News for hackers. Stuff that matters.
Re:Why do railway tracks have crushed stones alongside them? by AnimalMuppet on Sunday June 04, 2023 @04:57PM (#36189516)
They'll[1] usually follow[2] that with a machine that picks the rails and ties/sleepers up and lays it back down on top of the newly-dropped ballast.

[1] For some value of "they". I don't know if Caltrain does it that way; most mainline US railroads do.

[2] That is, within a few days. Not necessarily within the time of someone hanging around to watch.

Re:Why do railway tracks have crushed stones alongside them? by Animats on Sunday June 04, 2023 @05:29PM (#36189766)
Here's a video of that operation.[1] Yes, they really did level the ballast by putting a spare railroad tie ahead of the wheels of the hopper car. This was before the upgrade to concrete ties.

[1] https://www.youtube.com/watch?v=UWvuYdVV5-Q

Re:Why do railway tracks have crushed stones alongside them? by chiph on Sunday June 04, 2023 @09:38PM (#36191295)
That was 23 years ago, but still looks low-rent. Here's how Brightline & the Florida East Coast Railroad are doing it in Florida for their double-track (mostly) expansion to Orlando.

https://www.youtube.com/watch?v=vINzBkK1d-k

Note that the ballast hoppers have a solar panel on them to charge a battery, which runs a motor to actuate the hopper doors. Much better than a couple of guys with a wrench.