News for hackers. Stuff that matters.
Re:The B-52 was designed in a hotel room over one weekend by runjake on Wednesday September 14, 2022 @09:22AM (#32836806)
The first prototype of the B-52 may have been designed in a weekend.

The B-52 of today was iteratively designed over decades and the current H models are entirely different planes than earlier models (although structurally very close to the G model).

Another HN commenter mentioned GPS being designed over a holiday. But we spent years and years in the military debugging GPS and making it functional.

Claiming that something was designed in a day is good clickbait, but it completely discounts the years of blood, sweat, and tears it took to get to the product that people have in their head.

Re:The B-52 was designed in a hotel room over one weekend by daveslash on Wednesday September 14, 2022 @09:56AM (#32837253)
Came here to say something similar. My comment being "The word 'designed' is being used very generously here. I would suggest 'conceptualized' as a better word"
Re:The B-52 was designed in a hotel room over one weekend by PragmaticPulp on Wednesday September 14, 2022 @10:31AM (#32837760)
Conceptualized is a perfect word.

The claim that it was designed in a weekend is like those “overnight success” stories that ignore the decade of work that someone put in to get to that point.

Re:The B-52 was designed in a hotel room over one weekend by lelandfe on Wednesday September 14, 2022 @11:12AM (#32838367)
This was genuinely an overnight success, though. They got approval on the strength of this design. And the broad strokes design of the aircraft seemingly stayed intact through the subsequent processes.

This entire comment chain is bewildering, we're attacking strawmen. Did anyone read this article and leave assuming no further work was done after approval? Was this HN comment chain enlightening to anyone? Who are we writing this for?

Re:The B-52 was designed in a hotel room over one weekend by froidpink on Wednesday September 14, 2022 @11:25AM (#32838520)
It was a strong conceptual design, yes.

For my aerospace engineering undergrad we also had to create a conceptual design for a new aircraft. And of course, as university projects go, we basically did it in five days. But I won't tell you how many iterations we would've had to go through until we had an optimum configuration ready to be sent to detail design

The headline makes it look like their design was a definite one. Then you actually read the article and it says it took another four years before the first one would fly. Which is actually to me the more impressive part of the story, considering the amount of time it takes aircraft manufacturers to go from concept to production these days (e.g. the A380 was first conceptualised in the 1980s and its first flight was in 2005)

Re:The B-52 was designed in a hotel room over one weekend by fuzzfactor on Wednesday September 14, 2022 @11:01PM (#32846456)
Exactly.

Ask yourself, how long does this normally take to go from A to B?

One day you've got top engineers with a contemporary concept, but the military says nah we've got to have something way better.

So they really go to work on it until they can confidently deliver a 33-page futuristic well-engineered proposal with a prototype scale model and then the military says yes right away.

What's normal here, weeks, months, even years?

That's what's impressive in 48 hours, nobody could expect a complete set of blueprints, they had to first determine if prints would even be realistically possible.

You know their slide rules were flying like few could do.

With engineers like this why would you use anyone else?

Re:The B-52 was designed in a hotel room over one weekend by Someone on Wednesday September 14, 2022 @03:38PM (#32842261)
That doesn’t look abnormal for the time period. The first B-29 Super Fortress, for example, flew in September 1942, with the design started in 1938 (https://en.wikipedia.org/wiki/Boeing_B-29_Superfortress)

Also, Nazi Germany had a few designs that took way shorter than that to go from idea to first flight. An extreme example is https://en.wikipedia.org/wiki/Heinkel_He_162#Prototypes:

“The He 162 V1 first prototype flew within an astoundingly short period of time: the design was chosen on 25 September 1944 and first flew on 6 December, less than 90 days later”

They did have to cut ‘some’ corners to get there, though. That Wikipedia page mentions that it used a highly acidic glue that would disintegrate the wooden parts it was intended to be fastening, that that caused problems on the first flight and a deadly crash on the second, but that it wasn’t considered important enough to hold up the production schedule for even a day.

Re:The B-52 was designed in a hotel room over one weekend by edgyquant on Wednesday September 14, 2022 @12:01PM (#32839078)
Okay and the point here is that this wasn’t a college project thrown together in 5 days this was a military grade design outputted over a weekend.
Re:The B-52 was designed in a hotel room over one weekend by kbenson on Wednesday September 14, 2022 @12:52PM (#32839860)
I'm pretty sure the point of this thread is that it wasn't a 'military grade' design over a weekend, and as GP notes took over four years. It's sort of like saying Microsoft Excel was designed over a weekend.

The problem people have is that designed is a very flexible word that can mean a great many different things, and because of that it's being used here in a way that means something akin to conceptualized, but also used in the title in this way specifically because it will suggest to people that all the design work was finalized in that period.

That's click-baity in that it plays with people expectations, and not in a way they generally enjoy, so they're annoyed. If you don't like click-bait, the appropriate thing to do is to complain or abstain, otherwise you're just reinforcing their decision to communicate in that way.

Re:The B-52 was designed in a hotel room over one weekend by FiatLuxDave on Wednesday September 14, 2022 @03:32PM (#32842160)
I'm actually finding this comment chain useful, because I see it as showing that we need better language to describe the stages of design. Or maybe that nomenclature does already exist but people aren't using it? In R&D we will often describe the https://en.wikipedia.org/wiki/Technology_readiness_level of a new technology, and this is much more useful that just saying "it's in development". But I'm not aware of a similar shorthand for the design phase. There is this muddy space between concept and fully specified design which would be awesome to be able to talk about in more concrete terms.

For example, let's look at the concept/design of a helicopter:

DL1 (idea phase): a flying machine that can go straight up and hover

DL2 (concept with basic working principle): a vehicle with a rotor which acts like wings moving in a circle to move air down and by reaction push the vehicle up

DL3 (concept with important details attached): as DL2 but with a tail rotor to allow for axial control and differential tilting of the airfoils to allow forward thrust

DL4 (concept with specifications that drive requirements for other specs): as DL3 with rotor lengths of 3.3 m and a NACA 0018 cross section made of 6061-T6 aluminum

DL5 (concept with full specs): as DL4 but also etc.

Is anyone aware of better nomenclature like this for the concept/design phase? It would help for more important things than this discussion alone. Like when discussing which is more important, idea or execution: so which level idea are we talking about? Also, the root cause of a lot of software problems is in the spec. It would be nice to be able to go back and say, "this spec is only spec level 3, can I please have a spec level 5"?

This discussion is happening because "they designed it over a weekend" is really vague. It would be nice to have a quick way to make it not-vague.

Re:The B-52 was designed in a hotel room over one weekend by gfdsgfdsf on Wednesday September 14, 2022 @11:33AM (#32838657)
you just summed up 100% of internet commenting
Re:The B-52 was designed in a hotel room over one weekend by kingkawn on Wednesday September 14, 2022 @11:55AM (#32838971)
Thank you ffs
Re:The B-52 was designed in a hotel room over one weekend by hajile on Wednesday September 14, 2022 @11:33AM (#32838647)
The current F-22 looks and acts nothing like the YF-22 that won the competition (despite the YF-23 being much better, but that's another story).

The fact that the B-52 production was not just similar to the prototype, but similar to a complete mockup is a testament to the accuracy of their initial vision. The fact that the US continues to use that design after so many decades is even more amazing.

Re:The B-52 was designed in a hotel room over one weekend by nradov on Wednesday September 14, 2022 @12:18PM (#32839334)
The YF-23 was better in some ways, worse in others. Compared to the YF-22 it was faster, longer ranged, and (probably) more stealthy. But it had a smaller weapons bay and was less maneuverable. Both aircraft met the ATF program technical requirements. The final selection was based primarily on the Air Force having greater confidence in Lockheed over Northrop in being able to run the program on schedule and budget. The notional production F-23 would have been quite different from the prototype.

https://youtu.be/_MUK241uZHM

Re:The B-52 was designed in a hotel room over one weekend by Maursault on Wednesday September 14, 2022 @02:36PM (#32841350)
> The final selection was based primarily on the Air Force having greater confidence in Lockheed over Northrop in being able to run the program on schedule and budget

Unexpected. The Lockheed YF-23[1] looks like it would fall apart if you breathed on it wrong, while the Northrop YF-23 is such a slick design it looks like it's moving while standing still.

[1] https://upload.wikimedia.org/wikipedia/commons/f/f1/YF-22.jp...

[2] http://www.diseno-art.com/images_10/Northrop-YF-23-8.jpg

Re:The B-52 was designed in a hotel room over one weekend by nradov on Thursday September 15, 2022 @12:50AM (#32847180)
Well the Lockheed YF-22 prototypes didn't fall apart through an extensive flight test program including multiple supersonic flights and weapon launches.
Re:The B-52 was designed in a hotel room over one weekend by hajile on Wednesday September 14, 2022 @12:49PM (#32839818)
I thought the YF-23 had a larger weapon bay, but there was some debate at the time about the design of the delivery mechanism. On the flip side, having one, large bay allows for weapons configurations that aren't possible with multiple, shallow bays.

Maneuverability in a stealth plane is not of much use. Just like the F-35, the goal of the YF-23 was to use its vastly superior stealth capabilities take out the enemies before a dogfight happened. Given that drones can take G's that will turn a human's brain to mush, this is a much more sensible strategy in modern combat and renders the F-22 vectored thrusters as mostly an expensive and useless feature that sacrifices the much more important stealth of the YF-23's hidden engines.

I believe the claims of being worried about timetables were just making up excuses to choose a worse plane. The F-22 was 100% redesigned anyway (making a "competition" nothing but a formality). It was delivered years late and WAY over budget.

Re:The B-52 was designed in a hotel room over one weekend by digdugdirk on Wednesday September 14, 2022 @11:42AM (#32838759)
Any recommendations for an overview resource that better explains your statements?

Both about the YF-23 design being better, and about why the B-52 design is so good.

Re:The B-52 was designed in a hotel room over one weekend by hajile on Wednesday September 14, 2022 @12:40PM (#32839671)
YF-23 had faster supercruise, a much bigger range, and had a way larger internal ordinance bay (external ordinance kills stealth). They intentionally skipped the sexy vectored thrusters for B-2 style inset exhausts which make infrared signature much smaller (especially to ground-based attackers). This meant the YF-23 could have delivered more ordinance faster and farther while having higher rates of mission success due to better stealth.

F-22 won the competition on two and a half points.

First and foremost, the YF-23 was going to be built in 10-11 states while the YF-22 was going to be built in almost 30 states, so something like 40 senators had their state's financial interests at stake with the jobs this would bring in (though nobody involved would ever openly admit this was one of the big reasons). Of course, spreading stuff out increases all kinds of costs and with so many small places, once the main run of planes was done, all these sub-contractors moved on too. As a result, the US can't get all the F-22 parts they need and the F-22 is going to be scrapped way before what would otherwise be necessary.

Second, is that the F-22 had vectored thrusters, so was theoretically more maneuverable. This is somewhat debated because making a YF-23 variant with vectored thrusters was possible and even without it was more than capable of turning a pilot's brains to mush (by far the biggest limiting factor for any manned fighter). Ironically, the big selling point of the F-35 is to be so stealthy that you can kill targets before they can see you due to stealth without the need to dogfight which was the exact YF-23 strategy too (and of course, vectored thrust seems to be a needless and cost-adding addition to the F-22 as the strategy for them is also to engage at ranges where maneuvering isn't a critical task). In every other category of consideration, the YF-23 was far ahead of requirements while the YF-22 was barely satisfactory.

The half point is the stated delivery concerns. The Air Force claimed they were worried that the planes wouldn't be delivered because the B-2 was already behind schedule. As EVERY plane is ALWAYS delivered behind schedule, this is very dumb reasoning. While the YF-23 team had worked for years to make a ready-to-ship plane in the YF-23, the YF-22 was a cobbled-together mess to the point that the entire airframe was redesigned multiple times. As a result of this and that spread-out construction crew, the F-22 was way behind schedule and way overbudget.

Northrop Grumman allegedly asked about using YF-23 designs in a bid for the next-gen Japanese fighter project, so maybe there's hope for it yet (I'd note that the profile of the Russian SU-57 has a strikingly similar look).

EDIT: As to the B-52, the real issue is that making a new plane would give marginal benefits to the airframe while the retraining and costs would be large (not to mention the usual teething problems of a new design). This is similar to how they tried so many times to replace the m4. Better systems exist, but they weren't worth the upgrade (lots of people suspect that their new rifle will be too heavy for most soldiers too).

The most profitable upgrades to the B-52 are the internals and electronics and this has been done several times.

The second best upgrade is more modern and efficient engines, but this has been a very slow to happen. They've announced plans to do this, but I suspect it will be longer than they think. They are claiming reduced maintenance time and a 30% increase in efficiency. Not a bad upgrade, but also not that huge when you consider that's basically 0.5% for each year since it was first designed.

Re:The B-52 was designed in a hotel room over one weekend by abudabi123 on Wednesday September 14, 2022 @02:31PM (#32841275)
> While the YF-23 team had worked for years to make a ready-to-ship plane in the YF-23, the YF-22 was a cobbled-together mess to the point that the entire airframe was redesigned multiple times.

The YF-23 team had to turn in their specs in the competition and you wonder if the referee was partial to the YF-22 team and gave them opposition research. That was the feeling I got from interviews & documentary.

Re:The B-52 was designed in a hotel room over one weekend by coredog64 on Wednesday September 14, 2022 @01:38PM (#32840535)
Boeing already had experience and credibility with the USAF from the earlier B-47. In some respects, the B-52 is “the B-47 but bigger”. You can see it in the similar fighter canopy cockpit on the XB-52.
Re:The B-52 was designed in a hotel room over one weekend by tgv on Wednesday September 14, 2022 @10:31AM (#32837774)
Conceptualized, but also pondered upon, and considered worthy of further effort. A conceptualization can be done as fast as a single second, but it can take ages to weigh it against alternatives.
Re:The B-52 was designed in a hotel room over one weekend by lisper on Wednesday September 14, 2022 @10:57AM (#32838163)
You can apply the "conceptualization" criterion retroactively to any successful project. They all started as an idea that someone noodled around with for long enough to decide to pursue it further. You can draw the line where that initial noodling ended and serious work began pretty much anywhere you like.
Re:The B-52 was designed in a hotel room over one weekend by BolexNOLA on Wednesday September 14, 2022 @10:23AM (#32837654)
“I want all my music to fit in the palm of my hand.”

Steve Jobs created the iPod in just one day

Re:The B-52 was designed in a hotel room over one weekend by daveslash on Wednesday September 14, 2022 @10:35AM (#32837838)
Heh, exactly. Succinctly put. Here's a longer-winded version: I'm an R&D Software Engineer. In a workplace setting years ago we had a Software Architect who would advise management and the implementation engineers. Me and my team were really struggling with a difficult implementation problem relating to some federated identity stuff. Management told us to go to the architect. We explained our problems and he waved them off as "that's implementation stuff, I don't do that, but the solution is very easy. Just get server X to communicate whatever token you need to server Y". It was off putting. He also told our management that our problem was an "easy one", without offering any helpful insight.

It's like saying "Traveling to The Moon is easy. You simply need enough thrust to overcome Earth's gravity well. Simple!"

Re:The B-52 was designed in a hotel room over one weekend by gladiatr72 on Wednesday September 14, 2022 @11:25AM (#32838521)
Or perhaps more in-line with a favorite of mine:

The secret to mankind achieving unpowered flight is for someone to throw themselves at the ground and simply miss..

Re:The B-52 was designed in a hotel room over one weekend by BolexNOLA on Wednesday September 14, 2022 @10:56PM (#32846426)
Whelp guess it’s time to bust out the guide
Re:The B-52 was designed in a hotel room over one weekend by spaetzleesser on Wednesday September 14, 2022 @01:16PM (#32840213)
I always tell people that I could probably "architect" the infrastructure of my whole company (Fortune 500) in a few days if you ignored the little pesky implementation details.
Re:The B-52 was designed in a hotel room over one weekend by acidburnNSA on Wednesday September 14, 2022 @10:41AM (#32837930)
Meh, the Archos Jukebox was doing that well before Steve Jobs. Steve's genius concept was "I want all my music to fit in the palm of my hand, but with a way better UI than Archos Jukebox"

https://en.wikipedia.org/wiki/Archos_Jukebox_series

Re:The B-52 was designed in a hotel room over one weekend by JohnBooty on Wednesday September 14, 2022 @11:47AM (#32838848)
As an owner of an Archos Jukebox, the differences went way beyond the software interface.

The Archos was way larger and heavier than the iPod, and the build quality was abysmal. Mine essentially fell apart despite seeing only desktop use. Battery life was inferior as well. Headphone output was also much louder and cleaner on the iPod.

Literally everything about the iPod was better than literally everything about the Archos.

Re:The B-52 was designed in a hotel room over one weekend by aaronharnly on Wednesday September 14, 2022 @11:14AM (#32838397)
Yes, but the 1.8” drive in the iPod was a true differentiator. It was the difference between “in the palm of my hand” and “it is possible to hold it, but not easy.”
Re:The B-52 was designed in a hotel room over one weekend by Someone on Wednesday September 14, 2022 @11:28AM (#32838575)
The iPod also fitted easier in the typical hand (and, probably more important, in the typical pocket). Dimensions of that Archos: 3.1 in x 4.4 in x 1.2 in = 16.4 in³

Dimensions of the first iPod: 4.02 in x 2.43 in x 0.78 in = 7.62 in³. That’s less than half the volume.

(Weight-wise, the difference is smaller (10.2 vs 6.5 oz)

Re:The B-52 was designed in a hotel room over one weekend by BitwiseFool on Wednesday September 14, 2022 @11:46AM (#32838826)
I invite people to look at a photo of the thing: https://en.wikipedia.org/wiki/Archos_Jukebox_series#/media/F...

It looks so quintessentially late 90's, yet hideous at the same time.

Re:The B-52 was designed in a hotel room over one weekend by BolexNOLA on Wednesday September 14, 2022 @10:57PM (#32846439)
Jesus wow. That is…yeah you nailed it.
Re:The B-52 was designed in a hotel room over one weekend by monetus on Wednesday September 14, 2022 @10:56AM (#32838143)
I wonder how their ad spend compared to Apple's.
Re:The B-52 was designed in a hotel room over one weekend by MontyCarloHall on Wednesday September 14, 2022 @11:13AM (#32838382)
You jest, but the original iPod went from conceptualization to ship in an absurdly fast 10 months [0].

[0] https://appleinsider.com/articles/20/01/13/first-ipod-went-f...

Re:The B-52 was designed in a hotel room over one weekend by yabones on Wednesday September 14, 2022 @09:27AM (#32836869)
It's honestly a fantastic case for incremental improvements over time. There's practically no single part on a modern B-52 that's original to the 1960s since everything has been overhauled and modernized decade by decade. Every attempt to replace it has been (or will be) retired before its EOL.
Re:The B-52 was designed in a hotel room over one weekend by tablespoon on Wednesday September 14, 2022 @10:52AM (#32838074)
> Every attempt to replace it has been (or will be) retired before its EOL.

Though that's probably because it's design is basically "big, boxy, utilitarian sky truck," which is so flexible you can always find something to use it for. Everything else seems to make tradeoffs for some flashy capability, which don't age as well.

Re:The B-52 was designed in a hotel room over one weekend by chasil on Wednesday September 14, 2022 @10:06AM (#32837373)
How long have the B-52 jet engines had monocrystalline fan blades? That must have an enormous impact on efficiency and performance. They became available in the late 60s.

https://www.americanscientist.org/article/each-blade-a-singl...

Re:The B-52 was designed in a hotel room over one weekend by jabl on Wednesday September 14, 2022 @10:52AM (#32838072)
They're still using the original TF33 engine they were delivered with in 1961. Presumably the fan blades have been replaced many times over during maintenance, but I don't know if there's any advantage to switching to better blades if you don't change the operating parameters to take advantage of them.

There's a plan to replace all the engines with a modern turbofan (RR F130).

Re:The B-52 was designed in a hotel room over one weekend by yread on Wednesday September 14, 2022 @12:14PM (#32839283)
It's interesting that even though the bypass ratio changed from 1.4 to 4.2 (so it's quite a different engine, lot quieter for sure) the fuel consumption only went down 15% (22g/kN.s to 18.6g/kN.s)
Re:The B-52 was designed in a hotel room over one weekend by jabl on Wednesday September 14, 2022 @02:01PM (#32840834)
Hmm, I'm not familiar enough with jet engines to say whether that is expected or not. 15% doesn't sound like a huge improvement, I agree.

But I'll note the F130 is a medium bypass business jet engine producing 'only' around 75kN. 8 of those is about 600kN, which could be achieved with two of those newest generation civilian high bypass turbofans used e.g. in the B787 or A350. I suspect the motivation was to choose a new engine that is as similar to the existing one in order to minimize work needed to install them on the plane. There being AFAIU less than 100 B52's in service, I guess minimizing engineering cost has better payoff than minimizing fuel consumption with a high bypass engine.

Re:The B-52 was designed in a hotel room over one weekend by yread on Wednesday September 14, 2022 @04:50PM (#32843165)
These engines are also way larger diameter => redesign nacelles => higher drag and moment => engine mounts + wings ...

Also this family of engines (F130/BR700) has insane reliability - something like one unplanned engine removal per 100,000 hours. Some have reached 1 million hours

Re:The B-52 was designed in a hotel room over one weekend by chasil on Wednesday September 14, 2022 @02:44PM (#32841473)
So what happens if four newest-generation high-bypass turbofans are installed on a B-52?

Is the airframe at risk in doubling the thrust at full throttle?

Re:The B-52 was designed in a hotel room over one weekend by jabl on Wednesday September 14, 2022 @03:36PM (#32842231)
Doubling the thrust is likely overall a bad idea, for the reasons you mention.

Also looking at other posts in this discussion, it seems the 4-engine option (4x 150kN class size engines to provide about same overall thrust) was discarded because the asymmetrical thrust in case an engine gives out at a critical moment (takeoff, say) would mean that the plane would need a bigger tail in order to have enough rudder authority. Which in turn would mean that the airframe would need strengthening to take the added weight and stress from that bigger rudder. Etc. etc. leading to the cost of the engine replacement program spiraling out of control. So in that sense as close to a 1:1 as possible is the right decision.

Re:The B-52 was designed in a hotel room over one weekend by pdoege on Thursday September 15, 2022 @09:50PM (#32861065)
The plan in the 90s was to use 4 high bypass engines and replace the tail. At the time improving the -52 was not favored by the USAF because it would threaten the B-1. I still think it is the correct approach
Re:The B-52 was designed in a hotel room over one weekend by aj7 on Thursday September 15, 2022 @03:40AM (#32848506)
Of great importance was not rewiring or modifying all the engine controls: the new engines had to slide right in and attach to the controls the old engines used. This alone demanded 8 small engines. Read about how they solved the flutter problem on the 747 and you’ll appreciate how important it is not to change the aerodynamics of the wing in any way. Finally, competition for the contract was fierce as there were many different engines that approximately fit the profile: it was very close to competing business jet designs with successful production histories. Rolls Royce, I think, was a surprise winner.
Re:The B-52 was designed in a hotel room over one weekend by HPsquared on Wednesday September 14, 2022 @11:19AM (#32838451)
Turbine blades, not fan blades. The single crystal metallurgy is to avoid high-temperature creep (i.e. slow deformation over time under an applied load), which is a life-limiting factor in turbine blades. Especially the first row or two which see the highest temperatures.
Re:The B-52 was designed in a hotel room over one weekend by ofrzeta on Wednesday September 14, 2022 @09:57AM (#32837277)
Platonic question: is it still a B-52 then? cf. the Ship of Theseus
Re:The B-52 was designed in a hotel room over one weekend by GuB-42 on Wednesday September 14, 2022 @10:59AM (#32838200)
At least in civilian aviation, it is a very relevant and practical question, and a major contributor to the Boeing 737-MAX fiasco.

There is a thing called "type rating", that is qualification pilots need to have in order to fly a specific type of plane. For example, pilots need a type rating for the Boeing 737 in order to fly a Boeing 737.

Manufacturers try to do everything they can not to require another type rating when they make changes to an existing aircraft, because type ratings require expensive and time-consuming training that pilots and their companies would rather avoid, and it influences purchase decisions. One of the root causes of the B737-MAX crashes is that Boeing tweaked some settings in order to make the B737-MAX behave like the original B737 when it was, in fact, a different plane, and they did it wrong.

Re:The B-52 was designed in a hotel room over one weekend by KennyBlanken on Wednesday September 14, 2022 @03:50PM (#32842446)
> One of the root causes of the B737-MAX crashes is that Boeing tweaked some settings in order to make the B737-MAX behave like the original B737 when it was, in fact, a different plane, and they did it wrong.

This is wildly wrong. The only thing you got right is that the MAX was designed to avoid needing a new type certification.

Boeing radically shifted the Cg to accommodate changing trends in the commercial airline industry which were resulting in Airbus's planes being more competitive. They shifted it well outside what would be considered prudent.

This required flight control software bandaids to keep the plane stable (or perhaps better put, from entering a flight envelope where loss of control would happen), but they then also cheaped out of providing redundancy for some critical sensors... AND cockpit annunciators to alert on failures of the sensors.

Boeing then passed off the Cg shift and additional systems as very minor changes in the filing for their airworthiness certifications, the FAA rubber-stamped everything because they didn't have the staff to review all these certificate filings so they largely trust manufacturers...

...and then making things even worse, Boeing did very little to disclose the additional stability system and sensors to the airline's chief pilots who develop the in-house training. To say they were furious to learn they hadn't been told of the new systems would be an understatement.

The MAX crashes would have been substantially less likely if the pilots had benefitted from their airline's chief pilots knowing of the safety systems and having training on how to handle failurs, as well as warning annunciators for sensor failures....but Boeing wanted to save a thousand bucks or so per plane - or more likely, wanted to avoid drawing attention to the situation and having people ask "why is a critical flight control system dependent upon a single sensor?", which is likely why they also did little to inform airlines of the new systems, train the chief pilots on it, etc.

Re:The B-52 was designed in a hotel room over one weekend by GuB-42 on Wednesday September 14, 2022 @05:26PM (#32843608)
I generally agree with you, except for the fact that it was more of an aerodynamic issue than a center of gravity issue: the large body of the engine produced lift at higher angles of attack, making the nose go up and worsening the problem. The fact the engine was more powerful also contributed to that problem: the higher thrust produced more upwards torque.

And I am not saying that the software bandaid and the goal of avoiding a new type certification is a bad thing. In fact, it is done all the time with no ill effect.

What I am saying is that they did it wrong, and that's the real problem. Your explanation on what they did wrong is, I think, entirely correct.

My hypothesis is that if they didn't care about keeping the same type rating, they probably could have skipped the bandaid and trained pilots to just keep out of that dangerous configuration, just like pilots are trained to recognize, avoid and recover from stalls. It didn't look like an unmanageable problem for pilots, more like something they needed to be aware of and train for.

Re:The B-52 was designed in a hotel room over one weekend by geodel on Wednesday September 14, 2022 @10:14AM (#32837512)
I mean in this case yes. Since it is a brand and not a single B-52 physical plane which is being improved all these years.
Re:The B-52 was designed in a hotel room over one weekend by runjake on Wednesday September 14, 2022 @10:48AM (#32838024)
To eliminate confusion, the current operational B-52Hs were originally manufactured in 1960-1961.

They have undergone significant upgrades over the years, on all systems, including the airframe itself, since then.

Re:The B-52 was designed in a hotel room over one weekend by runjake on Wednesday September 14, 2022 @10:46AM (#32837996)
The earlier models were manufactured in the 1950s.

Most of the H models were manufactured in 1960 and 1961, but they have undergone significant airframe improvements, several engine improvements, and of course, avionics improvements.

It's still a B-52, but it's a "B-52H Block $whatever_design_block_they_are_on_these_days" model.

Re:The B-52 was designed in a hotel room over one weekend by hef19898 on Wednesday September 14, 2022 @10:33AM (#32837805)
Yes, it is. The current H generation has very little to do with the first build airframes so. Including certification.

EDIT: Those upgrade programs, e.g. the F-15 is currently at "X", are complete development programs and involve a certain amount of certification and re-certification. That in the case of the B-52 those upgrades have been applied to existing, tremendously old, airframes, doesn't change that. It does make it quite impressive so, the B-52 turned out to be a very flexible and upgradeable design.

Re:The B-52 was designed in a hotel room over one weekend by jeffdn on Wednesday September 14, 2022 @01:16PM (#32840210)
That's a little disingenuous, regarding the F-15 -- there is the A/B series, with A being single-seat and B being the two-seat trainer, and the C/D series, with the same distinction between the two models. Both the F-15A and the F-15C are air superiority fighters, with an exclusively air-to-air role. The F-15E is a multirole fighter-bomber, not an air superiority fighter. The F-15X is an F-15E repurposed as a beyond visual range (BVR) missile truck, with data links to AEWC planes that can provide targeting solutions for those missiles. All of the letters between E and X have not been used.
Re:The B-52 was designed in a hotel room over one weekend by coredog64 on Wednesday September 14, 2022 @01:45PM (#32840625)
The more useful identifier is the block number which identifies production changes.
Re:The B-52 was designed in a hotel room over one weekend by djmips on Wednesday September 14, 2022 @10:14AM (#32837500)
I think it is but they do rev the sub model number it seems.
Re:The B-52 was designed in a hotel room over one weekend by bee_rider on Wednesday September 14, 2022 @10:59AM (#32838195)
Wonder what a from-scratch B-52 equivalent would look like nowadays. I don't think they could resist the urge to give it a gimmick. Who wants to design a bomb truck?!?
Re:The B-52 was designed in a hotel room over one weekend by qbrass on Wednesday September 14, 2022 @01:18PM (#32840248)
You mean like a giant, tailless, stealth, flying wing? Or would that would be too gimmicky?
Re:The B-52 was designed in a hotel room over one weekend by bee_rider on Wednesday September 14, 2022 @02:32PM (#32841291)
The B2 is great.

But, while stealth is really useful, it does require some trade-offs. Since B-52 is only useful in cases where stealth isn't required, and it seems to still be in use, I guess if the B-52 were hypothetically retired there'd be room for a non-stealth replacement. Unless the techniques they developed to come up with the F-22 and F-35 opened up a possibility of a zero-compromise stealth design (I'm skeptical, but I don't know anything about plane development).

Re:The B-52 was designed in a hotel room over one weekend by HPsquared on Wednesday September 14, 2022 @11:23AM (#32838488)
The gimmick is that it's really big, I suppose.
Re:The B-52 was designed in a hotel room over one weekend by golemotron on Wednesday September 14, 2022 @10:08AM (#32837416)
> It's honestly a fantastic case for incremental improvements over time.

The trick is to design something solid enough to be a good base for incremental improvements over time.

Re:The B-52 was designed in a hotel room over one weekend by GartzenDeHaes on Wednesday September 14, 2022 @01:42PM (#32840595)
I don't think you would say that if you had ever been inside one. They are ancient -- and very greasy.
Re:The B-52 was designed in a hotel room over one weekend by parineum on Wednesday September 14, 2022 @12:28PM (#32839521)
> The first prototype of the B-52 may have been designed in a weekend.

Not even that is true. Here's the timeline from the article.

> In July of 1948, Boeing received a contract from the still-new U.S. Air Force to design and build a new heavy bomber.

...

> So when Boeing’s three-man presentation team arrived at Wright Field Air Force Base on October 21, 1948

...

> Warden suggested to the Boeing team that they do away with their design and come back to him with a new one that included turbojet engines ... unbeknownst to Warden at the time, Schairer happened to be carrying some work he’d already done on the possibility of a jet-powered bomber in his briefcase, giving him just enough of a foundation to think a redesign might be possible

...

>The next morning, which happened to be a Friday, the Boeing team returned with their newly jet-powered B-52 design, only to find that Warden remained unimpressed.

...

> The two soon joined Schairer, Wells, Carlsen, and Blumenthal in the increasingly cramped hotel room, pouring over sketches and quickly-scribbled mathematical computations. Computers wouldn’t become a common facet of aviation design for decades to come. It was up to these six men and their witts to design an entirely new bomber… and they had just 48 hours to do it.

..

> By Sunday, the team had compiled a full proposal that they turned over to a local stenographer to type up a clean copy. By Monday morning, they arrived back in Warden’s office with not only a fully-realized 33-page B-52 proposal but a silver, hand-crafted, 14-inch model of the bomber itself. Warden immediately took to the weekend design.

So, July -> October 26th (Monday morning)

4 Months isn't bad at all but it's not quite the 4 days suggested in the headline.

Re:The B-52 was designed in a hotel room over one weekend by closewith on Wednesday September 14, 2022 @09:41AM (#32837044)
> The B-52 of today was iteratively designed over decades and the current H models are entirely different planes than earlier models (although structurally very close to the G model).

The plane was only ever produced for a decade and the H model was last produced in 1963.

Obviously it has been retrofitted with new engines, avionics, armaments, etc, but it's not a fundamentally different plane.

Re:The B-52 was designed in a hotel room over one weekend by hef19898 on Wednesday September 14, 2022 @09:51AM (#32837184)
If every thing except the overall form of the fuselage is changed it is a new plane.
Re:The B-52 was designed in a hotel room over one weekend by tyingq on Wednesday September 14, 2022 @10:11AM (#32837456)
I don't think that's unusual at all for any jet aircraft that's around for decades. They almost all get new engines, avionics, etc. That the B-52 still has 8 engines is somewhat surprising...that's not terribly desirable.
Re:The B-52 was designed in a hotel room over one weekend by nradov on Wednesday September 14, 2022 @10:20AM (#32837609)
The Air Force considered replacing the 8 engines with 4 more powerful ones. However, they determined that the loss of one of those engines on take-off would cause a dangerous thrust asymmetry. Dealing with that would have required more extensive changes like moving the engine mounts, so they dropped the idea. But they are going to replace the engines with newer models.

https://www.thedrive.com/the-war-zone/42517/rolls-royce-will...

Re:The B-52 was designed in a hotel room over one weekend by LgWoodenBadger on Wednesday September 14, 2022 @12:08PM (#32839177)
I had seen/heard/read that the thrust asymmetry was a design feature to help with yaw, and that fewer engines would overpower the design limits of other parts of the airplane, to the extent that everything else would need to be redesigned to handle them (mounts, tail, rudder, etc.)

edit: I believe this is the original video where I saw the above https://www.youtube.com/watch?v=02_geGISTLg

Re:The B-52 was designed in a hotel room over one weekend by palunon on Wednesday September 14, 2022 @01:44PM (#32840621)
You can use thrust asymmetry to help with yaw, yes.

But here we're talking about unplanned sudden thrust asymmetry, causing a massive yaw force at a critical phase of flight, takeoff, where you're engines are likely to be near their full power and you're close to/on the ground.

If you go from 8 engines to 4, loosing one engine goes from causing 25% thrust loss on the wing to 50%.

Re:The B-52 was designed in a hotel room over one weekend by tyingq on Wednesday September 14, 2022 @03:25PM (#32842064)
Makes sense, but must be also tied to something else unique about the B-52. There are certainly much larger aircraft with 4 engines.
Re:The B-52 was designed in a hotel room over one weekend by bell-cot on Wednesday September 14, 2022 @10:41AM (#32837927)
What if most major structural elements of the plane, the skin, the control surfaces, etc. are ~1960 original? Multiple rounds of upgrading avionics, weapons, engines, etc. are extremely common in military planes.
Re:The B-52 was designed in a hotel room over one weekend by rgoulter on Wednesday September 14, 2022 @09:56AM (#32837254)
Re:The B-52 was designed in a hotel room over one weekend by usrusr on Wednesday September 14, 2022 @10:31AM (#32837768)
..for certain definitions of "new" (last built 60 years ago)
Re:The B-52 was designed in a hotel room over one weekend by justsomehnguy on Wednesday September 14, 2022 @09:55AM (#32837241)
Only if the new plane is not Tu-144 or Buran. Then it's not a new plane, but a stolen one.

/s

Re:The B-52 was designed in a hotel room over one weekend by p_l on Wednesday September 14, 2022 @10:06AM (#32837381)
Buran was made to look like Shuttle (despite opposition of engineers on the project), but was completely local design.
Re:The B-52 was designed in a hotel room over one weekend by paganel on Wednesday September 14, 2022 @10:38AM (#32837883)
I’ve not read too much on the Soviet space program, but whenever I read about Buran (a wonderful accomplishment per se) my thought process goes something like this: “The Soviets must have seen the Americans working on the shuttle thing -> the Soviets must have thought that that shuttle thing was great mostly on account of the Americans working on it -> the Soviets built a shuttle system for themselves -> the Soviets threw away lots of resources for almost nothing”.

Also, as it became apparent in the meantime, even the Americans didn’t get it right when it came to the reasons behind building the shuttle system. As far as I understood there were other, less expensive ways, that they could have taken in order to “improve” their space program.

Re:The B-52 was designed in a hotel room over one weekend by p_l on Wednesday September 14, 2022 @11:00AM (#32838206)
Buran system was very, very different from US' STS, and honestly multiple groups combined under one umbrella to get what they wanted in Buran project. Some bits of Buran were a "me too" (the visual look of the orbiter, for political reasons), but Soviet space program has combined multiple previous tracks that existed independent of what Americans were doing.

Among various tracks that combined together, there was

1. Super Heavy Launcher - a long term dream since the failure of N1, realised in Energia

2. Reusable crewed orbiter - Buran orbiter

3. Mir-2, the successor to Mir space station - was supposed to use (1) for construction and (2) for crew

4. Fully reusable launch vehicle - was proposed continuation of Energia project

5. various missions requiring super heavy launchers (either Energia, or prospective Vulkan which added extra energia core stage on top) - including mars missions that were on slow boil since end of moon program

6. Soviet Space Forces - anti-SDI systems, orbital warfare unmanned cruisers (Polyot) etc. - dependant on (1).

7. Reduction of space construction and launch costs - nuclear-powered orbital tug launched by Energia which would be responsible for moving objects from low LEO to target orbit, including GEO

1,2,4, and 7 were all included directly in the scope of Buran, with Polyot (6) being in progress as well (the other Energia launch was launch of Polyot test unit).

Note that Buran orbiter, the one part that resembled Shuttle, is independent of other tasks though considered beneficial for the space station goals - if the orbiter project failed, it would still provide data for Reusable Energia variant, and Energia would still mean a working 100t-to-LEO system they could use for whatever - unlike Shuttle which was one specific vehicle. This also meant that Buran's orbiter had much lower cargo capacity - because it didn't need to have higher one as space station modules and the like could just use Energia.

Re:The B-52 was designed in a hotel room over one weekend by paganel on Wednesday September 14, 2022 @04:52PM (#32843182)
Thanks a lot for the detailed response, that cleared up things for me.
Re:The B-52 was designed in a hotel room over one weekend by aerostable_slug on Wednesday September 14, 2022 @01:29PM (#32840418)
How does one separate the outer mold line of the spacecraft from its performance?

Isn't Buran's appearance driven by similar requirements vs. aesthetics? What else would it have looked like — if you want lots of crossrange capability, you're not going to get something that looked like Faget's designs, would you?

Re:The B-52 was designed in a hotel room over one weekend by p_l on Wednesday September 14, 2022 @05:14PM (#32843441)
Buran had different design requirements (once you discard the political), because unlike STS the orbiter wasn't sole launcher of the system - Energia took care of shipping heavy cargo to whatever orbit you wanted. So they had different set of constraints including size & prospective contents of the cargo bay.

They have also flirted with the idea of just putting two jet engines into orbiter for extra cross range, which was probably not an option on STS given the huge dead weight of engines

Re:The B-52 was designed in a hotel room over one weekend by aerostable_slug on Thursday September 15, 2022 @01:51PM (#32855845)
It wasn't needed because the STS wing area achieved the goal of not overflying the Soviets after dropping off a military satellite (once-around mission out of Vandenberg SLC-6), and the US had many politically friendly potential landing areas, while USSR did not.

Catering to NRO and USAF wartime requirements doomed the STS to cost overruns. Sticking with Faget's designs and the NASA requirements may have salvaged the program's cost goals, but I'm no expert.

Re:The B-52 was designed in a hotel room over one weekend by p_l on Thursday September 15, 2022 @02:38PM (#32856522)
The two stage design from IIRC phase II of Shuttle project was a marvel
Re:The B-52 was designed in a hotel room over one weekend by justsomehnguy on Wednesday September 14, 2022 @10:27AM (#32837719)
> despite opposition of engineers on the project

Huh? Despite 'opposition'? Can you elaborate?

(also make sure not to miss /s in my previous comment)

Re:The B-52 was designed in a hotel room over one weekend by p_l on Wednesday September 14, 2022 @10:40AM (#32837907)
I didn't miss the /s, but I feared others might think different ;)

From what I've read, the decisions to make Buran look externally like STS orbiter was a political one, and the engineers at MiG OKB weren't happy about it - they have been working on a bunch of space planes for some time, including the infamous suborbital fighter. However the similarity was found to have political benefits in the weird opposite of kremlinology and the decision stood.

Not having USAF's annoying requirements though, they were able to design a better system anyway. (Pre-USAF involvement STS was also better, but congress cost cutting made a necessity of begging DoD for funds)

Re:The B-52 was designed in a hotel room over one weekend by justsomehnguy on Wednesday September 14, 2022 @03:24PM (#32842048)
I checked the Wiki article on it, just to be sure.

I just don't understand how it could look any way different (at least significantly), this is a classical case of the function dictating the form.

Re:The B-52 was designed in a hotel room over one weekend by p_l on Wednesday September 14, 2022 @05:11PM (#32843416)
Essentially, the Buran orbiter had different function, and thus different forces on its form.

US' STS shape was ultimately dictated by its cross range requirements combined with cargo capacity. Explicit case of function leading to specific form.

Buran didn't require the same huge cargo capacity in the orbiter, because Soviets had already tested and verified self-assembly of space station in orbit from multiple launched modules (technology that they would later employ in ISS). For huge capacity it had Energia, which once proven could be also launched on Polar orbits (the specific requirements from USAF for STS involved heavy cargo on polar orbits from Vandenberg).

This meant that Buran orbiter had wider design space to explore, and previous experiments in crewed reusable spacecraft were centered around lifting body shape, to extent much higher than STS was. However, the command to make it look like US STS came pretty early in the project, in addition to general lack of documents, so we don't really know how they would go.

Re:The B-52 was designed in a hotel room over one weekend by justsomehnguy on Wednesday September 14, 2022 @05:46PM (#32843844)
Ah, that clears some things for me, I thought more about the aerodynamic form.

> the command to make it look like US STS came pretty early in the projec

I never heard anything about that, AFAIR.

Any ideas where to look abou that?

Re:The B-52 was designed in a hotel room over one weekend by p_l on Wednesday September 14, 2022 @08:05PM (#32845215)
I wish I was more diligent in noting back then, but essentially I went on a long walk on google, encyclopedia astronautica, checking russian pages with google translate etc. trying to read as much about the project - at the time it was still running we had more information published in Poland about Shuttle (including accurate drawings and system descriptions) than about Buran, and thus I was always left fascinated about this space plane that, compared to STS, I had only a blurry photo and maybe A4 page of description.
Re:The B-52 was designed in a hotel room over one weekend by justsomehnguy on Thursday September 15, 2022 @05:31AM (#32849301)
> Buran

> 27. Alternative projects considered at the stages of the preliminary design and preliminary design: attempts to create OK "Buran" on the basis of OK "Spiral" - what was proposed (options and technical solutions) and what was accepted, what was not accepted, how and why.

> Orbital vehicle "Buran" in landing configuration

> Answer: We (NPO Molniya) worked on an alternative variant in a guise that mimics that of the Spiral orbital plane, but General Designer Glushko considered that by that time there were few materials that would confirm and guarantee success at a time when Shuttle flights proved that the Shuttle-like configuration works successfully and there is less risk when choosing a configuration, therefore, despite the larger useful volume of the Spiral configuration, it was decided to carry out the Buran in a configuration similar to the Shuttle configuration. Although the absence of sustainer engines on the Buran noticeably changed the centering, the position of the wings, the configuration of the influx, and a number of other differences.

> 28. Was the copying of "Space Shuttle" in a larger or smaller volume during the creation of Buran deliberate or were there "directive instructions"?

> Answer: Copying, as indicated in the previous answer, was, of course, completely conscious and justified in the process of those design developments that were carried out and during which, as already indicated above, many changes were made to both the configuration and the design. The main political requirement was to ensure that the dimensions of the payload compartment were the same as the payload compartment of the Shuttle.

https://www-buran-ru.translate.goog/htm/archivl.htm?_x_tr_sc...

Re:The B-52 was designed in a hotel room over one weekend by aerostable_slug on Thursday September 15, 2022 @01:59PM (#32855953)
> Shuttle flights proved that the Shuttle-like configuration works successfully and there is less risk when choosing a configuration

Classic Soviet risk-averse behavior. See also: copying every single detail from the B-29 because they knew it worked and it would be their heads (perhaps literally) if the Tu-4 didn't. They did the same thing with Joe-1, their first atomic bomb test. Do what you know works so you can go home at the end of the day. Innovation is a luxury.

This is what happens when employees fear management. Lessons to be learned.

Re:The B-52 was designed in a hotel room over one weekend by justsomehnguy on Friday September 16, 2022 @03:53AM (#32863359)
> This is what happens when employees fear management. Lessons to be learned.

You just listed the things what management decided to do, so risk aversion was on management side, not employees.

Just like the idea to copy S/360.

Re:The B-52 was designed in a hotel room over one weekend by p_l on Thursday September 15, 2022 @01:46PM (#32855774)
Thank you for finding more!

I guess I was wrong on that part. Interesting that Spiral had greater capacity, I thought the opposite based in some of the sketches - possibly I mixed up sketches of another MiG space plane.

Wish someone manages to one day do a definitive history translated into English

Re:The B-52 was designed in a hotel room over one weekend by themadturk on Wednesday September 14, 2022 @02:48PM (#32841526)
It's worth noting that the C-130 Hercules has been in continuous service since 1956, and new aircraft were still being produced at least as recently as 2015 (and perhaps longer). That aircraft really is a flying truck!
Re:The B-52 was designed in a hotel room over one weekend by jackcosgrove on Wednesday September 14, 2022 @11:26AM (#32838539)
> Claiming that something was designed in a day is good clickbait

It also glorifies an attitude that the greenfield design process is where the wizardry happens, and that forgetting about or dropping products after this stage is acceptable. Only failed products don't need to be maintained and refined.

Re:The B-52 was designed in a hotel room over one weekend by cs702 on Wednesday September 14, 2022 @11:42AM (#32838760)
The OP is emblematic of the "cocktail-party level of understanding" that leads people to discount how hard it is, and how much blood, sweat, and tears it takes, to build anything complicated, like a plane: https://danluu.com/cocktail-ideas/
Re:The B-52 was designed in a hotel room over one weekend by bombcar on Wednesday September 14, 2022 @01:48PM (#32840672)
It also downplays the absolute skill you need to be able to do even the “weekend session” and get something that’s workable - anyone can doodle a design in a weekend and even make changes to it, but getting one that’s actually a workable foundation requires people who know what they’re doing.
Re:The B-52 was designed in a hotel room over one weekend by thejosh on Wednesday September 14, 2022 @09:55AM (#32837238)
One of my favourite (probably misquotes) is "I wrote FAT on an airplane!" from Bill Gates.
Re:The B-52 was designed in a hotel room over one weekend by larrywright on Wednesday September 14, 2022 @10:10AM (#32837451)
Re:The B-52 was designed in a hotel room over one weekend by BolexNOLA on Wednesday September 14, 2022 @10:26AM (#32837703)
I don’t know. Seems like apocrypha layered on apocrypha go me

>…I wrote FAT on an airplane, for heaven’s sake.”

>(I can’t believe I had to write this: This is a dramatization, not a courtroom transcript.)

>This “I wrote FAT on an airplane” line was apparently one Bill used when he wanted to complain that what other people was doing wasn’t Real Programming. But this time, the development manager decided she’d had enough.

>“Fine, Bill. We’ll set you up with a machine fully enlisted in the Windows source code, and you can help us out with some of your programming magic, why don’t you.”

>This shut him up.

Re:The B-52 was designed in a hotel room over one weekend by larrywright on Wednesday September 14, 2022 @02:56PM (#32841634)
Kind of, but the source here is someone who has been at Microsoft a very long time. Given that he didn’t put any qualifier around this story about it possibly not being true, I think it’s more likely that it is true. If this were J Random Blogger I’d agree with you.
Re:The B-52 was designed in a hotel room over one weekend by jrc2022 on Wednesday September 14, 2022 @10:02AM (#32837339)
that i would believe
Re:The B-52 was designed in a hotel room over one weekend by sebastianconcpt on Wednesday September 14, 2022 @10:41AM (#32837929)
I don't see anything wrong or less deserving of merit in designing something remarkable in a short time.

How much does it take to have a life-changing insight? or the moment of solving a challenge to resolve a theorem demonstration? An instant or your whole life up to that point?

Re:The B-52 was designed in a hotel room over one weekend by NoFactualActual on Wednesday September 14, 2022 @12:00PM (#32839065)
Seems like a language thing—I'd distinguish the initial "design" from the iterative "engineering". Of course, you could describe the latter as design, too, but it's an ambiguous word (like most words). The people taken by this clickbait aren't going to care which word is used.
Re:The B-52 was designed in a hotel room over one weekend by zymun on Wednesday September 14, 2022 @01:01PM (#32839990)
Also, the people designing these things have years of experience and are most likely thinking about these designs daily through out the years. So, in reality it's 100s of years of synthesized experience to be able to design something over a weekend.
Re:The B-52 was designed in a hotel room over one weekend by fellellor on Friday September 16, 2022 @05:33AM (#32864047)
Same goes for JavaScript. The first version is nowhere close to the beautiful, expressive and powerful masterpiece that we have today.
Re:The B-52 was designed in a hotel room over one weekend by throw0101c on Wednesday September 14, 2022 @10:43AM (#32837953)
> Another HN commenter mentioned GPS being designed over a holiday. But we spent years and years in the military debugging GPS and making it functional.

GPS/Navstar also wasn't the first system:

* https://en.wikipedia.org/wiki/Transit_(satellite)

* https://en.wikipedia.org/wiki/Global_Positioning_System#Pred...

* https://en.wikipedia.org/wiki/Satellite_navigation#History

Re:The B-52 was designed in a hotel room over one weekend by duxup on Wednesday September 14, 2022 @12:47PM (#32839785)
"Idea guys" everywhere salivate over these stories I bet.
Re:The B-52 was designed in a hotel room over one weekend by noneeeed on Wednesday September 14, 2022 @11:46AM (#32838823)
An overnight success that was years in the making...
Re:The B-52 was designed in a hotel room over one weekend by dylan604 on Wednesday September 14, 2022 @01:30PM (#32840435)
Designed in a weekend is the perfect HN trope.
Re:The B-52 was designed in a hotel room over one weekend by fnordpiglet on Wednesday September 14, 2022 @10:44AM (#32837972)
Inspiration / perspiration?