Re:Panama Canal drought forces Maersk to start using land br... by geraldhh on Sunday January 14, 2024 @04:18AM (#38988811)
can someone more caffeinated than me, do the math here plz? i suspect there will be some lengthy trains involved.

<containers on average ship> * <lenght of railway carriage>

Re:Panama Canal drought forces Maersk to start using land br... by schiffern on Sunday January 14, 2024 @04:38AM (#38988937)
The Japan Times article says they plan to initially carry 300,000 TEU per year in both directions, via three round-trip trains per day (~=137 TEU per train). That works out to 11.5 New Panamax ships per year in each direction.

It also says they eventually plan to increase the capacity to 1.4 million TEU per year, equivalent to 54 New Panamax container ships in each direction.

Re:Panama Canal drought forces Maersk to start using land br... by geraldhh on Sunday January 14, 2024 @04:45AM (#38988961)
> via three round-trip trains per day (~=137 TEU per train)

given 2-10k TEU per ship, that does not sound nearly enough

Re:Panama Canal drought forces Maersk to start using land br... by ImPostingOnHN on Sunday January 14, 2024 @11:49AM (#38991991)
The math in the post you responded to checks out:

> That works out to 11.5 New Panamax ships per year in each direction

It seems like that it's enough, for 11.5 new panamax ships per year in each direction.

Re:Panama Canal drought forces Maersk to start using land br... by zeristor on Sunday January 14, 2024 @05:35AM (#38989226)
300k TEU a DAY would sound about right.
Re:Panama Canal drought forces Maersk to start using land br... by schiffern on Sunday January 14, 2024 @03:49PM (#38994314)
That's roughly 10x the traffic through the canal.[0]

The project goal of 1.4 million containers is 16% as much traffic as the canal. For comparison the existing Panama Canal railway has a capacity of 2 million TEU/year.

[0] (yes these are annual not monthly) https://www.ceicdata.com/en/indicator/panama/container-port-...

Re:Panama Canal drought forces Maersk to start using land br... by jrockway on Sunday January 14, 2024 @04:21AM (#38988843)
New Panamax ships can carry 13,000 twenty-foot-equivalent units. 13,000 * 20 ft = 260,000 ft = 49 miles. (You can stack containers on top of each other, so 25 miles. There also needs to be space between the containers on a train for the couplers, etc., though, so a real train would probably be longer than this.)

I am not sure how much the railway helps. There is already a railway across North America and it's still cheaper to go via Panama at this scale.

Re:Panama Canal drought forces Maersk to start using land br... by pseudostem on Sunday January 14, 2024 @05:17AM (#38989141)
Not sure if GP meant the math for just the trains bit. There is an increase in handling, and everytime the container changes hands, it's going to cost (assuming dearly). First the ship has to berth (cost), unloaded using QC gantry (cost) onto an ITV (cost) where it gets stacked using a stacker/gantry (cost) in a yard (cost) and then unstacked using a stacker/gantry (cost) onto a truck/ITV (cost) which takes it to a stacker/gantry (cost) which then stacks it onto a train (cost). This is then probably going to be reversed on the other side of the train destination assuming it's a port.
Re:Panama Canal drought forces Maersk to start using land br... by berkes on Sunday January 14, 2024 @05:27AM (#38989189)
The handling is an opportunity too, though. Now you can merge cargo from several ships, and split the cargo from one ship to several others.

Rarely do all containers go in one large batch from just one port to another single one.

Re:Panama Canal drought forces Maersk to start using land br... by jaystraw on Wednesday January 17, 2024 @09:36AM (#39028251)
i don't disagree, but were it that advantageous, there would be islands in the pacific where this happened
Re:Panama Canal drought forces Maersk to start using land br... by readthenotes1 on Sunday January 14, 2024 @04:55AM (#38989015)
Sounds like what they need is a conveyor belt
Re:Panama Canal drought forces Maersk to start using land br... by savoytruffle on Sunday January 14, 2024 @08:35AM (#38990219)
Some sort of a sideways space-elevator.
Re:Panama Canal drought forces Maersk to start using land br... by m4rtink on Sunday January 14, 2024 @09:21AM (#38990635)
Space fountain working with containers! :)
Re:Panama Canal drought forces Maersk to start using land br... by nunesvn on Sunday January 14, 2024 @08:33AM (#38990214)
why not a slingshot?
Re:Panama Canal drought forces Maersk to start using land br... by geraldhh on Sunday January 14, 2024 @05:07AM (#38989086)
terrific idea
Re:Panama Canal drought forces Maersk to start using land br... by akie on Sunday January 14, 2024 @05:39AM (#38989244)
Pretty fragile though.
Re:Panama Canal drought forces Maersk to start using land br... by geraldhh on Sunday January 14, 2024 @05:53AM (#38989319)
idk, could be addressed with segmentation and redundancy thou
Re:Panama Canal drought forces Maersk to start using land br... by zo1 on Sunday January 14, 2024 @10:38AM (#38991355)
Not if you put it on some sort of rail system, and make sure each unit that's on the system has the capability to push/stop itself on this rail system.
Re:Panama Canal drought forces Maersk to start using land br... by yreg on Sunday January 14, 2024 @04:25AM (#38988862)
24000 TEU ships don't fit into Panama canal.
Re:Panama Canal drought forces Maersk to start using land br... by benj111 on Sunday January 14, 2024 @05:30AM (#38989206)
Well they didn't mention 24000 teu.

Or are you saying they wouldn't be limited by panamax, so could theoretically lower costs on the shipping portion?

Re:Panama Canal drought forces Maersk to start using land br... by yreg on Sunday January 14, 2024 @06:44AM (#38989574)
They did calculate with 24000 TEUs, edited the comment afterwards. All good.
Re:Panama Canal drought forces Maersk to start using land br... by jrockway on Sunday January 14, 2024 @08:24PM (#38996324)
Yup, I did. I had that thought like, wait, can that big a ship fit through the Panama canal? The answer is... no ;)
Re:Panama Canal drought forces Maersk to start using land br... by Ringz on Sunday January 14, 2024 @04:51AM (#38988996)
For 1000 containers of the 40 foot class (which are more widespread than the standard 20 foot class, the train would have to be about 14.5 km long. If you take 1/2 m distance between the wagons.
Re:Panama Canal drought forces Maersk to start using land br... by ithkuil on Sunday January 14, 2024 @05:49AM (#38989297)
For reference:

" The Australian BHP Iron Ore is the longest train ever recorded in history at approximately 4.6 miles (7.353 km). In the Pilbara region of Western Australia, BHP owns and runs the Mount Newman railway. This is a private rail network designed to transport iron ore "

Re:Panama Canal drought forces Maersk to start using land br... by pasttense01 on Sunday January 14, 2024 @10:47AM (#38991451)
In the U.S. they often double stack containers--so that would be half the distance if they could:

"Invented in the United States in 1984, it is now being used for nearly seventy percent of United States intermodal shipments. Using double stack technology, a freight train of a given length can carry roughly twice as many containers, sharply reducing transport costs per container."

https://en.wikipedia.org/wiki/Double-stack_rail_transport

But generally going around the southern tip of South America could well be cheaper--although it may take longer.

Re:Panama Canal drought forces Maersk to start using land br... by Ringz on Sunday January 14, 2024 @01:18PM (#38992852)
You're right about that. However, this probably only works with diesel-powered locomotives and not with electrified railway systems.
Re:Panama Canal drought forces Maersk to start using land br... by EasyMark on Sunday January 14, 2024 @09:44PM (#38996900)
why wouldn't it apply to electrified railways? I mean it's all energy in the end. I'm sure they make electric motors powerful enough and you can pull your own batteries as part of the load.
Re:Panama Canal drought forces Maersk to start using land br... by Ringz on Monday January 15, 2024 @05:11AM (#38999143)
The clearance above the train. You have to rebuild every passenger transportation train to work with higher clearance or you build a dedicated railway system only for transportation. Neither financial nor ecologically sustainable.
Re:Panama Canal drought forces Maersk to start using land br... by EasyMark on Sunday January 14, 2024 @09:43PM (#38996893)
I mean it would seem to be an innovation but "invention" seems like a stretch as there is nothing new about stacking stuff. I mean it should be a staightforward idea/extrapolation for any "good" mechanical engineer familiar with railroads and trains?
Re:Panama Canal drought forces Maersk to start using land br... by EasyMark on Sunday January 14, 2024 @09:41PM (#38996879)
I wander if there are any publically available topographical maps along the roughly estimated region available to find an optimal path, even if it's a "as the crow flies" estimate.
Re:Panama Canal drought forces Maersk to start using land br... by yreg on Sunday January 14, 2024 @04:23AM (#38988855)
Panamax ships can carry up to 5000 ISO containers, while Neopanamax (the ones using the new set of locks) carry up to 14000. No idea about LPG tankers, etc.
Re:Panama Canal drought forces Maersk to start using land br... by Ringz on Sunday January 14, 2024 @04:38AM (#38988935)
Only if all containers are empty. It is usually less than 14,000 if you assume the average weight of four and a half tons per container.
Re:Panama Canal drought forces Maersk to start using land br... by EasyMark on Sunday January 14, 2024 @09:45PM (#38996903)
couldn't you just use more trains rather than longer trains? I'm sure it wouldn't cost as much as developing entirely new types of trains.