Is this that? https://www.youtube.com/watch?v=WqLynLWLd8Y
https://m.youtube.com/watch?v=XWjUZJtR610
I could be wrong, I had never heard of this fascinating maintenance until this very moment.
>BOURLEZ RENOVATION
9 months ago
Why is it?
https://www.youtube.com/watch?v=zNFUgTJR6jw seems to be the full cleaning procedure
> they say that "tampering"[1]
I believe you mean tamping. :-)
That thing is a moving synchronized orchestra of a mini-factory, carrying it's own inventory and moving on the same railway track that it's servicing/fixing. And here I am, can barely coral a bunch of juniors to fix a basic CRUD app.
You haven’t described accurately who is at risk from cults, at all. Think of the idea that every religion could be reasonably described as an established cult.
Worth noting though that until more recently they had some challenges focusing on the right goals.
https://www.youtube.com/watch?v=_LoXgN1QWZM
https://www.youtube.com/watch?v=dqq0543JWzI (wiggle wiggle)
Second, in most modern rail installations the track is pre-tensioned to deal with thermal expansion. The track is stretched with a hydraulic tool and welded while under tension, so thermal expansion just means reduced tension. This is why trains on modern rail lines don't make the familiar click-clack sound.
(How much tension is applied depends on the country and weather - you can choose between tolerating high temperatures and tolerating low temperatures. This is why in the UK, there are sometimes train stoppages in very hot weather)
What does the click-clack sound have to do with thermal expansion? Is it because the track is expanding as the train moves over it, if so what’s causing that sound signature?
The rails are firmly fixed, longitudinally as well as laterally, with pretensioning in order to minimise stress as they heat up. This is true with ties as much as with a concrete bed.
https://interfacejournal.com/archives/644
"There are a number of ways to increase the resistance of rail to buckling. The first and most common is the use of rail anchors to limit the longitudinal expansion of the rail. Anchors come in a variety of designs, but they all apply several thousand pounds of clamping force on the base of the rail. When applied properly against each side of the crossties, the anchors prevent expansion of the rail in the longitudinal direction."
The general approach is described here: https://en.wikipedia.org/wiki/Rail_stressing
Usually they are joined to a rail with a slant cut or a tongue section at ends, and let ride into the opposing cuts/tongues, IIUC.
The rail can only expand if it can move. If the rail is clamped down tightly to the sleepers, and the sleepers are tightly packed in the ballast, then it just doesn't expand. The only thing that happens is that stress increases / decreases as temperature changes.
The pre-tensioning is only to ensure that the average tension in rail in the course of an average year is in a certain range.
There are. There are ballastless tracks that utilize a continuous concrete slab instead of the crushed rock ballast. Their main benefit is that they are lower mamintenance than their counterparts, but their upfront cost tends to be higher and construction takes longer, making them difficult to retrofit onto existing stretches (would require long closures).
However, the low maintenance nature of this style makes it popular at locations where maintenance is very difficult (long tunnels, etc) or where loads are particularly high, either due lots of use or high speeds, like with new HSR construction.
> Compressive forces result from stresses induced in a constrained rail by temperature above its "stress free" state, and from mechanical sources such as braking, rolling friction and wheel flanging on curves. The temperature of the rail at the "stress-free" state is known as the rail neutral temperature (i.e. the temperature at which the rail experiences zero longitudinal force). Initially, the rail's installation temperature or "anchoring temperature" is the rail's neutral temperature. Hence, at rail temperatures above the neutral, compressive forces are generated, and at temperatures below the neutral, tensile forces are developed. Track maintenance practices address the high thermal load problem by anchoring the rail at (neutral) temperature of 95 -110 F. This high neutral temperature range prevents the generation of excessively high buckling forces even when the rail temperatures reach 130 -150 F.
https://www.volpe.dot.gov/infrastructure-systems-and-technol...
Some railroads that experience wide summer vs. winter temperature differences may choose to install expansion joints. Like most things, there are trade-offs, like increased maintenance costs and increased chance of derailment at the joint.
[1] https://toolkit.climate.gov/topics/transportation-and-supply...
[2] https://thelincolnite.co.uk/2015/07/kink-in-track-freight-tr...
https://www.itv.com/news/anglia/2022-07-19/why-cant-uk-roads...
Unintuitively, parts of the London underground are notorious for being extremely hot. Especially the central line is super hot due to the material the tunnels are dug into being an extremely good insulator/heat store.
https://www.forbes.com/sites/lauriewinkless/2017/06/22/sweat...
Use ice-based AC for the passengers, not heat pumps dumping into the tunnels.
Change the breaking resistors to not be on the train, but the rectifier stations, and make them vent outside. Or change them to dump heat into what's a big insulated kettle that gets filled with ice or at least disposes the resulting hot water outside, not hot air into the tunnels.
On some ballasted track they're allowed for emergency breaking ("Schnellbremsung"), as they can interfere with equipment like axle counters.
This is done because they have to wait for the track to cool before they are able to safely drive on it after it got heated.
These are btw just a linear induction motor with the field coils locked to standstill.
I have since wondered about using this for traction, as it's likely not too efficient but ought to have potential for a much simpler drive train, using much longer parts of rail under the vehicle to get the desired force with a low slip (and thus low rail heating).
Say, for vehicles that don't normally need (this much) acceleration, and would thus prefer few/no driven axles.
We are at a point where power electronics are cheaper than some traditional transformer technology, and being able to deliver high accelerations (on the order of 3~6 m/s²) near zero speed to regional trains could vastly improve their average speed.
Just make the people have a wall/backrest and those forces are harmless. Turn them around for the next stop if you want to brake that quickly or use it to catch up a small train car to a full trai;, have two stories, walkway backwards on top, forwards bottom, and drop the tail off from the through train after it has exchanged people. Don't need seats there, just walls at, like, shoulder width pitch, to let people stand with their back in the right direction.
If only track pairs were more cleanly parallel, you could just have bridges and let people transfer to and from the fast through train using a local access facilitator train. That in particular would also let you catch a connecting train without either of them slowing down (a lot) to provide this opportunity, which might even be the bigger benefit.
Sadly trains take ages to board lengthwise as European track clearance gauge doesn't allow for two proper unidirectional lanes of people traffic with decent cross section left for seating, so you'd have to spread the arrival/departure shuttles between front and back for a single dominant people traffic direction (from arrival seat to their transit seat and onwards to their departure seat).
I guess you could work around by using distinct small shuttles that maybe briefly combine for aerodynamics, in relative breaking distance w.r.t. service brakes, and respond to a switch that doesn't reach a safe locked end position by unfolding wave breaker barricades into the gangway (articulated so that they naturally support people leaning against them due to deceleration forces, so they get kinda pushed into place by people using them) and alerting passengers about the imminent rapid coordinated deceleration. A couple seconds notice should suffice to let people move to hold onto their stuff that'd otherwise go flying from a G of deceleration.
Coming to a stop from 300km/h takes 2.3km (27.8s of travel) at 1.5m/s² (the AFAIK limit for normal standard train carriages to match how the passengers behave), but at 10m/s² it only takes 247m (4.2s of travel).
This would be the minimum dead space/time to stop safely in case a switch fails to transition. Regroup convoys between branching points a bit, and you could run at current-day capacity levels despite most carriages not stopping at any given station (the others just skip past as they didn't branch off).
Honestly I still wonder if suspension rail system Eugen-Langen isn't better for high speed people transport due to the severe passive tilt capability (+-15° in production for a century; +-30° tested (the production deployment wasn't authorized to anywhere near it's tilt angle speed limit for many years, and the frequent stops/stations didn't make that angle look restrictive for the technology at the time: the track isn't even banked as far as I know!)), especially because you don't typically want to share track between high speed people transport and generic mainline rail traffic.
Not needing the extensive tunneling/wide-span bridging ought to make the track suspension requirement worthwhile... Particularly with how cheap we can make steel truss sections in automated factories, and e.g. sling it under the track for transport to installation site. Drop it for the irregular junction areas, and just put cheap normal rail to wheel the segments across the junction.
Roller coaster technology has made the needed fast track switches a proven technology, too. (It's really similar to a suspension rollercoaster just with motors and an electric "3rd" rail.)
I for one can't wait for full ETCS Level 3 to become a thing used in production.
There are also various forms of baulk track – https://en.m.wikipedia.org/wiki/Baulk_road - in which the rails are supported longitudinally with regular tie-bars to maintain gauge. I don’t think this is used much outside of some specialist applications.
This is called "ballast cleaning" if anyone wants to do a search:
The workers seem to be wearing the amount of PPE that I'd want if I was just walking along downwind, but nowhere near the amount I'd want if I was working in the thick of things 8 hours a day. I wonder what their lung disease rates are like.
Still is. There is even an EU exception to the ban because no replacement was good enough.
> In the 19th century and early 20th century, ballast was shoveled or forked, then screened by hand using portable devices.
You have a valid point, they were treated like shit but talk about broad-strokes...
No-one asked, but ... I worked at a power station one Summer, my job was to clean the filters at the bottom of the cooling tower. The filter was a stack of plastic bricks; each brick about 1m x 1m x 2m that were a mesh of orthogonal perforated plastic panels with a spacing of maybe 8cm or so. The filter was stacked about 5 "bricks" deep. We washed the bricks under a running hose of about 20cm diameter, standing in water all day; shaking out the mud. The bricks were heavy because they were full of what seemed like river mud. The detritus from the bricks fell down into the pond below the cooling tower, about 20m beneath us. Small skid-steer cat loaders dug out the pond.
I had a runner's build and was being paid £2.70 an hour (late 1990s); the other guys had weight-lifter builds and were on >£10 (they travelled around the country doing the same job, there wage was good money for low-skilled work at the time). I found out that the agency were being paid about £10 for me ... stood in dirty water all day, with the fall risk, the low wage, ... wasn't great. Then I had to quit because of injury after a few weeks. Knee was never the same.
Also, disappointing they didn't actually show the new railstock being laid, just the ballast and sleepers :/
- Removing the ballast from a section at a time to do the cleaning means that the rails and sleepers are floating in the air (~1:30 to 2:35)
- They're doing all this work, including transferring waste to another train, underneath catenary wires. low clearance!! (3:40 to 5:20)
Also important to note, they aren't so much washing the stones (though that may be part of the process), they're sieving (grading) the stones to remove everything that's under a specific size (looks like they're removing everything that passes a ~25mm/1" sieve, but scale in a video can be deceiving). Rail ballast is very uniformly graded, i.e. every piece of aggregate is about the same size. Vibrations over time will cause edges of the stones to chip and wear down, with these chips contaminating the ballast. It also leads to rounding of the aggregate, so there's less interlock between the particles.
Granular gradation is still a major part of modern roadway construction, there are just certain standards that are very typical so they get used without too much thought required. For some applications a visual inspection is enough, but there's generally some standard proportion of sieve analysis required (eg. 1 test per 10000tonne produced), along with proctor tests (to determine maximum dry density) and frequent nuclear densitometry. I've even seen loads of aggregate get rejected due to the large aggregate being too oblongated.
When you get into concrete or asphalt mix design, the aggregate standards can be even more strict - chemical makeup of the stone can be important to avoid alkali-silica reaction; minimizing fines increases the strength of asphalt mix but creates a tougher riding surface; etc etc etc.
I'd never considered how much "it helps to have rail, to replace rail" impacted the process -- but it makes sense as everything is incredibly heavy! (Rails, sleepers, aggregate)
From that perspective, of course you'd excavate and clean the track ballast while you're also on the same track. And same with sleeper and track replacement.
Planes, for example, can share the same geographic location -- just at different altitudes; e.g. 25000 ft vs 33000 ft vs 45000 ft., etc. After a certain altitude there isn't anything. No clouds, no birds, just air; set your auto-pilot and go. Takeoff and Landing can be hairy, and you gotta worry about mountains, but that's about it. A basic radar makes it easy to see, and not hard to broadcast by radio.
Same basic idea for space. Gotta get out of orbit and not get cooked by radiation, but otherwise there is a whole lotta empty, and it's not hard to see what's going on with things like radar.
On the ground it ain't so simple. Someone stuck on a rail, avalances, bridge collapses, hills vs inclines, snow / ice / rain / high-winds, and no ability to multiplex, so scheduling gets even harder since there are only so many ways into or out of a location. Trains full of high explosives or toxic chems drive right through downtown areas, often multiple times a day. From a crime and security perspective, airports are locked down pretty hard, while most people could probably just drive to a siding near them and fuck around; you can derail a train with a $400 block of steel you can order online. Communication and signal loss is also way more complicated, esp. if you're going through a mountainous or remote area.
Caltrain outsources much of their maintenance of way work, and it shows.
[1] For some value of "they". I don't know if Caltrain does it that way; most mainline US railroads do.
[2] That is, within a few days. Not necessarily within the time of someone hanging around to watch.
https://www.youtube.com/watch?v=vINzBkK1d-k
Note that the ballast hoppers have a solar panel on them to charge a battery, which runs a motor to actuate the hopper doors. Much better than a couple of guys with a wrench.
(a) If you fill all the gaps, water can't get in in the first place, and it doesn't need to drain. Abstract out the problem.
(b) If water can still get in, it can also get out.
https://grn.ams3.digitaloceanspaces.com/wp-content/uploads/D...
Truly almost all new lines should be built this way, its simply a far, far better method. Slightly higher capital cost but far less maintenance.
Army Experiments In Train Derailment (1944) https://youtu.be/agznZBiK_Bs?t=15
It is important that these crushed stones stay clean. If dirt gets in them, known as fouling, filling the gaps between the stones, then eventually it will cause a derailment.
Briefly, the stones move slightly as each train passes above them. The tracks 'float' on the denser stone. This effect helps keep the track straight and level - higher regions get pushed down, while lower regions raise themselves up.
Fouling stops this effect, and eventually the track will become so uneven that a derailment happens.
To prevent this, a big part of railway maintenance involves digging out all the stones, washing them to get rid of sand and soil, and putting them back. Usually done every 25 years or so.