The 947 GW is the total proposed capacity for solar projects that are in various planning stages. They have not been built yet, and most of them will never be built -- historically only about 14% of proposed capacity ends up entering service [1].
This isn't to say that it's not important to invest in the grid to handle future needs. But it's not like there's a bunch of renewable energy just sitting there idle.
so nuclear wouldn't affect those 14%
If most power generation is blocked by a lack of connectivity to the grid then it would stand to reason that most projects are abandoned or fail as they've no path to entering service (unless I've misunderstood).
I read the first comment quite literally. That there is over 900 GW of power that currently exists but just needs to be “hooked up”. i.e. a solar farm that is built, but through some bureaucracy there’s no line running from it to the grid.
With the context of the reply, that is not the case. Most of the cited 900GW isn’t even built yet. This seems like an important distinction when considering the scope of work needing to be done.
What went up 30% is what they call Scope 3 (indirect emissions from suppliers, transport, construction and customers):
"Indirect emissions from all other activities up and down the value chain such as upstream and downstream transportation, materials, and end-of- life impacts, as well as all suppliers’ direct Scope 1 and 2 emissions.
Scope 3 represents over 96% of Microsoft’s annual emissions in FY23. Our Scope 3 emissions result primarily from the operations of our tens of thousands of suppliers (upstream) and the use of our products across millions of our customers (downstream).
Tackling Scope 3 means decarbonizing industrial processes such as steel, concrete, and other building material production for use in our campus and datacenter construction, as well as jet fuel for business travel and logistics."
Full report PDF: https://query.prod.cms.rt.microsoft.com/cms/api/am/binary/RW...
That would only mean that this renewable energy would no longer be available for other uses. Like, for instance, replacing or reducing the use of fossil fuels.
Seems more likely to me that the utilities are expecting a large growth in consumption in the coming years and built out capacity ahead of time. Seems reasonable.
> The vast majority comes from Scope 3 (96%), which includes the supply chain, data centers, and "the use of our products across millions of our customers."
> Yet the data centers remain an issue with no easy answer. The race to secure them is in full swing, and it would take years to switch them to renewable energy, experts tell PCMag.
What stops training AI's during sunlight hours only and hibernating as power decreases?
I assume that most cloud venders are over-provisioning because their margins are so good that they'd rather overspend on inventory than miss out on revenue most of the time.
It's not inconceivable that there's an answer that meets needs based on only running the most energy consuming operations during daylight and migrating those operations about the globe during sunlight hours while having less demand operations run at night.
There's a real issue that needs addressing surrounding ever increasing global emissions, giving lip service while continuing to increase emission related activity is double think.
This is not the case. As long as electricity is fungible on the grid, and there's some fossil electricity production close enough for transmission, changes in renewable electricity use mean increases/decreases in fossil electricity use at the margin.
The US currently has 947 GW of renewable generation capacity that is not hooked up to the grid [1]. To put that number into perspective, the US currently has 1160 GW of generation capacity in total [2]. We could almost double our countries generation capacity if we could just hook up the power to the grid.
Unfortunately it takes 10 years to build new transmission lines in the US [3]. Changes are going to need to be made to the permitting process, which may include giving more responsibility and agency to FERC to oversee the review process.
Congress needs to act on this. If you care about this, you can educate your self and get involved. https://community.citizensclimate.org/topics/clean-energy-pe...
[1] https://emp.lbl.gov/utility-scale-solar
[2] https://www.eia.gov/energyexplained/electricity/electricity-...
[3] https://yaleclimateconnections.org/2022/10/permitting-americ...