I should add that meaningful advances have been made in nuclear power station design. But unfortunately these advances can't withstand other problems e.g. Russia putting operational power stations at risk as they invade Ukraine.
For nuclear this inflexibility comes from pure economics. It is economic suicide to build a new plant and operate it at 100%, now try operating it at less than 50% on average.
SMR are not looking that hot either, looks like the prevalent truth from the 70 years of nuclear construction: that bigger is better due to the large fixed costs, stays true even in 2023.
https://www.wired.com/story/the-dream-of-mini-nuclear-plants...
Dimensioning of Olkiluoto 3 is unrelated to Finnish regulation, the reactor was designed by France and Germany based on economies of scales, not specifically for a local project.
I still remember when Olkiluoto 3 was approved, the Green party left the government out of protest. And in 2014 they threatened to leave the government again if they approve some change in another plant's permit. That's the level of ideological opposition we're talking about.
Luckily, the tide is turning, but it's highly annoying that this needs to be an issue.
EPR's debacle is good example here.
Meanwhile, Koreans have been steadily building new plants without giant cost overruns and delays.
And in the West they never enjoyed economies of scale either. France's nuclear plants kept getting more expensive, even in the heyday when they were building lots of them.
On the other hand you can offload most of your cost to customers if you just stop providing electricity.
The point of stable power generation system is not to haggle over 10% more or less, it's to stop price graphs looking like that: https://i.imgur.com/iJslMUa.png
Periodical gigantic deficiencies in case of just bad weather in December are much higher problem than relatively small costs spread over decades.
> The costs of the French nuclear scale-up: A case of negative learning by doing
https://www.sciencedirect.com/science/article/abs/pii/S03014...
Meanwhile in South Korea, is this the method you propose to get "cheap nuclear"?
> In November 2012 it was discovered that over 5,000 small components used in five reactors at Yeonggwang Nuclear Power Plant had not been properly certified; eight suppliers had faked 60 warranties for the parts. Two reactors were shut down for component replacement, which was likely to cause power shortages in South Korea during the winter.[25] Reuters reported this as South Korea's worst nuclear crisis, highlighting a lack of transparency on nuclear safety and the dual roles of South Korea's nuclear regulators on supervision and promotion.[26] This incident followed the prosecution of five senior engineers for the coverup of a serious loss of power and cooling incident at Kori Nuclear Power Plant, which was subsequently graded at INES level 2.[25][27]
> In 2013, there was a scandal involving the use of counterfeit parts in nuclear plants and faked quality assurance certificates. In June 2013 Kori 2 and Shin Wolsong 1 were shut down, and Kori 1 and Shin Wolsong 2 ordered to remain offline, until safety-related control cabling with forged safety certificates is replaced.[28] Control cabling in the first APR-1400s under construction had to be replaced delaying construction by up to a year.[29] In October 2013 about 100 people were indicted for falsifying safety documents, including a former chief executive of Korea Hydro & Nuclear Power and a vice-president of Korea Electric Power Corporation.[30]
https://en.wikipedia.org/wiki/Nuclear_power_in_South_Korea#H...