However, for low capacity hops the cost of additional insulation and extra copper needed to achieve ampacity (for worst case fault currents-- the cable must have higher capacity than the breaker so the breaker trips first and with 3ph you have three over-provisioned conductors instead of two) may make it worse off.
Even if an extra conductor in the line was a few hundred dollars, I’d rather have one less common failure point. In AZ AC is effectively required in the summer. AC outages are similar to winter furnace outages in northern areas. I have extra caps ready to deploy (we lose a cap about every 3 years across multiple units) but have never needed to unexpectedly replace copper.
The fact that they might have a higher list price than a conventional single-speed outdoor unit and indoor evaporator coil is a red herring, as the conventional units can’t do anything on their own, and they need a furnace and a fan added to be useful.
I agree that less failure points is nice, however you have to consider the tradeoff. Is it worth $100? Probably. What about $1000? $2000? If it's $2000, why not just get a more efficient inverter based one, which doesn't have a starter cap in the first place?
Split-phase system and 110V are currently more expensive in term of infrastructure.
The distribution itself is done in 3-phases power, even in the US. The conversion to 110V and split phase is done in the last mile as close as possible to the termination point to limit losses. You have to have tiny power transformers everywhere and this has a significant cost.
At the opposite, end-to-end 400V three phases system requires to have only one large transformer by Area. Generally directly connected to High Voltage (20KV in Europe).
Standalone houses usually have multiple houses connected to one single transformer. How much depends on density of the houses. For apartment buildings and other dense power needs, there's high voltage directly into the complex, then it's stepped down within the complex to meet the needs.
Instead of those little pole-mounted transformers that are common in the US, we have one of these buildings with a large transformer for each neighborhood https://dms-cf-08.dimu.org/image/032ykUus1ixX?dimension=1200...
https://electrical-engineering-portal.com/north-american-ver...
They do currently.
I can at talk for the French and Swiss system.
- Entire neighbourhood are served by a single 400V 3-phase transformer. - For critical infrastructure, you do have sometimes two transformers in redundancy on the same local loop in case of failure on one.
There is no need for the pole type of transformer everywhere in the street with double layers of cable like in Japan or in the US.
You might find that interesting:
https://data.enedis.fr/pages/cartographie-des-reseaux-conten...
This map references all transformers and distribution lines for the french network nationwide for terminal loops. These are open data: Enedis is a the public operator.
"Poste" is the French Jargon for transformer. BT is for low voltage. HT is for anything >1000V.
Like you will see yourself, the density of transformer is of the order of 10x less than in the US/Japanese model.
Example of appliances: HVAC, induction heaters, boilers, car chargers, solar panels inverters, ...
I know of at least one, but I am ignorant of many other things and this just comes from my understanding of AC motors but: Any directly connected AC fan will have enormous benefits in terms of performance and efficiency with three phase.
Controlling the motor with a VFD is how you increase the efficiency and performance of a three-phase motor, simply being a three-phase motor provides no efficiency benefit other than you can use slightly smaller conductors to power the motor.
The problem is getting the motor to start spinning. You cant start all motors on just one or two phases. And if a motor isn't spinning, it's essentially a short.
Three phase wiring is so ubiquitous here, there is nearly no additional cost.
It may be offset, as others point out, by power delivered being higher (and thus, wire gauge can go down) when running 3 phase... however that will largely depend on the load.
I have monitoring on all the phases on my house (in Sweden) and I can charge two electric cars, run the heating in winter, run the washer and drier and cook with two ovens a microwave and the induction hob at the same time and everything just works.
Things on three phase in my home: swimming pool, sauna, induction hob, electric car chargers, heating system and I have sockets to plug-in welding and other power hungry equipment. The rest is split on the phases. I can’t remember whether my solar system supplies on three phases or not but I think it does.
Yes, we have it so we use it - for sure.
The pool pump on 3 phases seems slightly more efficient when I compared them last time. The pool is also being fitted with a heat pump inverter, which doesn’t need 3 phase.
That can easily support all the things you listed and do it for a 2500 sq ft house, based on the overly conservative and outdated US NEC lead calculations.
Vs. checking a couple commodity pricing web sites - copper is currently ~$3.85 per pound.
I really doubt the motor of any "residential" HVAC unit is heavy enough for that "hundreds of dollars" to actually pan out...
To note, as mentioned, copper is not the only cost here. You also need another pole to your breaker, which adds cost. Plus busbar upgrades. And more.
The cost of termination of 3 phases is insignificant compared to the cost of the rest of an electrical system in a modern home.
It’s the better system.
What's the deal with your electric showers anyway? Surely it's more efficient to heat in a central location and distribute both a cold and a hot water circuit through the building...
Probably talking out of my ass, it's just so weird and I haven't seen it anywhere other than in the UK.
On-demand heating has the advantage that there is no thermal loss due to keeping a large amount of water (plus piping) hot 24 hrs a day.
Plus water is not wasted in waiting for hot water to arrive each time a tap is switched on.
Back in the days of Coal-fired power stations, people were encouraged to use storage hot water systems which were automatically switched on at night, so the the power stations could continue running because of the large base-load power demand.
However the modern Solar/wind generated power systems are the opposite, they much prefer loads which are only on during the daytime.
Regarding solar HWS: The cost of heating panels, piping, and installation, has meant that they are fast disappearing from the market. It's better to add a few extra solar electric panels and use on-demand HWS, either with battery storage or via grid connect.
I've just been down this route with a new solar electric plant. I had originally assumed that Solar HWS would be included, but after doing the calcs, have abandoned the solar heating panels and instead opted for a few more solar electric panels plus extra Lithium batteries. It means I have a lot more storage that can used for many different purposes.
Heat pump heater can be run when solar panel generates so much energy (energy price is low). That's a similar thing as batteries for energy use time shift.
I've seen them (my parents have one) in the UK, and lower income countries in South America, Asia and Africa.
You are very luky! The standard installed power for residential use in Italy is 220 V, 3.3 kW.
Said 50m² apartment has 16A triple-phase installed, but the breaker box is wired to be capable of safely drawing up to 63A triple-phase from the grid if I needed it.
This results in a big payoff for efficiency, however: high efficiency AC and heat pumps for water go a long way in increasing how much you can do on so much little power.
Jokes aside, I think that this ends up incentivizing an efficient use of energy. That's not so bad after all.
Induction hobs, saunas, EV chargers, to name some.
> and is the benefit outweighed by the additional cost of more copper for the additional wires?
Additional cost? You don't run that many 3-phase circuits, so the cost is negligible, and your 110V circuits require substantially higher current than ours (meaning thicker wires) so if anything I'd guess the cost for wiring a US home is on average higher than a European home.
You can add: Heat pump, electrical water heater, well pump, ovens.
I lived in both Europe (400V) and Japan (100V).
In Europe I do have an EV charging station 3-phase power with 22KW capacity at home. It does not requires anything special in term of cabling.
And it is enough to reload a Tesla in 4-5 hours, it makes EV ownership a lot easier.
Doing that with the 100V power-grid Japan is simply impossible. Most grid operator will refuse to connect 3 phases power to individuals.
Modern heat pumps in Japan with inverter is just fine with 100V or 200V for home, even for cheaper coolers. 200V hear pump electrical water heater (with tank) too.
Most houses sign up only up to 6kW or 10kW electricity, so EV charger will become a problem for family that has multiple EVs, but they will be fine with slower charging at night in most cases.
It's pain that common 100V ovens works poorly. 100V Washer dryer works barely okay thanks to efficiency.
Obviously 100V would be terrible for high power stuff. I'm not suggesting that. But, 240V split-phase is more than sufficient for the vast majority of residential appliances, including EV charging.
They do too. You have lower current intensity, lower cable diameter, lower losses.
For EV charger it is even more relevant because anything inverter based has (theorically) a better efficiency in a three phases system.
The only drawback of three phase power is currently the cabling complexity. The home electrical panel need to be careful of the phases's balance.
Regarding EVs... I would assume that depends on the design. No EV sold in north america is even capable of being charged off 3-phase AC anyways, so it would require quite the redesign.
don’t cheap out on wiring. a few years after you move homes, you find some new hobby: woodworking, CNC or 3d printing, restoring pinball/arcade machines, HiFi audio, hosting LAN parties or just a few beefy gaming or video editing rigs, hot tubs, _whatever_. you can’t predict it, but there’s a good chance it’ll need power, and once you pass 1500 W in one area of the home you’re gonna either be playing the “semi-permanent 50-ft extension cords bridging the under-utilized circuits to the over-utilized rooms” (and shuffling those around with every spring cleaning) or paying 4 figures to rip out the drywall and rewire shit. just pay that up front: it’s not worth the hassle and if you have a decent realtor you’ll recoup the bulk of the investment come sale time.
due to the higher voltage in europe, conductors tend to be quite a bit thinner than in the US, to carry the same amount of energy. That being said, our electrical installations tend to be much beefier than most US residential, so a lot of copper is used. in Denmark for example standard for houses is to be fused at the roadside box for 3x~30A
Overall, it can heat things up more quickly than a typical gas or electric stove while being more efficient. And you can quickly change the temperature like with a gas stove.
For example, a common big motor that needs a starter capacitor is a HVAC unit. Usually the copper to run those is extremely expensive, on the order of hundreds of dollars. Adding an additional wire may add an additional hundred dollars or more. By comparison, starter caps are quite cheap. $20 for a HVAC sized one. That also isn't counting any of the costs of three phase infrastructure for breakers etc.
That also isn't even counting that many appliances are moving to inverter based technologies that don't utilize induction motors at all, such as induction hobs. Or, many appliances with no benefit from extra phases (resistive heating devices such as ovens, dryers, toasters, etc).
Seems to me that the tradeoff is worth it.