Almost every component in a datacenter is upgradeable—in fact, the compute itself only has a lifespan of ~5 years—but the power requirements are basically locked-in. A 200MW data center will always be a 200MW data center, even though the flops it computes will increase.
The fact that we use this unit really nails the fact that AI is basically refining energy.
-- Michael Russel
Raw AC comes in, then gets stepped down, filtered, converted into DC rails, gated, timed, and pulsed. That’s already an industrial refinement process. The "crude" incoming power is shaped into the precise, stable forms that CPUs, GPUs, RAM, storage, and networking can actually use.
Then those stable voltages get flipped billions of times per second into ordered states, which become instructions, models, inferences, and other high-value "product."
It sure seems like series of processes for refining something.
A 200MW data center will always be a 200MW data center, even though the flops it computes will increase.
This here underscores how important TSMC's upcoming N2 node is. It only increases chip density by ~1.15x (very small relative to previous nodes advancements) but it uses 36% less energy at the same speed as N3 or 18% faster than N3 at the same energy. It's coming at the right time for AI chips used by consumers and energy starved data centers.N2 is shaping up to be TSMC's most important node since N7.
Is it?
N2, from an energy & perf improvement seems on par with any generation node update.
N2:N3 N3:N5 N5:N7
Power ~30% ~30% ~30%
Perf ~15% ~15% ~15%
https://www.tomshardware.com/news/tsmc-reveals-2nm-fabricati...Both AMD and NVIDIA are using N4.
Refining is taking a lower quality energy source and turning it into a higher quality one.
What you could argue is that it adds value to bits. But the bits themselves, their state is what matters, not the energy that transports them.
A power plant "mines" electron, which the data center then refines into words. or whatever. The point is that energy is the raw material that flows into data centers.
A local to me ~40W datacenter used to be in really high demand, and despite having excess rack space, had no excess power. It was crazy.
But it very quickly became the best place in town for carrier interconnection. So every carrier wanted in.
Even when bigger local DC's went in, a lot of what they were doing was just landing virtual cross connects to the tiny one, because thats where everyone was.
I still have an Edison bulb that consumes more power.
Why is that? To do with the incoming power feed or something else?
Exactly. When I saw the headline I assumed it would contain some sort of ambitious green energy build-out, or at least a commitment to acquire X% of the energy from renewable sources. That's the only reason I can think to brag about energy consumption
Imagine Ford announced “a strategic partnership with FedEx to deploy 10 giga-gallons of ICE vehicles”
Whether they use all those gigawatts and what they use them for would be considered optional and variable from time to time.
https://subscriber.politicopro.com/article/eenews/2025/09/22...
This is probably naïve. Prices skyrocketed in Germany for similar reasons before AI data centers were a thing.
I would also like to know. It's a LOT of power to supply. Nvidia does have a ~3% stake in Applied Digital, a bitcoin miner that pivoted to AI (also a "Preferred NVIDIA Cloud Partner") with facilities in North Dakota. So they might be involved for a fraction of those 10GW, but it seems like it will be a small fraction even with all the planned expansions.
https://www.investopedia.com/applied-digital-stock-soars-on-...
https://ir.applieddigital.com/news-events/press-releases/det...
This means loads with pretty abysmal power factors (like induction motors) actually end up costing the business more money than if they ran them at home (assuming the home had a sufficient supply of power).
Further, they get these lower rates in exchange for being deprioritised -- in grid instability (e.g. an ongoing frequency decline because demand outstrips available supply), they will be the first consumers to be disconnected from the grid. Rolling blackouts affecting residential consumers are the last resort.
There are two sides to this coin.
Note that I am in no way siding with this whole AI electricity consumption disaster. I can't wait for this bubble to pop so we can get back to normality. 10GW is a third of the entire daily peak demand of my country (the United Kingdom). It's ridiculous.
Edit: Practical Engineering (YouTube channel) has a pretty decent video on the subject. https://www.youtube.com/watch?v=ZwkNTwWJP5k
Although wholesale electricity prices show double-digit average year-on-year swings, their true long-run growth is closer to ~6% per year, slightly above wages at ~4% during the same period.
So power has become somewhat less affordable, but still remains a small share of household income. In other words, wage growth has absorbed much of the real impact, and power prices are still a fraction of household income.
You can make it sound shocking with statements like “In 1999, a household’s wholesale power cost was about $150 a year, in 2022, that same household would be charged more than $1,000, even as wages only grew 2.5x”, but the real impact (on average, obviously there are outliers and low income households are disproportionately impacted in areas where gov doesn’t subsidise) isn’t major.
https://www.aer.gov.au/industry/registers/charts/annual-volu...
Especially since these sorts of corporations can get tax breaks or har means of getting regulators to allow spreading the cost. Residential shouldn’t see any increase due to data centers, but they do, and will, supplement them while seeing minimal changes to infrastructure
When people are being told to minimize air conditioning but then these big datacenters are made and aren’t told “reduce your consumption” then it doesn’t matter how big or small the electric bill is, it’s supplementing a multi billion dollar corporation’s toy
I'm sure none of the other outgoings for a household saw similar increases. /s
The bulk of cost increases come from the transition to renewable energy. You can check your local utility and see.
It’s very easy to make a huge customer like a data center directly pay the cost needed to serve them from the grid.
Generation of electricity is more complicated, the data centers pulling cheap power from Colombia river hydro are starting to compete with residential users.
Generation is a tiny fraction of electricity charges though.
- 0,1952 per kWh for uniform price.
- 0,1635 / 0,2081 for day/nigh pricing
- 0,1232 /... / 0,6468 for variable pricing
https://particulier.edf.fr/content/dam/2-Actifs/Documents/Of...
You have a very bad deal if you pay 0.97€ per kWh.
If the US petro-regime wasn't fighting against cheap energy sources this would be a rounding error in the country's solar deployment.
China deployed 277GW of solar in 2024 and is accelerating, having deployed 212GW in the first half of 2025. 10 GW could be a pebble in the road, but instead it will be a boulder.
Voters should be livid that their power bills are going up instead of plummeting.
In mid latitudes, 1 GW of solar power produces around 5.5 GWh/day. So the "real" equivalent is a 0.23 GW gas or nuclear plant (even lower when accounting for storage losses).
But "China installed 63 GW-equivalent" of solar power is a bit less interesting, so we go for the fake figures ;-)
(Things might be different if you had some sort of SiC process that let you run a GPU at 500C core temperatures, then you could start thinking of meaningful uses for that, but you'd still need a river or sea for the cool side just as you do for nuclear plants)
That's half what I pay in Italy, I'm sure the richest country in the world will do fine.
You underestimate how addicted the US is to cheap energy and how wasteful it is at the same time.
Remember how your lifestyle always expands to fill the available resources no matter how good you have it? Well if tomorrow they'd have to pay EU prices, the country would have a war.
When you lived your entire life not caring about the energy bill or about saving energy, it's crippling to suddenly have scale back and be frugal even if that price would still be less than what other countries pay.
Framing it in GW is just giving them what they want, even if it makes no sense.
I'm not even anti-datacenter (wouldn't be here if I were), I just think there needs to be serious rebalancing of these costs because this increase in US residential electric prices in just five years (from 13¢ to 19¢, a ridiculous 46% increase) is neither fair nor sustainable.
So where is this 10GW electric supply going to come from and who is going to pay for it?
Source: https://fred.stlouisfed.org/series/APU000072610
EDIT:
To everyone arguing this is how DCs are normally sized: yes, but normally it's not the company providing the compute for the DC owner that is giving these numbers. nVidia doesn't sell empty datacenters with power distribution networks, cooling, and little else; nVidia sells the GPUs that will stock that DC. This isn't a typical PR netnewswire bulletin "OpenAI announces new 10GW datacenter", this is "nvidia is providing xx compute for OpenAI". Anyway, all this is a segue from the question of power supply, consumption, grid expansion/stability, and who is paying for all that.