Re:The Air Force is having to reverse engineer parts of its ... by dwheeler on Wednesday March 03, 2021 @06:19PM (#26336252)
I can't be certain, but I suspect the real problem was that the original contract was signed without requiring the technical data rights and/or delivery of the technical data. This is a common mistake made by the DoD, and can lead to extraordinarily high costs later.

Just look at the notice: "The deliverables will include all technical data related to the heat exchanger disassembly, all technical data related to the cores, all technical data related to the stack up, vacuum brazing, and installation of the cores on existing units. The deliverables will also include all technical data related to the tooling needed..." It's clear they don't have the technical data.

Here's how this can happen: the government asks for proposals, and the prospective contractors say "we'll create it for you for cheaper if you don't require the technical data & its related rights". The government program manager (PM) is under a lot of pressure to "get it cheaper", and this is cheaper in the short term, so the government PM agrees. The PM will be around for a few years, then leave. Later on, the contractor is the only one who can make the parts (because they're the only ones with the technical data & the technical data rights to do it). The government procurement system is all about competition, but now there is no possibility for real competition. Thus, the parts will cost 10x or more, and the government PM who approved this is long gone (probably with a promotion), and the contractor is happy with incredibly large profit margins.

I don't know if that's what happened in this case. But it's very very possible.

Re:The Air Force is having to reverse engineer parts of its ... by b-mmxx on Wednesday March 03, 2021 @06:41PM (#26336487)
This reminds me of the following:

“In my view, shared by many blue-suiters, this marvelous airplane should still be operational but, alas, that was not to be. One of the most depressing moments in the history of the Skunk Works occurred on February 5, 1970, when we received a telegram from the Pentagon ordering us to destroy all the tooling for the Blackbird. All the molds, jigs, and forty thousand detail tools were cut up for scrap and sold off at seven cents a pound. Not only didn’t the government want to pay storage costs on the tooling, but it wanted to ensure that the Blackbird never would be built again. I thought at the time that this cost-cutting decision would be deeply regretted over the years by those responsible for the national security. That decision stopped production on the whole series of Mach 3 aircraft for the remainder of this century. It was just plain dumb.”

Ben R Rich and Leo Janos. “Skunk Works: A Personal Memoir of My Years at Lockheed”.

Re:The Air Force is having to reverse engineer parts of its ... by m463 on Wednesday March 03, 2021 @07:25PM (#26336937)
My heart hurts reading that.

I felt something similar walking through Weird Stuff Warehouse and seeing old SGI workstations that I used to covet sitting on shelves for a pittance. Even if you bought them, you probably didn't have a 13w3 monitor or software to get them up. and now weird stuff is gone itself.

It's that "it's gone and can't come back" feeling.

Re:The Air Force is having to reverse engineer parts of its ... by sitkack on Thursday March 04, 2021 @07:53AM (#26341709)
https://spectrum.ieee.org/view-from-the-valley/tech-history/...

When we look backwards in time, we see lots of tributaries that dried up for various reasons. That SGI workstation is still in your head, it is really up to us to copy and extend those concepts forwards in time.

That software is still sitting on a box of junk in someones basement somewhere, it just has to be found.

Re:The Air Force is having to reverse engineer parts of its ... by HeyLaughingBoy on Thursday March 04, 2021 @08:36PM (#26351307)
That software is sitting in an SGI in my basement :-)
Re:The Air Force is having to reverse engineer parts of its ... by m463 on Thursday March 04, 2021 @01:50PM (#26346471)
That's a sad one too. it's hard to quantify the loss of an ecosystem.
Re:The Air Force is having to reverse engineer parts of its ... by xtiansimon on Thursday March 04, 2021 @03:46PM (#26348045)
Old SGI workstations and the things people make with them....I loved the surplus you could buy in the Vally in the early 90s.

https://www.youtube.com/watch?v=NPvIs0I-gmg

Re:The Air Force is having to reverse engineer parts of its ... by dublin on Thursday March 04, 2021 @05:43PM (#26349550)
I don't understand this. I worked on the B-2 back in 1987-88, and two things about that program don't add up to having to reverse engineer anything.

First, the B-2 was the first large, complex product in history to be entirely developed digitally. Everything. was in CAD, and only the CAD geometry was authoritative. All drawings printed out were VERY clearly marked warning of this. IIRC, most of this was in Catia, so it should still be possible to read and use that data.

Second, if there's one thing Defense procurement Is good at, it's configuration management. This is doubly true of black programs like the B2, where not only do you want to make sure you never lose data or docs, but also that no bad guys ever have a way to get that data.

Either something went badly off the rails somewhere, or someone needs to rebuild something without the proper clearance. Otherwise, this makes no sense. BTW, the combo of the first complex CAD-only product multiplied by the hideous costs of any black program were largely responsible for the B-2's exorbitant costs.

Congress was stupid to cut B-2 production numbers, though, because the lion's share was fixed, sunk cost that remained the same regardless of whether one or a hundred airplanes were actually built.

(I think I've posted here before about how we spent many millions of dollars to develop a method to repair a major composite part in place. That part was pretty much what you started with when you put the airplane together, so even that was way cheaper than disassembling and reassembling the entire airplane!)

Re:The Air Force is having to reverse engineer parts of its ... by Spooky23 on Thursday March 04, 2021 @08:11AM (#26341869)
It’s risk reduction.

That was an innovative plane and the reality is that nobody is going to wake up and build it again once production stops. Once you break up a team, the team is gone — that’s why we always build submarines, even if unnecessary. You have to keep the people and plant working.

That tooling was going to be compromised and useful to the Soviets or some other adversary. There is a well established record of traitors selling plans or materials to the KGB/FSB/Chinese intelligence that have been caught. Also, from a PR perspective, a headline like “Air Force spends $50M/year to guard stealth bomber tooling untouched in 30 years” isn’t great either.

Re:The Air Force is having to reverse engineer parts of its ... by double0jimb0 on Thursday March 04, 2021 @12:13PM (#26345057)
This was talking about destroying the physical tooling. Ain’t nobody sneaking 60,000 tools out the back door to the Soviets. Many/most of those tools are going to weigh many tons, would require rigging to lift and flatbeds to move. Could they easily sneak out tooling drawings and schematics? yes probably could and did. But not the physical tools themselves.
Re:The Air Force is having to reverse engineer parts of its ... by jn1234 on Thursday March 04, 2021 @12:25PM (#26345203)
It was also keeping the manufacturing process and technologies, specifically stealth secret.
Re:The Air Force is having to reverse engineer parts of its ... by ecpottinger on Wednesday March 03, 2021 @09:02PM (#26337678)
The same was done the Canadian Avro Arrow plane, and the British Black Knight rocket. What happens once you join government, they take away your brains?
Re:The Air Force is having to reverse engineer parts of its ... by neuronic on Thursday March 04, 2021 @03:13AM (#26339962)
The government doesn't have consistent communication between and even within departments, that's all really. There is no holistic understanding of things, it's just a conglomerate of BoundedContexts without good interfaces to talk to each other.

I mean if instead of discussing a topic freely on HN you were supposed to share your information using some I-1969 standard form with sections of one word answers, how many compelling and sensible posts would we usually see.

Re:The Air Force is having to reverse engineer parts of its ... by ckozlowski on Thursday March 04, 2021 @01:17AM (#26339237)
F-14 as well. In all of those cases, it was decided that the cost to secure and account for the tooling to prevent them from falling into the wrong hands was more than they wanted to spend.
Re:The Air Force is having to reverse engineer parts of its ... by eru on Thursday March 04, 2021 @07:58AM (#26341752)
How smart people behave depends a lot of context and incentives.

Many people are reasonable shrewd with their own money, and about stuff that directly impacts them. But people in charge of government organisations often have very different incentives and concerns.

(Other big organisations in the private sector can also go haywire. Especially when the threat from competition is low.)

Compare https://en.wikipedia.org/wiki/Public_choice

Re:The Air Force is having to reverse engineer parts of its ... by Naga on Thursday March 04, 2021 @05:55AM (#26340934)
The Avro Arrow being destroyed is a meme in Canada, but there's a lot of questions at least in the historical community on whether that was a blessing in disguise. The state of the art was rapidly moving away from bombers coming over the North Pole (which an interceptor like the Avro Arrow) which would have rendered a fleet of Arrows expensive and useless.

That being said, it destroyed a large part of the Canadian aeronautical industry since Avro ceased operations soon after and the well trained workforce was scattered to the States. There's a long history of Canadian governments doing shortsighted things like killing industries and then paying out of the nose to try to restart the industry every generation/ See shipbuilding in Canada and how Canada can't build ships for its own navy now, despite being one of the largest shipbuilders in the world in the early 20th century.

Re:The Air Force is having to reverse engineer parts of its ... by monkeybutton on Thursday March 04, 2021 @11:07AM (#26344139)
With a globalized economy, does it make sense for every country to have a manufacturing base for every industry? Especially for a country with small/moderately sized population like Canada?

I agree though, the government has been short sighted and procurement of ships, planes has been a debacle for years. It seems that either way a lot of money is going to be burnt, either by propping up a non-competitive industry locally, or burnt buying something insanely expensive like F-35s from an ally.

Re:The Air Force is having to reverse engineer parts of its ... by R0b0t1 on Thursday March 04, 2021 @12:40PM (#26345406)
For critical defense needs, likely. If you can't meet those needs you are beholden to the people who can, and they may not have your best interests in mind.
Re:The Air Force is having to reverse engineer parts of its ... by justin66 on Thursday March 04, 2021 @12:14PM (#26345067)
The Avro Arrow and Black Knight were just prototypes whose movement into production could only be justified for nationalistic reasons. They did not have a proven track record or offer cost savings. They aren’t comparable to the blackbird at all, and destroying their tooling isn’t comparable either.
Re:The Air Force is having to reverse engineer parts of its ... by Mauricebranagh on Thursday March 04, 2021 @05:13AM (#26340683)
I remember a trip from school in the late 70's to Cranfield university and they had a TSR2 airframe sitting sadly at the back of one of the hangers.
Re:The Air Force is having to reverse engineer parts of its ... by rvba on Thursday March 04, 2021 @03:57AM (#26340218)
Probably someone was bribed by KGB to do it.
Re:The Air Force is having to reverse engineer parts of its ... by throwanem on Thursday March 04, 2021 @05:16AM (#26340700)
Robert McNamara as a deep-cover KGB "illegal", there's an 80s espionage potboiler I'd love to read. I'm honestly a little surprised no one actually wrote it.
Re:The Air Force is having to reverse engineer parts of its ... by mikmeh on Friday March 05, 2021 @12:20PM (#26359299)
Reading the article I immediately thought of the blackbird and wondered if it had suffered a similar fate.
Re:The Air Force is having to reverse engineer parts of its ... by alliao on Wednesday March 03, 2021 @06:49PM (#26336566)
China didn't steal a copy did they? Ah got the dates wrong.
Re:The Air Force is having to reverse engineer parts of its ... by booi on Wednesday March 03, 2021 @07:23PM (#26336918)
That would be great because then you could just order the parts on Alibaba
Re:The Air Force is having to reverse engineer parts of its ... by anigbrowl on Thursday March 04, 2021 @04:12AM (#26340304)
Pls
Re:The Air Force is having to reverse engineer parts of its ... by slim on Thursday March 04, 2021 @01:37AM (#26339343)
s/China/URSS/
Re:The Air Force is having to reverse engineer parts of its ... by stratosgear on Thursday March 04, 2021 @02:17AM (#26339611)
s/URSS/USSR/
Re:The Air Force is having to reverse engineer parts of its ... by cpach on Thursday March 04, 2021 @02:54AM (#26339841)
Re:The Air Force is having to reverse engineer parts of its ... by HPsquared on Thursday March 04, 2021 @05:14AM (#26340689)
Ah, the famous opponent of OTAN...
Re:The Air Force is having to reverse engineer parts of its ... by richrichardsson on Thursday March 04, 2021 @03:32AM (#26340077)
s/USSR/CCCP

I think this is why people like to refer to the Communinist Party of China (CPC [1]) as the CCP, because it evokes memories of the Soviet Union.

[1] cpc.people.com.cn

Re:The Air Force is having to reverse engineer parts of its ... by lorenzhs on Thursday March 04, 2021 @04:03PM (#26348280)
s/CCCP/СССР/ - Latin C and Cyrillic С (and P/Р) are different unicode characters, see also https://en.wikipedia.org/wiki/IDN_homograph_attack ;)
Re:The Air Force is having to reverse engineer parts of its ... by numpad0 on Thursday March 04, 2021 @09:00AM (#26342491)
SSSR
Re:The Air Force is having to reverse engineer parts of its ... by h0l0cube on Wednesday March 03, 2021 @07:14PM (#26336825)
> The government program manager (PM) is under a lot of pressure to "get it cheaper"

And let me guess, the 'pressure' comes from government decision makers that live in a perpetual revolving door with industry?

https://en.wikipedia.org/wiki/Revolving_door_(politics)

Re:The Air Force is having to reverse engineer parts of its ... by dwheeler on Wednesday March 03, 2021 @08:44PM (#26337536)
While the revolving door is always a potential issue, and I'm sure it happens, I don't think that's a key problem for the DoD. When government officials leave office they're required to not do work, for a period of time, on things they controlled, and the penalties can be steep. That reduces incentives for the worst of abuses. Also: a US government employee who retires after 20+ years has a guaranteed pension; it's nice to get more on top, but not by risking it.

No, I think the pressure primarily comes from the DoD procurement process itself. First, you have to develop the requirements. The Air Force wants a plane, the Navy wants a plane, the Army wants a plane. If you say "yes" to one & "no" the others you get a political battle. A bright person says, "I know, we'll make a plane for everyone, and the volume purchase will make it cheaper!" "Great!" everyone says. They each bring in their laundry lists of what they want the plane to do... if you say "no", then they probably won't fund it, so you have this HUGE list of requirements. Now the plane (or whatever) has to do everything.

Then it goes out for bid. Only the lowest bid will win, so contractors will do their best to make it a low price for a massive number of requirements. They're under great pressure to underbid the real costs, and when you do new things it's usually more expensive than you imagine. Yet those costs will still look eye-wateringly big (because it's trying to do everything). Contractors will then say "don't require that 'bunch of useless technical data and those technical data rights... it'll be cheaper!". In addition, every time you learn something, you'll need to make a change, and that will result in a change request with a remarkably high price tag. That's partly because the contractors are motivated by profit, but to be fair, they were often pressured into unrealistically low starting costs by the process.

Many of the DoD's problems aren't from "evil government officials" or "evil contractors". Many really are trying to do good things. Sometimes the problem is that the DoD procurement process has some perverse incentives that sometimes results in very strange outcomes.

Re:The Air Force is having to reverse engineer parts of its ... by neurotech1 on Thursday March 04, 2021 @02:43AM (#26339777)
The whole "Has to do everything to get funded" type problem, was very apparent with the Army's Bradley Fighting Vehicle[0]. The result was so misguided, if not comically bad, they made a movie about it, Pentagon Wars[1]

[0] https://en.wikipedia.org/wiki/Bradley_Fighting_Vehicle

[1] https://en.wikipedia.org/wiki/The_Pentagon_Wars

Re:The Air Force is having to reverse engineer parts of its ... by dwheeler on Thursday March 04, 2021 @02:34PM (#26347088)
The "has to do everything to get funded" is definitely not a new problem, it's structural.

"The Best of the Journal of Irreproducible Results" (January 1, 1983) includes an article by William R. (Randy) Simpson about Murphy's Law, where he notes in a haha-only-serious way the many predictable problems that happen because of it. It's not online as far as I can tell, but the book can be purchased: https://www.amazon.com/Best-Journal-Irreproducible-Results/d...

Re:The Air Force is having to reverse engineer parts of its ... by h0l0cube on Wednesday March 03, 2021 @09:03PM (#26337681)
Seems like if the US govt. can have a policy that disrupts the revolving door, they could also institute a policy that all tenders require the perpetual rights to technical data? Especially if this is a problem that even outsiders are aware of. So I wonder what's stopping such obvious and sensible policy from being enacted?

Edit:

I'll answer my own rhetorical question: because budget forecast time periods are aligned with election cycles.

Re:The Air Force is having to reverse engineer parts of its ... by dwheeler on Wednesday March 03, 2021 @10:38PM (#26338329)
> Seems like if the US govt. can have a policy that disrupts the revolving door, they could also institute a policy that all tenders require the perpetual rights to technical data? Especially if this is a problem that even outsiders are aware of. So I wonder what's stopping such obvious and sensible policy from being enacted?

I don't think that policy (as written) would make sense for commercially-sold components (which were developed by the company without government funds and are being sold to the general public). Also, I think there are special cases where requiring the technical data isn't warranted. But I agree that policies could be greatly improved.

I think it would be appropriate to require technical data and technical data rights for all custom components by default (e.g., where the government funded part or a majority of its development). Waivers would be allowed, but only after being personally approved by a Secretary or Department CIO. That would provide some actual oversight; if program managers can approve making themselves look good, by lowering short-term costs (while increasing long-term costs after those PMs are gone), the rule will have no teeth. But government personnel want maximum flexibility, and while the current policies increase long-term costs, the policies also make it possible to get promoted when people are asked to do lots with relatively little money. So many government personnel are not very interested in that kind of policy.

A bigger problem is that contractors like it when their customer is stuck in an endless monopoly. Some contractors have been waging a long term effort to keep the gravy train going, and talk endlessly about the DoD "stealing our (contractor) data rights". The "stealing" they're talking about is allowing the DoD to receive the data that the DoD paid to have developed (!). Many contractors think they should have an exclusive right to the things they created using the government's money (and thus took little risk to create). For an example of this kind of absurd thinking, see: https://govcon.mofo.com/cybersecurity-and-data-privacy/break... Don't get me wrong, some contractors are actually quite reasonable, and the DoD cannot be successful without contractors. But contractors have a lot of incentive to gain exclusive rights over what they were paid to develop, and that's a huge incentives problem.

At least one past Secretary of Defense has tried to get more data rights through contracts, but it's very much an uphill battle.

There are some efforts to get more technical data rights in the future. I don't know what their status is, but my understanding is that they are minor nudges towards the government getting more rights to what the DoD pays for. These minor changes are considered by some contractors as the apocalypse, which should make it clear why big policy changes are hard. Here's some information on what was proposed, I don't know what has happened to it (I don't pay as much attention to this stuff as I used to): https://www.jdsupra.com/legalnews/dod-s-new-ip-rules-may-imp... I think these are at best small half-hearted measures to deal with a serious problem.

Re:The Air Force is having to reverse engineer parts of its ... by h0l0cube on Wednesday March 03, 2021 @11:53PM (#26338776)
Thank you for the insightful reply with actual domain knowledge. Here's hoping reform wins out in the longer term. I think there's renewed focus on military spending these days, and this seems like an easy win if the administration is determined and competent enough.
Re:The Air Force is having to reverse engineer parts of its ... by Spooky23 on Thursday March 04, 2021 @08:26AM (#26342038)
Because it isn’t obvious and sensible.

The whole point of hiring a contractor to sell a product is that the contractor is that it brings its own intellectual property to the table and “owns” the project.

Work performed as work for hire for the US government is public domain (subject to security restrictions). For some military products, the government “owns” the product. For example, artillery/naval gun tubes are manufactured by the Federally owned Watervliet Arsenal in New York, operated by a contractor.

The government owns other facilities relating to nuclear and chemical weapons that I’m aware of, and I’m not sure there is a material difference in competence related to the government “owning” all information.

Re:The Air Force is having to reverse engineer parts of its ... by nradov on Wednesday March 03, 2021 @09:58PM (#26338085)
Just having the technical data doesn't ensure that another contractor can actually build compatible parts.
Re:The Air Force is having to reverse engineer parts of its ... by mixologic on Wednesday March 03, 2021 @10:07PM (#26338140)
It's probably a whole lot better than getting a contractor to reverse engineer the technical data and then building the compatible parts.
Re:The Air Force is having to reverse engineer parts of its ... by kevin_thibedeau on Wednesday March 03, 2021 @08:16PM (#26337340)
Mostly the CEOs who want to get their third home.
Re:The Air Force is having to reverse engineer parts of its ... by totalZero on Wednesday March 03, 2021 @09:53PM (#26338045)
It's also the fact that they are likely to retire before any possible consequences arise.
Re:The Air Force is having to reverse engineer parts of its ... by dreamcompiler on Thursday March 04, 2021 @01:16AM (#26339233)
It's also possible the government did get all the technical data and then lost it. It has to be somebody's job to archive and catalog that stuff, and the cost of archiving comes out of somebody's budget. The pressure to just toss old dusty paper files to cut costs can be enormous. It might have happened because "Joe Smith was the archivist and he retired 10 years ago and we needed the space."

If the data was classified (very likely) it costs a lot more to store it and audit it, and the pressure to "just burn it" is that much greater.

Re:The Air Force is having to reverse engineer parts of its ... by angry_octet on Thursday March 04, 2021 @03:39AM (#26340122)
This is extremely implausible. Files (the non descript name for official records) are extremely hard to destroy even if you want to. Everything about the B2 is in a special TS compartment and will likely be retained until long after we are dust.
Re:The Air Force is having to reverse engineer parts of its ... by vertis on Thursday March 04, 2021 @05:52AM (#26340911)
Slightly off-topic:

A few years ago I wanted to renovate an apartment. I dutifully applied for the plans from the local council. Only to be told they no longer existed.

I had this, "Well then, it was always like that" moment.

Didn't end up knocking out the wall, for other reasons, but if the plans no longer existed who was to argue that it wasn't always like that.

Re:The Air Force is having to reverse engineer parts of its ... by dublin on Thursday March 04, 2021 @05:49PM (#26349612)
Configuration management, especially for black projects, is the one thing you can count on from the DoD and its contractors just as surely as taxes and waste.
Re:The Air Force is having to reverse engineer parts of its ... by hef19898 on Thursday March 04, 2021 @02:07AM (#26339535)
Yeah, very well might be. Usually so, these contracts include decades worth of spares. Things usually turn ugly when this period runs out, yet 25 years after delivery seems a bit short.

Nice tid bit for the B-52. These old birds, old in the sense of designed pre CAD, are quite hard to understand for modern manufacturing. Even manufacturers rely on retires sometimes to understand these old drawings for their own planes. Then again, the B-2 shouldn't fall in that category.

I suspect that people in the armed forces, at least some, understand maintenance but have no idea of manufacturing. A couple of years ago I had spontaneous "workshop" session where we discussed how we could leverage BoMs and data collected during production and assembly from the manufacturer for version and build tracking of military hardware. I used to work for that manufacturer in question, so I knew what data they collected during production. The only we would have had to figure out was which BoM to use. That was immediately shot down by middle management, because it would cost 10s of millions to get the rights for that data. Nevermind that it was there from day one, even in SAP so our client wouldn't even had issues with compatibility.

And none of the people I had these discussions with had any idea how BoMs and such are used. In these environments it is quite easy for crucial knowledge, especially of highly specialised parts and processes, to be lost.

Re:The Air Force is having to reverse engineer parts of its ... by dublin on Thursday March 04, 2021 @06:04PM (#26349760)
You entire comment is monstrous bigotry of the modern. The B-2 was in fact the first large, complex product ever built entirely from a CAD database - a factor in its huge cost.

As a CIM Manager for a major B-2 subcontractor, I can assure you they knew what they were doing. Yes, even 30-35 years ago. Yes, they knew as much or more then than we know today about BOMs, manufacturing, CAD, digital records and archiving, documentation and configuration management, and everything else. (BOMs weren't in SAP, but they were in mainframe DBs, ERP systems, and CAD systems, some of which are still sold and used today.) I have literally never worked on any other program in my entire career that was as well-run and orchestrated overall as the B-2 program. (We called it ADP-101 at the time, and for the first few years, we didn't even know what we were working on!)

Re:The Air Force is having to reverse engineer parts of its ... by Jtsummers on Wednesday March 03, 2021 @06:23PM (#26336287)
I wouldn't be surprised. It has happened with a lot of different acquisition programs. That was actually one of my first thoughts on reading the article, as I know people who've had to do this kind of reverse engineering for other aircraft due to a lack of tech data in the initial contract and refusal of USAF to purchase it later.
Re:The Air Force is having to reverse engineer parts of its ... by low_key on Thursday March 04, 2021 @09:41AM (#26343006)
There's a similar problem to the "we'll create it cheaper if" issue in a lot of government software acquisition. Contractors, especially big companies, often want a lot more money to hand over source code for software. Often the government takes the short-term discount, but then ends up paying massively over time by having no ability to maintain or upgrade the system without involvement from the same contractor.
Re:The Air Force is having to reverse engineer parts of its ... by fbelzile on Wednesday March 03, 2021 @10:58PM (#26338441)
Here in Canada, our air force takes out airworthy parts from planes, like emergency locator transmitter (ELT) batteries, before they're sent to museums. They have a stash of plane parts in a hangar somewhere for cases just like this.
Re:The Air Force is having to reverse engineer parts of its ... by tonyedgecombe on Thursday March 04, 2021 @05:04AM (#26340638)
During the Falklands war the RAF had to raid museum's planes for parts for their Vulcan bombers.
Re:The Air Force is having to reverse engineer parts of its ... by suifbwish on Wednesday March 03, 2021 @08:43PM (#26337529)
Why is it legal to do this? I don’t pay taxes so a bunch of morons can waste it on a consulting company trick
Re:The Air Force is having to reverse engineer parts of its ... by oconnor663 on Wednesday March 03, 2021 @09:22PM (#26337826)
There are lots of different types of projects. Sometimes you're asking people to invent things for you, and you're the only conceivable customer for that thing, and (like here) it would be weird and perverse not to require all the data/specs/whatever for that thing. Other times you're buying something that's already been invented, with many existing customers, and the data/specs/whatever for that product line are worth much more than the units you actually want to buy, and it wouldn't make any sense to have to buy out that entire product line just to use the product. It might be hard to make simple rules that distinguish between these cases, and all the gray areas in between.
Re:The Air Force is having to reverse engineer parts of its ... by ric2b on Thursday March 04, 2021 @11:30AM (#26344472)
It would at least make sense for it to be mandatory for any vehicles or weapons used by the DoD, no?
Re:The Air Force is having to reverse engineer parts of its ... by 1MachineElf on Thursday March 04, 2021 @11:48AM (#26344728)
I wonder if doing so would create a barrier to entry for the annual billions of $ of defense equipment the US sells to Saudi Arabia. For example, what if Saudi Arabia considers it a risk if another government has the technical plans? If that were the case, I expect defense contractors would be adverse to divulging those details.
Re:The Air Force is having to reverse engineer parts of its ... by suifbwish on Friday March 05, 2021 @03:03PM (#26361358)
And if the contractor were located in Australia or China the government could legally mandate the defense contractors give them access to the code
Re:The Air Force is having to reverse engineer parts of its ... by dublin on Thursday March 04, 2021 @06:05PM (#26349777)
Keeping things is NOT free, especially for physical things like tooling/fixtures/equipment. It actually costs a surprising amount of money.
Re:The Air Force is having to reverse engineer parts of its ... by dpierce9 on Wednesday March 03, 2021 @07:07PM (#26336755)
Definitely a real live possibility. It could also just be lost. Probably physical copies, tons of turnover over many years and sites. This seems less likely but there is a perverse incentive not to admit it is lost unless required by law.
Re:The Air Force is having to reverse engineer parts of its ... by ReedJessen on Wednesday March 03, 2021 @08:10PM (#26337297)
I very much suspect this is the case in this instance.
Re:The Air Force is having to reverse engineer parts of its ... by 8note on Thursday March 04, 2021 @01:47AM (#26339405)
How is that not a national security threat?