I bet HN wouldn't do a 10 hours high-risk operation for moving their servers because they can't afford an outage. (But well, running stuff on a single bare-metal server is expensive enough that even if they could, I expect they don't.)
What would that company do if a pipe broke inside the datacenter? Besides, if you never restart your servers, you are guaranteeing that the one time when the power goes off on the entire city, they won't come back online.
HN is probably not business-critical and could probably affort a 10 hour downtime without much hassle.
While I don’t think they informed them of this in good-faith, it is a nice heads-up. In this case, it meant Consultant2 consulting RefusingConsultant that probably knew the IT better.
I hope there wouldn't be a correlation, but I wouldn't be all that surprised if a somewhat loose one was found.
Though it was likely easier to find than that Novell Netware server that was sealed behind some drywall, with only a stray network cable leaving any clue as to where it was.
I once only half jokingly suggested finding a missing data closet in a two million square foot distribution center by pinging a known IP from three or four aggregator switches across the building and triangulating the location on a floor plan. Sadly the people crawling around the ceiling found it before I could put my idea into practice.
Good job they found it!
Turns out a door was closed and a new one built to a hallway to another hallway and not properly labeled on the updated drawings. Had one of the boxes running a conveyor belt not have died, we'd never have looked.
Also, that doesn't cover other problems mentioned here, like natural disasters, ISP problems, etc.
Also cost does come in play as well. Multiple physical links in would be very expensive for what sounds like internal services. Likewise a natural disaster might cause bigger issues to the company than those internal services going down. They might still have offsite back ups (I'd hope they would!) so at least they can recover the services but the cost of having a live redundancy system off site might not justify those risk factors.
The customers requires are definitely unreasonable though. I'd hope those systems are regularly patched, in which case when is downtime for that scheduled and why is that acceptable but not when you're physically moving the server? I doesn't really make much sense; but then "not making much sense" also quite a common problem when providing IT services for others.
In general, we don't know much about this case. It's a post on Reddit, might not even be true. As is, it doesn't make much sense, but we don't know all the details, so maybe we jumped to conclusions.
Mainframe is not just a server. You can hot plug RAM on these things.
Single server and "can't tolerate any downtime" are mutually exclusive.
I've came across old AWS account (startup have been using AWS for the longest). All the network traffic or VPN goes through a single instance with 3 years of uptime.
If a function is super critical to business, it also deserves to have some thought put into the blast radius of its failure.
The sort of places that would insist on rolling a live server 700 ft across a parking lot probably don't have any real disaster recovery plan.
There's SMART for disks... what else?
HN also has downtime fairly often.
In the past power supplies and spinning disc hard drives would fail much more often.
It’s basically a solved problem, outside of extremely mission critical, 5 nines kind of stuff, that we all forgot because of AWS.
HN ran, and may still run, on a single bare metal server.