JET is a 1980s research project into how to contain a plasma and squish it enough to achieve fusion at all, not a practical generator. It doesn't have superconducting magnets, it runs on big lumps of copper, with limited cooling and no way of recovering output power.
In the latest run, they achieved fusion and kept it running until JET ran out of power for its magnets. The plasma didn't touch the reactor walls, didn't destabilize, didn't crap out in any of the numerous other ways. They had to shut it down before it overheated and burned out.
(I've been reading reports for a while about the use of massive amounts of computer power -- and deep learning -- being necessarily to stabilize plasma in a reactor. That seems to be what this demonstrates.)
This is probably JET's swan song. They've pushed it as far as it can go; also, the D-T reaction produces surplus neutrons so tends to generate radioactive waste via secondary irradiation of the reactor core -- which makes it hard to get inside and fiddle with it.
https://nationalmaglab.org/user-facilities/dc-field/instrume...
Not that it has anything to do with plasma research, I just thought it an interesting fact.
ITER uses NbTi, SPARC uses YBCO.
Unfortunately, a lot of other fusion news is not similarly fundamental, though, so it can get tiring to see "we made a few extra watts but the reactor still went unstable."
It's like articles about Facebook and how their value fluctuates and this or that privacy issue is going to be fixed soon. People have heard about the big players, so big players get the attention.
I'm trying to do some fusion research myself, but it's extremely difficult to get anyone to take what I'm doing seriously.
I've got a completely new design, and it still needs to be tested. Do you know how difficult that is when nobody will even look at it, and I have to do everything myself?
I don't even know why I talk about it at all.
I've got some info about it at http://www.DDproFusion.com
1) ditching the toxic negative attitude. It pushes away interest.
2) spend an afternoon or a few bucks on a web designer making your site look better than the "time cube" site. It practically screams crackpot theory.
3) build credibility with academics first. People not in the field will assume you're a swindler by default.
2 - I see, I'll look into presenting more professionally.
3 - I believe Ideas should be evaluated on their merit, and what people think about the idea or myself isn't going to change the physics. It will either work or it won't
How is this supposed to help people take you seriously? What are your credentials? Why should anyone take you seriously?
Are you an academic? Have you submitted this to academic journals or individuals? Have you tried to make or made any connections to anyone in the field?
Also, are you the guy who bought the warehouse full of CD's?
I'm not an academic, but have a reasonable level of physics understanding. The concept is simple enough that it should be understandable by people that have a basic understanding of how charged particles behave in a magnetic field.
It should be taken seriously because it's a good idea, and deserves to be studied. I readily admit that a full analysis is beyond my abilities, but I haven't been able to find anyone that can do any better at evaluating it, and I've talked to a lot of people.
I'm moving forward with the self funded construction of the prototype, because with this type of thing, I don't think ANYBODY can say with certainty that it will work or not. Even simulations aren't enough to tell for sure.
And yeah, I'm also trying to restart Murfie among other things.
This is usually a lot more common in software projects, and it doesn't come across well when most the effort is clearly (at least from a quick overview)from a single person.
Personally I find this news very exciting, but I’m a fairly half-full glass kind of person!
The only reliable product of the hot-neutron fusion research industry is dishonesty.
There is also aneutronic fusion, that might actually have a future, even if only in space: If we are ever to operate in the outer solar system, something of the sort will be needed. Unfortunately it gets almost no money.
Hacker News comment in late 19th century: "They are forever making flying machines have a little more lift, on the verge of break-even, on track to enabling free flight without nasty immediate crashes. But it is always a con.... The only reliable product of flying machine research is dishonesty."
The truth is that people both over- and under-estimate what can happen in the future. You can't use simple-minded heuristics either way; technoutopianism is at least as dangerous as blind opposition to change.
Not saying that fusion power on earth is viable (I personally think that it is), but it's disingenuous to compare it to perpetual motion.
At this point we just don't know whether fusion is like airplanes or whether it's like perpetual motion. Unless you are proposing building an actual star, the existence of stars tells us approximately nothing about whether a fusion-based power plant is economically achievable in our lifetimes.
I think it's an interesting idea and I'd love to see it happen. But I think it's important to be realistic in our discussion of it.
That's not correct at all. The simple-minded heuristic is along the lines of "technology is bad" or "this new thing will never work".
But the dream of fusion as "too cheap to meter" has been going on for 70 years. The comment you're replying to wasn't talking in general terms, but had specific critique of both the long track record and the practical utility of the product they're shooting for.
It might work and it might not; I have no idea. But your attacking a straw man won't help it get there.
ITER is the Samuel Langley of the present day.
A great example is Germany over the past year had uncharacteristically low wind for months and months on end, dropping power generation by as much as 30% for the year from that source.
The result? They burned A LOT of gas and coal. A LOT.
The reality is that power use doesn't necessarily follow the sun or the wind, and so buildouts of those technologies need to be done at extreme multiples of baseline need to account for entire seasons of low output (or just burn hydrocarbons...). You have to build your wind and solar to support a hypothetical 10 or 50 year minimum production, and just overproduce at all times.
This is why baseload nuclear generation will remain a fantastic choice for nations for decades to come, even at a higher price. Nuclear runs at night. It runs when the wind is still. It runs and runs and run no matter what, providing consistent and predictable power. For every MW generated by nuclear, you need about 4 produced by solar/wind, to achieve the same up-time and reliability.
And that's before we discuss the ecological concerns of one tiny little nuclear facility versus dozens of square kilometers of solar/battery builds out to match it.
If our society abandons fission in favor of solar/wind only, it will be to our detriment
Subsides could make up the difference for nuclear as could vastly increased nighttime prices.
PS: It’s only when your looking at islands like say Hawaii where you want that kind of massive overproduction. Across larger areas you never see 100% production from everywhere at the same time, but you also don’t see minimum production from everywhere at the same time.
They're not the only ones:
> the 732-mile TransWest Express high voltage transmission line filed its first permit application in 2007, but did not receive all of the approvals until 2020. The Environmental Impact Statement alone took eight years to complete.
Local landowners tend to object to these projects. On average, they take over a decade to complete and that includes much shorter lines, which are quicker. Building underground can help with political resistance but multiplies cost by 5X to 10X.
As of 2020, over 750 GW of proposed generation, most of it wind and solar, were waiting for transmission to be built.
https://www.belfercenter.org/publication/challenges-decarbon...
China builds transmission a lot faster, and we might be able to speed things up with the SITE Act, which gives the federal government authority to override local and state resistance: https://www.theatlantic.com/science/archive/2021/07/america-...
But if our solution set can include unpopular new laws to override NIMBYism, then we can make nuclear a lot faster and cheaper, too.
Nuclear also takes 4-6 years to build but can take decades to get permission to start.
So, the main role of interconnect is to deliver power that is cheaper than replenishing your storage locally, or to use replenishing your storage faster than you could with local generation or by ship.
Far-northern climates will need to keep stockpiles of anhydrous ammonia or hydrogen to burn in gas turbine generators when transmission lines fail, probably synthesized using equatorial solar and shipped, or synthesized using transmission-line delivered hydro power. Each place will use the cheapest power available in each moment.
The LCOE for grid storage of power (necessary addition to solar) is $160/MWh.
Double solar with grid storage is as much as $300/MWh at the utility scale using globalized averages reported to NEA, BNEF, Lazard, IRENA 2018-2020. Obviously some countries will be a lot more or less on costs depending on their circumstances and location.
Interconnect isn't enough, all of the US is in darkness for several hours a day. (And Texas will never connect). You require storage, and I still question if 2X is enough to produce enough power during a 10 year minimum without firing up extensive hydrocarbon peaker plants.
https://en.wikipedia.org/wiki/Levelized_cost_of_energy#/medi...
Your $50MWh also does not include storage LCOE, and not including secondary costs for solar when Nuclear has no secondary costs is considered "a trick" to lie about solar costs.
Include the costs of gigawatts of Elon's lithium ion batteries, and include the cost of having to 2X-4X solar compared to Nuclear to account for variable solar output due to days and seasons, as I said, and your $50MWh becomes around $300MWh
Your also trying to cherry pick numbers the Wikipedia article also lists “$164/MWh” for nuclear. I found the table you got those numbers from which included multiple estimates from 2018 that used data from 2015 and double counting very optimistic nuclear estimates. Frankly utility solar is already being installed at sub 2c/kWh in the US. 68$/MWh would be 6.8c/kWh which shows how far off your umbers are.
Anyway, I would be happy to see the power plant actually run that cheaply but your looking at very optimistic estimates for something that isn’t even online yet and is getting some serious subsides.
Having said that if you’re data is from “Source: IEA/NEA, 2015.” https://www.oecd-nea.org/ndd/pubs/2018/7441-full-costs-2018-.... I can understand why you picked those numbers.
So many people talking about energy seem to be stuck in an obsolete past.
I think you should rephrase that, because it's pretty insulting to researchers who have been working incredibly hard on taking steps towards Fusion.
I think the phrase you were grasping for is: "I doubt it will ever be economically viable".
This. Every time I read a fusion "breakthrough" story I imagine the history books of the year 3000: "Back in the early 21st century, they spent billions trying to build a star on Earth, when there was a perfectly good one in the sky that produced 1000W per square meter that they could have used for free."
We don't have the storage. We are not close to sniffing the amount of storage we need to be 100% reliant on solar + wind.
So if we nationalized all the tesla gigafactories, it would take us over 760 years to produce enough batteries to store a single days worth of electricity.
I do not think grid storage is solvable with current technology.
The largest pumped hydro station[1] provides up to 24 gwh of storage. So three thousand of these stations (costing $12 trillion) would store one day's worth of electricity.
[1] https://en.wikipedia.org/wiki/Bath_County_Pumped_Storage_Sta...
Storage ‘buys’ energy when it’s cheap and ‘sells’ it when it’s expensive, where ‘cheap’ can even mean ‘free’ at times.
You would build it using averagely priced energy (using only cheap energy is impractical, as it would keep machines and personnel tied up waiting for prices to drop)
Also, having a large buffer can mean having to spend a lot less money on excess solar and wind farms. They wouldn’t have to meet all peaks in demand.
Those still could make it economically viable.
We all know the name, but its main feature is its dishonesty.
The sound idea is water stored up an existing hill. On flat land you store your energy some other way: underground hydrogen or compressed air, or iron-air batteries, or liquified air, or any of various other choices that are more expensive and less efficient than pumped hydro. Or just run a wire over to someplace that does have hills.
Some places have no hills, so are not candidates for pumped hydro storage, and would need to rely on something else, such as long-distance transmission lines, or liquified air, or synthesized hydrogen, or synthesized ammonia, or underground compressed air, or iron-air batteries, or numerous others, or (most usually) some combination of them.
Renewable advocates would be more successful if they were realistic about the problems with significant solar reliance.
How is this an interesting argument? Of course we don't have things before we build them. That's true of nuclear power plants, too. We can likely build out storage faster than NPPs, with more aggressive cost decline with cumulative production.
First, this is yet to be determined. Even assuming it is true, which I'm not sure it is, The problem is not limited to storage - you also need massive transmission system upgrades that will cost on the same order of magnitude as an Apollo program. I think in the long term it should certainly be done, but pretending that the cost of solar and wind power is the cost of solar panels, or even the cost of solar panels + storage is not comparing apples to apples.
With distributed electricity generation e.g. microgrids, the need for big, centralized storage decreases, as does the need for large-scale transmission.
By the time fusion generators exist in a practical form (at least 20 years from now), we won't need them.
This also applies to nuclear fusion (and, BTW, fission) reactors.
Never mind what happened at Fukushima, right? /s
Heck, nuclear is still competitive with solar and wind in terms of deaths/MW produced. And this is all the more stark considering nuclear designs stagnated 60 years or so ago. If we hadn’t divested from that technological path we’d have drastically cheaper and safer nuclear energy today and global warming potentially wouldn’t even be a problem.
Normally nobody gets indicted, and nobody ever has to give any money back.
Is the construction industry really so corrupt? Is government and industry unaware or unwilling/unable to detect this earlier and stop it?
You sometimes see bitter comments when they are approaching or are in retirement.
Historically the first build of a type has _generally_ been problematic.
But there has never been a privately financed nuke plant.
Why?
A hundred billion dollars estimated for one several GW plant, and decades for construction. Meanwhile, solar and wind get cheaper every year, with no bottom in sight. The longer they take on fusion, the less competitive it gets, and it starts out way behind, with no possibility of ever catching up.
Somebody with one leg can do a lot better in a race than somebody with none, but that is not the measure to consider when the competition is with two-legged runners. (Hint: they win.)
So if any of fusion startups can make operating plant within the next 20 years, it can be used. But if that takes longer, then I agree that large-scale fusion will not happen.
Heating and lamp gas composed of of hydrogen and carbon monoxide (!) were once delivered throughout cities through cast-iron plumbing. That was displaced by "natural gas" as increasing numbers of people were found to have been asphyxiated after a lamp flame in their house died, typically from a pressure fluctuation.
Natural gas then had to have mercaptan odorants added after leaking gas accumulated undetected and exploded. Then, valves that would only stay open when hot came into regular use, for pilot lights. Now pilot lights are gone, replaced by spark generators. Hydrogen will displace natural gas in industrial settings, but synthetic methane or propane will probably be needed for domestic use.
I'll add that the alternative proposal, excess renewables with curtailment, has 0% efficiency on the curtailed power. Using that power for anything at all, including making hydrogen, is more efficient that just dropping it on the ground.
But hydrogen is very far from the only storage choice, it is just one that is attractive for numerous ancillary reasons: we need to make the hydrogen regardless, so might as well store it too.
Yes, making magnetic fields stronger can give one higher power density than ITER. But one runs into a limit because of power density at the wall. Once you're at that limit, higher magnetic fields don't really help.
ARC's volumetric thermal power density (volume of reactor, not of the plasma) is just 1/40th that of the primary reactor vessel of a commercial pressurized water fission reactor.
60% of the mass of an ARC reactor is in the steel structural supports for the magnets, so it's about at the upper limit for steady magnetic fields in a fusion reactor.
Plus a fusion plant can be very quick to start and shutdown or throttle down which is very useful for base load.
You don't need to separate all the different parts. You reprocess our old waste into fuel for modern reactors. In those reactors higher actinides will be burned up. And the resulting output does not have higher actinides and only needs to be stored as long.
Moltex Energy is currently engaged with the Canadian regulator for such a facility, the process is called WATSS. Doing this is actually cheaper then the deep storage storage facilities proposed in many countries. Sadly because of political bullshit reprocessing has been made illegal in the US.
Such things would have been doable decades ago, and the money for it is already on bank accounts in most countries. But politician force the 'dig a hole for everything' solutions instead.
> Plus a fusion plant can be very quick to start and shutdown or throttle down which is very useful for base load.
Next generation fusion would also be very reactive to changes. Far more then traditional.
But the reality is you actually want to run full power as much as you can, no matter if fission or fusion.
Fusion solves a minor problem of fission while making the major problem worse. It's a great example of misplaced focus.
Cooling down the magnets of a fusion plant is not a quick process, btw. Hell, just getting a fusion plant built with RAFM steel up to operating temperature is a delicate process. Once irradiated, the temperature window that material can operate at is rather narrow (300 C to 550 C; below that it's too brittle and above that it creeps.)
If you can build a nuclear plant with 500MW output and reduce the amount of concrete needed by significant factor, all of a sudden your are quite competitive.
Just for comparison, this is one of the furthest along commercial GenIV projects designs:
https://www.youtube.com/watch?v=1pZC_ajI8Hs
No massive cooling towers. No gigantic containment cylinder. No gigantic low-pressure steam turbine.
In a PWR the core containment vessel is incredibly expensive and can only be built a few places, but its actually not the cost driver. Even so, compare to those, modern GenIV core vessels are vastly cheaper.
Not having to weld 8 inch gigantic steel vessels is far easier. See:
Fusion has all of the characteristics of something you'll want to do if you are in space. Add to that the fact that its fuel is much easier to acquire than fission and that solar isn't available everywhere and you have a winner.
Meanwhile down to Earth, yes, most likely it will never be an important energy source.
D-He3 (deuterium and synthetic helium) is attractive, except you have to make the He3 by making tritium and waiting for it to decay. pB (hydrogen and boron) is attractive, but much harder to make work than D-He3.
There is work on a D-He3 rocket, tagged "Princeton FRC", that they hope to loft for a trial maybe in 2035. Elon could get it tried out earlier, and ought to. We should be cranking tritium production up immediately so there will be enough He3 when we need that.
DT fusion reactors would be very heavy. ARC, for example, would have the weight of a couple of US WW2 destroyers. DT fusion delivers its energy as heat. A fission reactor would be far smaller, simpler, cheaper, and more reliable.
You might make the case for advanced fuels, but that likely means you have to get 3He from somewhere. I suspect beamed power will beat even advanced fuel fusion in all missions in the future (a weak prediction as I will not be around to see.)
In space, the fission doesn't need containment, or even much shielding if it is far enough away from the rest of the ship.
In the cloud tops of Titan, Venus, Saturn, Uranus, or Neptune, a nuclear power plant may be as simple as a naked pile suspended near the bottom of a big fabric tube with wind turbines at the top. The radioactively-heated, buoyant air inside holds it up, and, escaping through the turbine, generates power. (Enough is held back so it stays up.)
Perhaps surprisingly, gravity is almost Earth-normal on all four planets. Perhaps more surprisingly, the temperature at a not unreasonably-high pressure is also close to Earth-normal (except on Titan). But getting back to orbit from any of the last three would be very, very difficult, so such a reactor would only ever power robots.
Getting back to orbit from Titan is easy. From Venus, it is pretty hard; and once in orbit you would need to refuel to get anywhere else.
More likely we just don’t know the way to make it viable yet.
We are in the position of the person whose car keys were lost somewhere, but we are looking only under the D-T fusion streetlight because we can't see anywhere else.
Exactly! If we just used every last drop of fossil fuels we had to build, ship, and constantly replace solar and wind generators (and do the same for the massive battery arrays we'll need), nuclear will be a distant memory.
> fission reactors are today not competitive
...because price =/= cost. Fission is the least costly form of energy generation, but our economy is too worthlessly opaque to realize the true cost of building all those beloved solar panels. If we got price and cost more in parity, nuclear would be the painfully obvious choice.
Markets fail yet again, I suppose.
> The only reliable product of the hot-neutron fusion research industry is dishonesty.
I can agree with you there. Every few months there's a "breakthrough!!" article where Qtotal is still < 0.01...cool, that's helpful...
This has ceased to be true.
No, we are just incompetent idiots. This has nothing to do with fissions and everything to do with degradation of contruction and practical egnineering skills - now it takes 30 years and 100 billion dollars to make a small railway in California. Victorian England or China could do this without much trouble.
The english-speaking western nations have definitively and measurably degraded - every time an airport or a port or any major piece of infrastructure needs to be built, its a source of drama and infighting for 30 years. A nuclear powerplant is just a big construction project, and nations that can build a railway without a fuss, have demonstrated their ability to build a reactor without a fuss.
We are going to have to fix this if we don't want to decline into barbarity in the next 100 years. We can trade and launder the world's money and stocks but we can't build a bridge. Eventually the physical really will catch up to us "cough climate change', and you can't bribe laws of nature.
Sure you can 'cheat' by buying pre-built solar panels and wind turbines made in China, but you will have to build storage for them, the only proven viable storage is large scale hydro, so you are back as square one.
I have a suspicion that the layer of our society responsible for management and oversight of these projects, both in government and private sectors, is much more inconpetent than that of rival nations, and maybe that's an area to explore.
The main differences in costs and time from 150 years ago are:
(A) Accounting for Extrinsic Costs. as the nations have become more dense and more democratic, peoples voices need to be heard. Environmental, wildlife habitat, etc. are complex issues that have only become important in recent decades. People sometimes get tempted by authoritarian rule because they “get shit done cheaply”, but this is a ruse. By not engaging openly, there are often massive extrinsic costs, so the project is “cheap” by cheating and not counting the true costs. Europe seems to have streamlined this, the USA is still stuck in “might over right” political power struggles rather than compromises.
(B) Cheap labor. Most infrastructure doesn’t require large numbers of high skilled labor, it needs a mix of skilled and unskilled labor. The railways in the 1800s we’re built with large quantities of immigrant labor. This is in rarer supply in the West these days, for a variety of reasons.
(C) Labor rights and safety. Construction projects and rail projects were happy to bury dead workers by the wayside (or in the concrete of the Empire State Building). Or work them to unsustainable hours with limited pay. It took many strikes, some violent, to sort this out. Today’s standards don’t put up with that level of labor abuse.
(D) Investment sources. Many large projects were state funded, or were funded by investors with a lot of patience. That kind of patience is in short supply, as is state funding in the USA due to Republicans being Republicans. Europe seems to be able to pull this kind of funding off.
(E) Contract Grift. There is a lot more incentive and skill to slow roll and milk the cash flow of construction projects, given their complexity. Traditional large works were more vertically integrated and managed by those with incentive to see the job done, rather than paid by the hour. The solution to this is more vertical integration but that’s hard to pull off because of labor shortages.
I’d also note that China has a vested interest in publishing propaganda about its engineering and public works prowess while hiding its extrinsic costs.
The basic notion is that the way non-experts think about the work has changed in ways that have drastically increased system inefficiency.
I know zip about construction megaprojects. But this is definitely true in software. Many executives want to pretend that projects are perfectly predictable, which a) diverts a lot of effort to non-value-creating outputs (fantasy plans, fantasy schedules), b) creates huge inefficiency by favoring fantasy plans over what's actually happening, and c) creates plenty of rework and chaos trying to solve the real-world problems when the gaps between fantasy and reality become too big to ignore.
To me, this problem is mainly rooted in executive culture, and is related to the phenomenon some call managerialism: https://en.wikipedia.org/wiki/Managerialism
But few have the skills to estimate what any part of nuke should cost.
https://www.orfonline.org/expert-speak/chinas-high-speed-rai...
Note that South Korea and France have nuclear cheaper than renewables still because their processes over decades have led to basically producing nuclear plants with horizontal scaling, driving costs down dramatically. In essence, all energy production within the borders of a country is a matter of political will moreso than even technical requirements. If a culture wants to push back on X and wins politically, it becomes more expensive and distorts intrinsic costs. If a culture pushes for Y and eventually subsidizes it, it becomes dramatically cheaper even below intrinsic costs and is over-consumed (see: fossil fuels)
The corruption tax on fission projects just exacerbates its structural problem.
You can build a fission reactor in five years and it will reliably power a city 24 hours a day for decades and decades. That will never be true for solar.
The west has become comically inept at hard projects. Solar is easy. Just buy panels from China. Funny that China thinks fission is the future. I guess no one told them about solar.
A similar buildout in the US would take 70 years and cost well over a trillion dollars.
Do you think China is building all those reactors for political reasons as opposed to generating reliable power 24/7 for a century?
They have clear political motivation to continue to build nuclear power plants. For example, this keeps their nuclear sector occupied and preserves the technology against deterioration. Even if civilian NPPs are not military, the overall technology has direct connection to their military (as it does in France.)
Even with that, they are installing more renewables than nuclear. And China is pushing aggressively to reduce the cost of hydrogen. They are now exporting electrolysers at < $300/kW, a fraction of the cost from elsewhere. Cheap electrolysers are a crucial technology for pairing with intermittent renewables to get to a 100% renewable grid and remove the last tenuous argument in favor of nuclear.
I seriously doubt they will build that many reactors by 2035, btw.
If realizing what a terrible bet solar and wind are is political, then yes I agree their motivation is political.
My points against solar I raised to you in another thread stand: to build the panels/batteries we need, it will create an extreme excess of carbon in the atmosphere. That's not to say we shouldn't build solar, but to pretend it can solely serve all of our collective energy needs is myopic give the constraints.
To be clear, I'm all for covering the entire planet in solar panels...after we switch our production to be powered via fission.
"What a terrible bet solar and wind are", as you claim immediately above, would be a reason not to build out solar and wind, if it were correct. But it's not, and they are.
And, it is at best naive to believe that it takes more energy to produce a solar panel than it will generate. People mining and refining silicon, cadmium, and tellurium and making solar panels out of them do not get power for free. They pay open market prices for energy, which they pass directly on to customers all down the chain to the final buyer. When your panel's production output pays off its purchase cost, its output has (much more than) exceeded the energy used to produce it.
The claim was regarding nuclear VS solar (either/or), in which case yet, solar is a terrible bet. I stand by that.
> People mining and refining silicon, cadmium, and tellurium and making solar panels out of them do not get power for free
And you say I'm being naive...
Firstly, the price of the panels doesn't even match the price of production because of subsidies.
Secondly, they do get power for free: the well-known, terrible cost of burning fossil fuels at their current scale is not incorporated into the price of fossil fuels. Capitalist markets are not capable of doing so.
So my point is if you were to actually price fossil fuels according to their cost solar panel production would not be competitive with nuclear in any way.
> When your panel's production output pays off its purchase cost, its output has (much more than) exceeded the energy used to produce it.
Sure, it can pay off its purchase cost, but as above, that means absolutely nothing. A more interesting payment would be watts-in, watts-out, in which case I'd wager you get marginal gains. And if the watts-in are generated with fossil fuels, you're doing a lot more damage than you think.
Regarding nuclear, sure it's expensive, but a lot of that is artificial, and a lot of the high comparative cost is due to the price/cost disparity in fossil fuels. And hey, as a bonus, it works at night and on cloudy days and you don't need to build an enormous battery which is another can of worms people love to gloss over.
China isn't planning to realize a majority of their power supply from solar until after 2045.
Like you, I doubt they'll hit that solar goal. Instead, they'll likely build more reactors.
Not to mention over-regulation driven by a general lack of political will. Its easier to win some votes by bashing nuclear than stand by it, even if it is the most likely alternative for baseload power in a carbon-free energy mix.
Japan's experience with sodium-sulfur batteries stands in contrast.
https://www.sandia.gov/ess-ssl/wp-content/uploads/2021/LDES/...
Na-S is less popular for new projects these days because of rapid decreases in the price of lithium batteries, but that's not a fundamental limitation of the technology — and we have no risk of running out of sodium nor sulfur.
In fairness, Japan's construction sector seems much healthier than that of the United States.
"Smashes" the energy record.
We're talking about a fusion generator here, that after 25 years of work, now manages to output 'double' the energy, to 59 MJ in 5s -like 20 MW- while requiring 180 MJ input power.
Somewhere hidden in the article is the news that this could mean a input/output ratio of 10 in a full scale reactor, but that's also something we've been waiting on for decades.
I find it easy to be enthusiastic about fusion, but the news and research surrounding it makes me sad.