Re:Panama Canal drought forces Maersk to start using land br...
by Ringz on Sunday January 14, 2024 @04:51AM
(#38988996)
For 1000 containers of the 40 foot class (which are more widespread than the standard 20 foot class, the train would have to be about 14.5 km long. If you take 1/2 m distance between the wagons.
[ Parent
| on HN ]
Re:Panama Canal drought forces Maersk to start using land br...
by ithkuil on Sunday January 14, 2024 @05:49AM
(#38989297)
For reference:
" The Australian BHP Iron Ore is the longest train ever recorded in history at approximately 4.6 miles (7.353 km). In the Pilbara region of Western Australia, BHP owns and runs the Mount Newman railway. This is a private rail network designed to transport iron ore "
Re:Panama Canal drought forces Maersk to start using land br...
by pasttense01 on Sunday January 14, 2024 @10:47AM
(#38991451)
In the U.S. they often double stack containers--so that would be half the distance if they could:
"Invented in the United States in 1984, it is now being used for nearly seventy percent of United States intermodal shipments. Using double stack technology, a freight train of a given length can carry roughly twice as many containers, sharply reducing transport costs per container."
https://en.wikipedia.org/wiki/Double-stack_rail_transport
But generally going around the southern tip of South America could well be cheaper--although it may take longer.
Re:Panama Canal drought forces Maersk to start using land br...
by Ringz on Sunday January 14, 2024 @01:18PM
(#38992852)
You're right about that. However, this probably only works with diesel-powered locomotives and not with electrified railway systems.
Re:Panama Canal drought forces Maersk to start using land br...
by EasyMark on Sunday January 14, 2024 @09:44PM
(#38996900)
why wouldn't it apply to electrified railways? I mean it's all energy in the end. I'm sure they make electric motors powerful enough and you can pull your own batteries as part of the load.
Re:Panama Canal drought forces Maersk to start using land br...
by Ringz on Monday January 15, 2024 @05:11AM
(#38999143)
The clearance above the train. You have to rebuild every passenger transportation train to work with higher clearance or you build a dedicated railway system only for transportation. Neither financial nor ecologically sustainable.
Re:Panama Canal drought forces Maersk to start using land br...
by EasyMark on Sunday January 14, 2024 @09:43PM
(#38996893)
I mean it would seem to be an innovation but "invention" seems like a stretch as there is nothing new about stacking stuff. I mean it should be a staightforward idea/extrapolation for any "good" mechanical engineer familiar with railroads and trains?
Re:Panama Canal drought forces Maersk to start using land br...
by EasyMark on Sunday January 14, 2024 @09:41PM
(#38996879)
I wander if there are any publically available topographical maps along the roughly estimated region available to find an optimal path, even if it's a "as the crow flies" estimate.