Re:Nashville uses eminent domain to block data center near zoo by kortilla on Wednesday August 05, 2026 @11:01PM (#49191886)
The anti-datacenter movement seems so filled with propaganda (water usage despite being less than golf courses, etc) that it’s hard to believe people aren’t being influenced by some foreign state. You could build a stockyard to slaughter pipeline and get far less pushback while using way more water and having an actual negative impact to all of the surrounding area through the entirety of your operations.

Hats off to whoever is stoking this. It’s witchcraft trials levels of hysteria.

Re:Nashville uses eminent domain to block data center near zoo by Avicebron on Wednesday August 05, 2026 @11:10PM (#49191944)
DC's are being used as a proxy for power and wealth disparity. Fix that. Have an actual measurable plan for general prosperity (health care, QoL, housing, you name it) and the data centers won't be a concern
Re:Nashville uses eminent domain to block data center near zoo by no-name-here on Wednesday August 05, 2026 @11:27PM (#49192070)
The issues you listed seem intractable in the U.S., and the current NIMBYism towards data centers seems likely to make NIMBYism towards housing even worse - a number of the same arguments that were used against housing are now being used against DCs, but we’re seeing a whole new level of NIMBY tactics being tried out - I expect we will see similar city-wide/county-wide bans on multi-family housing, mass transit, mixed zoning, etc - or use of eminent domain to block housing projects, etc. if this kind of NIMBYism becomes accepted or even celebrated against DCs.

Or for your suggestion to “fix healthcare” - how and by whom? The solutions that those on the left push are anathema to the GOP, etc.

Re:Nashville uses eminent domain to block data center near zoo by Gigachad on Wednesday August 05, 2026 @11:18PM (#49192010)
Pretty much, disrupting datacenter builds is one of the few ways people can fight back against evil tech billionaires.
Re:Nashville uses eminent domain to block data center near zoo by conductr on Wednesday August 05, 2026 @11:24PM (#49192051)
Aesthetics are important. Everyone enjoys looking at a golf course, even non-golfers. Nobody wants to look at a datacenter.

My general thought is, what’s the argument for placing them in populated areas to begin with? Why dedicate land use for it in Nashville? Wouldn’t putting it 40 miles outside town work just as well? Why don’t we create development zones specifically for these things? In Dallas we have a similar thing for our distribution hub, it’s south of downtown kind of in the outskirts and in an economically struggling area. Same for industrial areas, it’s usually something that’s zoned to a particular area so residential neighborhoods aren’t really affected. It’s not land where the community may benefit more by literally anything else (sometimes even a Walmart is better than a datacenter). I assume that’s where this is all headed, cities need to roll out their long term vision of where datacenters fit into their city, if at all. Until then, it’s all these small battles and the information used by opponents doesn’t really matter. If enough people don’t want it, it should probably go somewhere else. This is not serving any community benefit so I don’t see any reason why it has to exist where the developers want it to.

Expecting rational opposition is actually irrational. They just don’t want it. The why is varied and probably based more on emotion than anything else.

Re:Nashville uses eminent domain to block data center near zoo by kasey_junk on Thursday August 06, 2026 @12:18AM (#49192372)
Re:Nashville uses eminent domain to block data center near zoo by kube-system on Wednesday August 05, 2026 @11:33PM (#49192111)
> what’s the argument for placing them in populated areas to begin with?

Colos advertise their proximity to populated areas. It is desirable for physical access, latency, and connectivity.

Re:Nashville uses eminent domain to block data center near zoo by hackernud3s on Wednesday August 05, 2026 @11:49PM (#49192204)
Right? How do people not understand this? Have fun with your super-high latency when the DCs leave your city.
Re:Nashville uses eminent domain to block data center near zoo by kube-system on Thursday August 06, 2026 @12:12AM (#49192338)
It’s not necessarily “super high” latency to connect to data centers at a distance. Whether or not it matters depends on the application, and for most consumer applications it isn’t a huge issue. For AI data centers it doesn’t really matter.
Re:Nashville uses eminent domain to block data center near zoo by 3eb7988a1663 on Thursday August 06, 2026 @12:44AM (#49192554)
The signal speed in fiber is some 200k km/s. If you go 10 miles outside of a city, you are adding 0.1ms ping, and you will have dramatically fewer pitch forks.

The ping between New York and LA is ~70msec. Chatting with a LLM is not latency sensitive.

Re:Nashville uses eminent domain to block data center near zoo by kube-system on Thursday August 06, 2026 @02:58AM (#49193422)
But if it’s a colo it’s unlikely to have many LLMs running there. The big AI datacenters are mostly purpose built.
Re:Nashville uses eminent domain to block data center near zoo by bryan_w on Thursday August 06, 2026 @02:56AM (#49193400)
Is this DC even for LLMs? I've not seen any sign of that.

Considering that the initial build out was only 10MW, it seems unlikely that was the primary usecase.

Re:Nashville uses eminent domain to block data center near zoo by otherme123 on Thursday August 06, 2026 @02:05AM (#49193029)
That makes no sense: are they going to use this datacenter exclusively for Nashville people use? We regularly access data from datacenters thousands of kilometers away, and the latency is acceptable. Not even pro-gamers would notice the latency increase if the datacenter moved 10 kilometers further in any direction, which is virtually empty in Nashville.

I live in Spain, and my latency to my VPS at Germany, 3,000 kilometers away, is 40 milliseconds. Good enough. A traceroute shows that I have to pass through Madrid (400 km away), with a ping of 5 ms. Do anyone believe that moving datacenters within neighborhoods to shave additional 5 or 10 km is noticeably good for the latency, when 100 km mean extra 1 ms on average? Apparently the Nashville neighbors don't give a shit about -0.1 ms latency.

We have a couple of small datacenters nearby. Luckily they are somewhat isolated from where people live, because the things are noisy at all times, and each year they add more capacity, more refrigeration towers and more noise (all efficiency gained at the CPU/GPU level is used to increase density, not to lower consumption or cooling needs). Nobody would want to live less than 200 meters away from them.

Re:Nashville uses eminent domain to block data center near zoo by kube-system on Thursday August 06, 2026 @02:14AM (#49193093)
If it’s a colo… yes, it would be primarily local customers. Data centers are not just for consumer B2C services. There’s a lot of stuff that runs in data centers that are both more important and more sensitive to latency or connectivity than video games.

Even for something as simple as a business that needs somewhere to run critical VDI hosts — then yes, they need low latency and somewhere that their techs can physically get to if they need to fix something.

You may also need interconnects to specific physical networks that are only available in certain places. You may need direct connections to partner equipment. This requires physical presence.

Colo space is not something you rent if a VPS is good enough for what you’re doing.

Re:Nashville uses eminent domain to block data center near zoo by conductr on Thursday August 06, 2026 @03:05AM (#49193454)
If they zoned it, then the city is saying “you will commute”. It doesn’t have to be unreasonably far away, just less convenient than a Walmart. Most people commute for work anyway, business rent storage/warehouse space in cheaper part of town than their office space, etc. Its hyperlocalness isn’t crucial to its function.
Re:Nashville uses eminent domain to block data center near zoo by kube-system on Thursday August 06, 2026 @03:17AM (#49193532)
Yeah, I commute 45 minutes to mine. That’s entirely reasonable for my use case. If you’re not doing something like HFT, then being in the same metro area is fine for most purposes.

I was responding to why you wouldn’t want one in a different freakin country

Re:Nashville uses eminent domain to block data center near zoo by no-name-here on Wednesday August 05, 2026 @11:44PM (#49192184)
> placing them in populated areas

The photo at the very top of the article shows an incredibly low density area. If someone was expecting to see urban density, or even single story main street density, it isn’t in the location shown in the photo.

Re:Nashville uses eminent domain to block data center near zoo by darth_avocado on Wednesday August 05, 2026 @11:54PM (#49192230)
Try living next to a constant 80-100 dB hum 24x7. You’d not be complaining about people being irrational.
Re:Nashville uses eminent domain to block data center near zoo by bruce511 on Thursday August 06, 2026 @01:22AM (#49192789)
I'm sure there are data centers that make a noise. And if you're firing up a generator that's a separate issue.

But the noise from computer fans and power supplies is easy to ameliorate and can be a trivial permit requirement.

The noise is all high-frequency which means most anything will stop it. Frankly building an earth berm around the site would kill all the noise and make it better to look at. Throw in some trees and you're done.

I get the water and power concerns. But (in the right locations) both are solvable. Power can be balanced with power generation (off site) especially solar and wind. Water isn't really "used" it's just necessary as a heat-sink so as long as it's available it can stay available.

Yes, govt should write permits carefully. And there are locations it is not suitable. But opposition to data centers in general is just hype.

Re:Nashville uses eminent domain to block data center near zoo by kube-system on Thursday August 06, 2026 @03:13AM (#49193507)
Absolutely zero noise from any datacenter comes from the fans or power supplies of the equipment inside of it. The equipment is inside of the building.

Datacenter noise comes from the chiller units.

Re:Nashville uses eminent domain to block data center near zoo by bruce511 on Thursday August 06, 2026 @06:25AM (#49194825)
Fair enough, but again that noise is easily dealt with by proper planning and permitting.

Given that chillers exists in lots of places it seems like this is a solved problem.

Re:Nashville uses eminent domain to block data center near zoo by lovich on Thursday August 06, 2026 @02:19AM (#49193131)
> The noise is all high-frequency which means most anything will stop it. Frankly building an earth berm around the site would kill all the noise and make it better to look at. Throw in some trees and you're done.

Have any of these data centers done this? All the ones I’ve seen haven’t even put up a sound baffling wall. If a data center’s owner has taken steps to ameliorate or completely prevent their negative externalities then opposition to them definitely looks like NIMBYism.

If, however, you’re just saying they _could_ prevent the problems, but then never do, I’m even more inclined to support the people telling them to fuck off.

Re:Nashville uses eminent domain to block data center near zoo by bruce511 on Thursday August 06, 2026 @06:29AM (#49194852)
The developer (likely) won't do it in isolation.

But the point of building permits, and building regs and so on is to create requirements that let the development live in harmony with the community.

If local govt is not stipulating the requirements then that's on them.

People don't need to be "against data centers" they need to be "for no noise" and so on.

Re:Nashville uses eminent domain to block data center near zoo by lovich on Thursday August 06, 2026 @02:05PM (#49200167)
> The developer (likely) won't do it in isolation.

Do you not see how people might be angry at someone who dumps their problems onto your doorstep unless the government forces them not to?

Re:Nashville uses eminent domain to block data center near zoo by bruce511 on Thursday August 06, 2026 @03:08PM (#49200940)
You don't get angry with the scorpion for stinging the frog. He is just behaving according to his nature.

The US is in a late-capitalist phase right now. It's gotten here because the voting public think it's a good thing. Every two years they go to the polls and vote for "business friendly" parties and policies. And indeed most Americans today would say Capitailism is great, Govt intervention is bad, fewer regulations gets stuff done. Anything other than rabid capitalism is defacto Communism.

And while very popular right now getting angry at all serves no purpose. When everyone is angry about everything all the time it ceases to be notable.

What is purposeful is taking an interest in local govt. It's alerting your council as to your concerns. And by encouraging neighbors to do the same. It's in thinking beyond the simplistic "pro business at all costs" rhetoric. It's understanding that current US policies, foreign and domestic, are specifically designed to make companies richer and citizens poorer.

And understand that you're not in a fight to stop development. You're in a fight to make the development work in harmony with the community, and not against it. The opposite of ugly corporate behavior is not communism.

Re:Nashville uses eminent domain to block data center near zoo by lovich on Thursday August 06, 2026 @03:37PM (#49201325)
> You don't get angry with the scorpion for stinging the frog. He is just behaving according to his nature.

It’s a nice analogy but it’s still people making these decisions. I will in fact get angry at someone who decides to dump their trash on my lawn because it’s in their nature to be a piece of shit. And that’s why people are angry at these data center companies.

> And understand that you're not in a fight to stop development. You're in a fight to make the development work in harmony with the community, and not against it.

Yea, and people vote to not have data centers in their towns and get overridden anyway. So now it is a fight to stop development, from the view of these people trying to stop the data centers from being built and dumping noise and air pollution on them.

> The opposite of ugly corporate behavior is not communism.

Don’t know where this non sequitur came from. At no point was communism being discussed. Being against actions of companies that have a negative impact on your life does not have anything to do with communism.

Re:Nashville uses eminent domain to block data center near zoo by kube-system on Thursday August 06, 2026 @03:11AM (#49193495)
That depends highly on the datacenter. While a huge hyperscaler might be noisy, many datacenters are quiet enough that people don’t even know they’re there.

The one I host at, you can’t hear from the end of the parking lot. The coolers aren’t any noisier than the ones on other commercial buildings. These kinds of datacenters are everywhere and most people probably just think they are warehouse or office building.

Re:Nashville uses eminent domain to block data center near zoo by conductr on Thursday August 06, 2026 @06:30PM (#49203524)
We build residential right up to 20 lane freeways with heavy traffic speeding 75+ miles an hour. The tire humming is loud too.
Re:Nashville uses eminent domain to block data center near zoo by jmkb on Wednesday August 05, 2026 @11:35PM (#49192128)
I do not enjoy looking at a golf course. (A minigolf course is a different kettle of fish.. of course.)
Re:Nashville uses eminent domain to block data center near zoo by Mikhail_Edoshin on Thursday August 06, 2026 @12:44AM (#49192550)
A normal computer company mixes finely with residential and commercial spots: clean and quiet operation, employees can live closely, etc. A woodworking shop would be noisier. But it has to be normal, not a cryptominer or something like that.
Re:Nashville uses eminent domain to block data center near zoo by kortilla on Tuesday August 11, 2026 @01:27AM (#49253723)
Most of the datacenters I’m seeing protested out in the west are already in zoned areas for industry or are in the middle of nowhere and people still reject it.
Re:Nashville uses eminent domain to block data center near zoo by conductr on Thursday August 20, 2026 @01:42AM (#49370782)
Software eating the world was a cute saying until it physically manifested as datacenter proliferation. I think it’s the case that people simply don’t like tech right now. The industry has gone from hero to villain in many people’s minds. When the narrative is openly, we’re all in on AI, and AI will take your job, then they say “can we build a datacenter in your neighborhood?” pushback should be expected. Even if this specific DC is not AI focused, when people hear datacenter that’s where their mind goes.
Re:Nashville uses eminent domain to block data center near zoo by mapping365 on Wednesday August 05, 2026 @11:05PM (#49191912)
Backlash is just a natural consequence in a democratic society to the absolute accelerationist mindset that AI development has taken since 2022. Actions meet consequences. I mean it wasn't so long ago they were talking about wiping out all white collar work and consigning most the country to the permanent underclass. If you look at how the rest of the economy has been starved of capital to fund all this and how its contributed to inflation and job insecurity, it doesn't really take a foreign actor to spark a massive backlash.
Re:Nashville uses eminent domain to block data center near zoo by kortilla on Tuesday August 11, 2026 @01:25AM (#49253712)
But that’s stupid of the locals to block it. They are rejecting the little bit of money that would come into their economy from the AI investment.
Re:Nashville uses eminent domain to block data center near zoo by eel on Wednesday August 05, 2026 @11:47PM (#49192195)
Data center water usage varies heavily by design and climate. Most data center providers are not openly publishing water usage, and when they do publish metrics they hide behind derived metrics like WUE. So I don't blame the opponents for any "hysteria".

When we look at data we actually have [0], we can see for example AWS data centers in Oregon consumed 284,000,000 gallons of water in 2024. By their own estimate 100% of that water is typically consumed in the summer months of June, July, August, and Sept. These are also the months that farms use the most irrigation, lawns use the most, etc. Also, keep in mind that Eastern Oregon has ideal weather for evaporative cooling (specifically low humidity). Evap cooling is used for data centers in more humid parts of the country/world and can be significantly less water efficient.

The average Oregon resident uses 80 gallons of water per day, or 29,200 gallons of water annually. And if you calculate it out In 2024, AWS in Oregon used water equivalent to 9726 residents' annual usage. Is that a lot? What if you add all the other data center operators in the area? I don't know. Is they causing unrealistic pressure on aquifiers and the Columbia River watershed? I don't know either. Is the trade off of water consumption for data centers worth it? I'm not really sure how to answer these questions, but I think it starts with data center operators and their utilities being more open about their usage. Today data center operators like to compare their newest DC designs to golf courses and household use and it's not showing the full story.

[0] https://www.oregon.gov/energy/get-involved/Documents/2026-03...

Re:Nashville uses eminent domain to block data center near zoo by chillfox on Wednesday August 05, 2026 @11:15PM (#49191994)
AI datacenters have very real negative effects on the communities they are located in like noise pollution and increased power prices. If you manage to defeat the water reason then people will just start using some other reason.
Re:Nashville uses eminent domain to block data center near zoo by kortilla on Tuesday August 11, 2026 @01:32AM (#49253750)
Those aren’t real though. That’s just more propaganda. The noise can’t be heard very far away and power prices aren’t necessarily increasing if it’s increasing base load enough to amortize a large generation source better.
Re:Nashville uses eminent domain to block data center near zoo by flerchin on Wednesday August 05, 2026 @11:13PM (#49191973)
The biggest externality is the electrical usage. IDK why they keep mentioning water. The AI DCs are driving huge loads to grids, and all ratepayers are being asked to pay for that. IMO if they built a solar + battery farm on grid, paid by AI DCs, there would be no significant hurdles.
Re:Nashville uses eminent domain to block data center near zoo by altcognito on Thursday August 06, 2026 @12:11AM (#49192330)
I used to think it was just electricity. It could be just electricity, but when they try to divert hundreds of millions of gallons out of water scarce resources like the colorado river[1] in dry, HOT areas where water usage rises -- you can begin to understand why people are irritated. Even if you get promises of using closed systems, corporations are liars.

I think these corporations do a lot of harm to their own arguments.

[1] - https://www.8newsnow.com/news/local-news/data-center-develop...

Re:Nashville uses eminent domain to block data center near zoo by bryan_w on Thursday August 06, 2026 @02:59AM (#49193426)
This is about a DC in Nashville -- it is on the Cumberland river.
Re:Nashville uses eminent domain to block data center near zoo by altcognito on Thursday August 06, 2026 @11:08AM (#49197769)
As someone who lives in the great lakes region, we don't assume that because the resource is large in comparison to a human being that it is an endless resource.

DCs operate at the scale of agriculture, even this one will consume/expel significant resources.

Are they asking for treated water? What's the concentration of residual metals, bromine and salts? Who is monitoring it?

It's inconvenient. Think of it as tech debt. You can either pay it down now, or you pay it down later.

Re:Nashville uses eminent domain to block data center near zoo by jjpones on Wednesday August 05, 2026 @11:06PM (#49191920)
Yes, we should be looking into the wasteful water use in golf courses too.
Re:Nashville uses eminent domain to block data center near zoo by OptionX on Wednesday August 05, 2026 @11:38PM (#49192148)
A stockyard doesn't consume into the gigawatts of power.

There is not a concerted effort to build thousand upon thousands of stockyards across the globe.

Stockyards wont increase the planets reliance of oil, since green technologies don't scale that fast. Same planet that feeling the effect of climate change quite clearly.

All for close to zero upside for the surrounding community. At least the stockyard would have given you cheaper meat. What are data centers going to give? Discount tokens?

That's why your stockyard does not have the same pushback.

Re:Nashville uses eminent domain to block data center near zoo by kortilla on Tuesday August 11, 2026 @01:30AM (#49253741)
Stockyards and the increase in beef consumption it enables would do far more damage global warming-wise than increases electrical load that could be solar offset in a few years.

Also nobody is pushing for “thousand upon thousands” of these. Again, hysteria

Re:Nashville uses eminent domain to block data center near zoo by HWR_14 on Wednesday August 05, 2026 @11:03PM (#49191903)
> water usage despite being less than golf courses, etc

Golf courses are a common example of wasteful water use.

Re:Nashville uses eminent domain to block data center near zoo by PlasmaPower on Wednesday August 05, 2026 @11:06PM (#49191922)
Then why is no one eminent domaining golf courses? Clearly there are other factors at play here
Re:Nashville uses eminent domain to block data center near zoo by majormajor on Wednesday August 05, 2026 @11:10PM (#49191950)
Well nobody is eminent domaining existing data centers, are they?

Try to build as many new golf courses as there are new data centers going up and you might get a similar reaction...

Re:Nashville uses eminent domain to block data center near zoo by asutekku on Wednesday August 05, 2026 @11:16PM (#49192003)
Golf courses do not emit noise, they are relatively nice looking and they are not a threat for people to be unemployed.
Re:Nashville uses eminent domain to block data center near zoo by PlasmaPower on Wednesday August 05, 2026 @11:27PM (#49192074)
Yeah, those might be some of the other factors. My point is just that actual water use does not explain datacenter pushback well, despite being a predominant argument against them.
Re:Nashville uses eminent domain to block data center near zoo by amanaplanacanal on Thursday August 06, 2026 @05:16AM (#49194370)
I hear electricity prices and noise about as often as water usage.
Re:Nashville uses eminent domain to block data center near zoo by toofy on Wednesday August 05, 2026 @11:31PM (#49192098)
of course there are other factors at play here. has anyone tried to hide their motives?

look, i use llms for some work and for some hobby projects, but lets not pretend like the companies behind the llm bubble would ever fight fair. that would be naive to an extreme.

Re:Nashville uses eminent domain to block data center near zoo by SoftTalker on Wednesday August 05, 2026 @11:26PM (#49192067)
A lot of golf courses are owned by cities or other public entities.
Re:Nashville uses eminent domain to block data center near zoo by PlasmaPower on Wednesday August 05, 2026 @11:31PM (#49192094)
Then they should be even easier to shut down if they're viewed as a wasteful use of water! I think the fact that they are not shut down is evidence that people do not in fact view them as such, or at least not as much people view data centers as a waste of water.
Re:Nashville uses eminent domain to block data center near zoo by runako on Wednesday August 05, 2026 @11:35PM (#49192130)
As the xAI debacle in Memphis showed, once construction begins the locality may lose the ability to enforce existing laws around e.g. noise, pollution, etc. that normally serve to contain negative externalities. (This is a side effect of the rule that people who are rich enough are immune from laws.)

Since more precision remedies are off the table, all that's left are gross mechanisms like bans and eminent domain.

Nobody sane would accede to admitting a new community member who is a priori immune to local laws.

Re:Nashville uses eminent domain to block data center near zoo by bruce511 on Thursday August 06, 2026 @01:34AM (#49192871)
Yes, I think bad behaviors do play a part. With any development there has to be some level of trust between the developer and community (where the community are typically represented by local govt.)

Once that trust is eroded it can be difficult to get things built. If you lose trust in the govt the developer won't build. If trust in the developer is lost then permits just stop.

And yes, I think community trust in AI data centers is very low. Perhaps some more creative approaches will be necessary in the future to build up this trust again.

Data centers could be very good neighbors. They could be built in astheticly pleasing ways. They could balance elec consumption with production. They could operate cooling and simply return "warmer water" to source.

Unfortunately under the current cultural circumstances none of this can be taken for granted. Corporations have (very much) lost our trust in the effort to squeeze every last dime of profit out of everything. This is the American way.

Re:Nashville uses eminent domain to block data center near zoo by kube-system on Wednesday August 05, 2026 @11:38PM (#49192145)
The public discourse for any sufficiently technical topic sounds misinformed to anyone who understands the topic well.

However that doesn’t mean that people don’t have real grievances, even if misplaced.

Re:Nashville uses eminent domain to block data center near zoo by mikeweiss on Wednesday August 05, 2026 @11:11PM (#49191951)
I mean.... I don't know about where you live but where I am in the North East, electric prices have near doubled in last few years... the people are blaming AI and data centers for this, I'm sure it's not 100% the culprit but the people are looking for someone to blame and some sense that they can control it. Local zoning and municipal ordinance are one of the few ways small folk can assert power.
Re:Nashville uses eminent domain to block data center near zoo by dosisking on Wednesday August 05, 2026 @11:16PM (#49191995)
I put the blame on AI and data centers. The Powers That Be want the AI surveillance state. Funny how they don't care about the Climate Change agenda anymore, now that they have AI.
Re:Nashville uses eminent domain to block data center near zoo by sophacles on Wednesday August 05, 2026 @11:19PM (#49192025)
Companies will always adopt the stances of the ruling party, its part of the core concept of limited liability ownership. Its one of the primary reasons people hate actual capitalism (by which i mean the thing that actually exists and is called capitalism).
Re:Nashville uses eminent domain to block data center near zoo by ajkjk on Wednesday August 05, 2026 @11:35PM (#49192134)
Perhaps you saw https://news.ycombinator.com/item?id=49180901 on here yesterday?
Re:Nashville uses eminent domain to block data center near zoo by AppAttestationz on Wednesday August 05, 2026 @11:20PM (#49192027)
1. A concern is not invalid merely because something else is worse. 2. Leaping to influence by foreign state is non sequitur. What evidence have you observed for that? How do I know you haven't been sent by the corporate tech elites? 3. Focussing on water strawmans the other arguments against data center imho.

I tend to agree with your sentiment, I think datacenters are getting more shit than they deserve, but there are better arguments to be made.

With patience, love and a bit of humor. X

Re:Nashville uses eminent domain to block data center near zoo by paimapi on Wednesday August 05, 2026 @11:17PM (#49192006)
my state power commission just passed a plan to build out 9.5 gigawatts of daily production that will be purely generated by gas turbines [1]. this is at the behest of paid lobbyists for the energy sector and commissioners who, according to open records, have received upwards of six figures from the energy company that is granted a monopoly over our energy here [2]

this is after a strong push for clean energy options like a nuclear plant, solar, and wind by, well everyone, even rural communities who don't want the ambient pollution of those gas plants. but given this 'demand' for data centers, that transition to clean energy is all but abandoned. each of those turbines have an estimated lifetime use of 25-30 years [3] so we'll be emitting multiple times the amount of carbon we do today until at least the 2060s and all of it funded predominantly by taxpayers

if you're not a believer in what people now call 'communist' politics such as believing that anthropogenic climate change is real, public health initiatives save lives, and vaccines are effective then I suppose you'd find this all very good and silly

regardless, claiming anti-data center organizing comes from astro-turfing is exactly the opposite of what's happening. if you went to a single hearing or were engaged with your local community politics, you'd see as much

[1](https://www.canarymedia.com/articles/utilities/georgia-power...) [2](https://energyandpolicy.org/georgia-psc-incumbents-majority-...) [3](https://rmi.org/resources/you-might-be-paying-for-a-worthles...)

Re:Nashville uses eminent domain to block data center near zoo by userbinator on Wednesday August 05, 2026 @11:07PM (#49191928)
There is basically zero truth about the water use propaganda. Liquid cooling is closed-cycle, just like in a car.
Re:Nashville uses eminent domain to block data center near zoo by wlesieutre on Wednesday August 05, 2026 @11:22PM (#49192037)
Having a closed coolant loop and using evaporative cooling which expends water aren't mutually exclusive. It's possible for a datacenter to manage heat rejection by blowing air over a radiator like a car does, but it's much easier and cheaper to cool by evaporating water.

This can be set up using a closed coolant loop that takes heat out of the servers, then cools back down the coolant by exchanging that heat into a second separate coolant stream. That way you don't need to care as much about the purity of the water you're drawing and evaporating for evaporative cooling, only the first sealed loop gets pumped though your server racks.

This is the type of setup they're talking about with the much discussed xAI datacenter in Memphis, where xAI pinky swears they are definitely going to resume construction on their wastewater treatment plant [1] and use that for cooling instead. It definitely is designed to consume water and evaporate it, not a closed system like a car radiator that puts its waste heat into ≠the air with no evaporation.

[1] https://wreg.com/news/local/xai-to-resume-construction-on-wa...

Re:Nashville uses eminent domain to block data center near zoo by bri3d on Wednesday August 05, 2026 @11:13PM (#49191976)
A sizable percentage of datacenters use open loop water spray towers, but the alternative, forced air exchange (ie add more giant fans) uses more electricity. It’s fairly complex to quantify which is “better” or “worse” but there exist data centers that evaporate a ton of water and send it elsewhere. (for what it’s worth I agree most of the anti datacenter hype is overblown and driven by specific poorly designed gas turbine powered installations).
Re:Nashville uses eminent domain to block data center near zoo by magicalist on Wednesday August 05, 2026 @11:31PM (#49192099)
> driven by specific poorly designed gas turbine powered installations

*increasingly nonspecific. See [1] for example

[1] https://floodlightnews.org/ai-data-centers-texas-pollution-l...

Re:Nashville uses eminent domain to block data center near zoo by nullpoint420 on Wednesday August 05, 2026 @11:10PM (#49191947)
I thought this too. Apparently there’s open cooling systems as well that are more efficient
Re:Nashville uses eminent domain to block data center near zoo by thedougd on Wednesday August 05, 2026 @11:15PM (#49191990)
Yes. Evaporative cooling towers. I suppose in those cases nearly all the water used goes to atmosphere.
Re:Nashville uses eminent domain to block data center near zoo by userbinator on Thursday August 06, 2026 @12:11AM (#49192327)
...which then comes down again as rain, and in those areas where it's dry enough that evaporative cooling works, the increased humidity might actually be a good thing.
Re:Nashville uses eminent domain to block data center near zoo by altcognito on Thursday August 06, 2026 @12:17AM (#49192363)
In areas it's dry enough it is just leaving that watershed. It will be carried hundreds and thousands of miles away.
Re:Nashville uses eminent domain to block data center near zoo by userbinator on Thursday August 06, 2026 @12:40AM (#49192523)
Decades ago, there was a plan to equalise the water supply throughout the country: https://en.wikipedia.org/wiki/North_American_Water_and_Power...

Now China is beating us: https://en.wikipedia.org/wiki/South–North_Water_Transfer_Pro...

Re:Nashville uses eminent domain to block data center near zoo by altcognito on Thursday August 06, 2026 @01:14AM (#49192744)
Oh good, I'm glad China is beating us in the path to stupidity. These types of projects are the dumbest things we ever did here. Classic!

Nothing dumber than reallocating resources thouands of miles away from where they should be.

Re:Nashville uses eminent domain to block data center near zoo by userbinator on Sunday August 09, 2026 @05:24AM (#49229824)
You seriously think that it's a good thing to have absolute drought in some areas, while others are experiencing intense flooding?
Re:Nashville uses eminent domain to block data center near zoo by uluyol on Wednesday August 05, 2026 @11:14PM (#49191979)
The water use comes from evaporative cooling, not liquid cooling.

Liquid cooling pulls heat away from the chips. Evaporative cooling takes it out of the building.

There are alternatives, but evaporative cooling is very energy efficient.

Re:Nashville uses eminent domain to block data center near zoo by isuckatcoding on Wednesday August 05, 2026 @11:12PM (#49191965)
Is this actually true?

Aren’t there real instances of metas data centers causing havoc for nearby residents? Light/boise pollution, contaminated water are real things

Re:Nashville uses eminent domain to block data center near zoo by CivBase on Wednesday August 05, 2026 @11:12PM (#49191968)
I don't understand the water usage fears. I'm much more concerned with electricity usage.
Re:Nashville uses eminent domain to block data center near zoo by hatthew on Wednesday August 05, 2026 @11:07PM (#49191925)
Nonsensical issues go viral all the time without any conspiracy behind them
Re:Nashville uses eminent domain to block data center near zoo by sophacles on Wednesday August 05, 2026 @11:17PM (#49192007)
Perhaps, just maybe, all the price hikes in electricity, city provided subsidies without any public meetings, and shady dealings (NDAs, encouraging city officials to arrest people commenting against the dcs, and so on) make people wary?

Maybe they remember all the promises during the 90s fiber glut that cost them billions in taxpayer funds and only resulted in thousands and thousands of miles of fiber still unused (and often even lost and forgotten!) to this day, and don't want a repeat?

Maybe they aren't the braindead zombies you propose and are in fact just regular humans not stupid enough to be utterly sucked into the bubble religion so many AI fanatics are babbling in tongues about?

Maybe they look at things like Flock and palantir and other overt fascism and want to stop the evil. Some people aren't masochist freaks and don't want to be forced to participate in the sick little fetish all the AI sycophants try to abuse them with. Could it be that?

Re:Nashville uses eminent domain to block data center near zoo by bulbar on Thursday August 06, 2026 @12:32AM (#49192471)
> water usage despite being less than golf courses, etc

This sounds like a pretty good argument against golf courses. Not sure why you think this comparison put the water consumption of DCs into perspective, to me it just puts the water consumption of golf courses into perspective.

Re:Nashville uses eminent domain to block data center near zoo by culi on Thursday August 06, 2026 @02:15AM (#49193097)
It's also wrong. The industry is pushing this PR talking point really hard and not enough people are pushing back.

Per acre, data centers absolutely use way more water. But even then its apples to oranges. Golf courses use non-potable/recycled/grey water while data centers require really pure water (drinking water). The demand is also extremely concentrated in one spot instead of being disbursed. And, at least in agricultural land, 30-40% of the water used returns to the water table. With evaporative cooling, all of that water goes into the atmosphere.

Re:Nashville uses eminent domain to block data center near zoo by kortilla on Tuesday August 11, 2026 @01:34AM (#49253761)
Per acre is a meaningless statistic when your concern is water usage and its impact on your water supply.
Re:Nashville uses eminent domain to block data center near zoo by snowe2010 on Thursday August 06, 2026 @12:44AM (#49192547)
Please do provide your sources on the golf course stat you quoted.
Re:Nashville uses eminent domain to block data center near zoo by culi on Thursday August 06, 2026 @02:08AM (#49193056)
Conversely, the pro-data center camp seems so deeply misled about water usage. 90% of current existing data centers are indeed open loop and use evaporative cooling which use SIGNIFICANTLY more water per acre than even farmland or golf courses. Unlike residential use, where 80% of the water is reclaimed, open loop data centers allow almost all the water to evaporate. And unlike agricultural use which is dispersed over a wide area, data centers draw water from a single pipe, usually drawing from municipal sources. Golf courses usually use recycled, grey, or non-potable water while data centers need really pure water

The water grievances are absolutely valid and so many folks here seem to have drunk the industry koolaid on it.

Closed loop systems aren't exactly green either. That water has to be pumped with anti-corrosives, anti-fungals, non-stick chemicals, etc. Eventually it turns into a toxic sludge that has to be bled about once a month. They also require significantly more electricity than open loop facilities.