your own estimate. A feature that is so big that it takes more than a few days to implement has to be split...but well we all know how this plays our in reality most of the times...
There is something odd with this, if you did the estimation. Shouldn't the story points/sizing/estimates preclude this?
Doesn't the team pick the items for the sprint that they think they can complete?
Refactoring stories were also rare, it was just sort implicit in the task, unspoken as part of doing it.
I'd imagine that is why they did not get cut.
But yes, management picked feature priorities, but left the implementation up to the team. So at any given time were were working on the "most important" thing from a business perspective.
While it "works" it is certainly not ideal that people have to go off the reservation to ensure that the project doesn't implode in the future due to the accumulation of buggy code, performance problems and likely security vulnerabilities.
That's not breaking down a story into smaller stories though, that's simply not doing some of the tasks necessary for a story to be complete. "Story" is not a synonym for "task"; a story is user-centric not about internals. "Write the documentation for this feature" is not a story and "write the tests for this feature" is not a story, they should be part of your definition of "done".
Then they ask us why there isn’t any progress.
I often wonder if they picked these words because they knew nothing at all about sports, of if there is a coded warning in them...
It’s the same reason why demonstrably value-additive, cost-effective prediction markets are rejected by managers despite evidence in their favor: it removes their ability to create ambiguous Dutch books out of different project deliverables and resort to exploiting subjective psychological biases of superiors to win money & status increases. Anything that holds them accountable to the actual measured result status of a deliverable can’t be tolerated.
Scrum is just the by-product of corporate status-seeking evolutionary war games against in-house scientific thinking.
Does anyone know if there is an anti-movement to that over-communication trend? Something along the lines: "The only way to go fast is to go well", * Plan * Honor the flow * Adjust
I feel we kind of lost something where creating code/designs using strong feedback loops was a "first class citizen with royal honors" of the software development process. Scrum kind of makes it a sideline issue, a peon of middle management
My dad started developing in the late 1960s. He did a lot of in-house software, mainly manufacturing and insurance systems. His approach was to go out and see something in use, talk to the people using it, go back to his office, write something, release it, and go talk to the people again. He'd do that loop in as little as a couple of days.
Today we'd call that obviously agile. But both back then and now, higher-ups wanted more "control", by which they meant feelings and appearance of control. Which caused longer feedback loops. Which made things more out of control, which required more process and even longer feedback loops.
I think we have the same struggle today, and I have no idea how to get out of it.
IMHO, the idea is that over time the organization will adopt new Agile practices and not depend on Scrum anymore. In practice, however, many organizations think they are Agile after they introduced Scrum, which is a simple fallacy. After all, becoming Agile is about a culture change and not about the introduction of a new process framework.
To drive the point home I could easily transform "[o]n average, the first priority of managers and execs is maintaining the power structures that make them a big deal" into a derogatory comment about engineers, fad chasing, and resume padding by a simple word substitution. It would be neither accurate nor fair to many (perhaps most) engineers: just as your comment isn't really accurate or fair to managers or organizations.
That's not constructive in the sense of providing ways to solve the problem. But that wasn't my goal. My goal was to support and confirm the article's thesis. I have also written plenty of constructive things on software development, but I think it's absurd to suggest that every HN comment must contain that kind of constructive feedback. (And if that were a reasonable standard, you aren't living up to it.)
But that doesn't explain the success of Scrum, because Scrum does away with the power structure of managers, and should empower the teams. "We're doing Scrum now" is the big stick I see scrum masters use to beat back Business managers to keep them from interfering with and micromanaging the team.
At least, that's what they should be doing when management interferes too much. And then address this higher up with whoever decided that we're doing scrum now, and explain to them what that means, if necessary.
There's no excuse to tolerate micromanaging managers in a Scrum process. They don't belong there. Kick them out.
I used to think that was a contradiction. Now I think it's almost inevitable. I wrote more about it elsewhere [1], but the basic deal is that most companies have other priorities than being effective, so the processes that dominate will reflect those priorities.
On average, the first priority of managers and execs is maintaining the power structures that make them a big deal. But true Agile processes are about empowering teams to self-organize around serving users. Ergo, Sturgeon's Law [2] applies here too: 90% of company software process is crap.
I think reason why Scrum in specific won out is that it combined a process framework unthreatening to executives with the multilevel marketing scheme of Scrum certification. Executives got to keep doing what they were doing, the workers got a "didn't stop breathing" certificate, and coaches got paid. Win, win, win!