The main gripe people and authorities have with what happened is that key infrastructures immediately lost power. When (only) 5% of demand is turned off this should not impact railways, airports, and hospitals.
Beyond the initial loss of power other problems amplified the consequences: For example, trains could not just restart but required specialist staff to attend each of them to get them through a specific procedure, which turned a short power loss into hours of delays.
This highlights the importance of looking at systems globally. The grid is just one part of the system.
* the railways didn't have traction power disconnected -- but one type of (new) train saw the within-specification frequency drop, shut down, and in many cases needed a fitter to go out and restart it. Everything else behind a dead train was stuck. I imagine the train company are discussing this with their supplier...
* Ipswich hospital had a power outage, but that was because their own systems disconnected from the grid when they saw the frequency drop, and then they had a problem with one of their generators.
*One regional airport seems to have been accidentally not on the list of key sites not to disconnect -- sounds like an admin snafu, and has now been fixed.
None of these seem like "bad management" -- they are a collection of relatively minor, entirely unrelated, problems of the sort you're likely to run into if you have to activate an emergency procedure you haven't needed to use in a decade.
This is why a comprehensive investigation is needed to ensure the details are known and all lessons learned or, unfortunately, re-learned.
The trains were built to a environmental tolerance spec, and shutting down when that spec is exceeded seems like a reasonable thing to do. Having an expert test that all the safety systems are still working properly after they've been exposed to conditions they weren't designed for also seems prudent.
Do you think people should pay higher ticket prices / more tax to fund trains that can tolerate a wider range of input frequencies, given how rarely these sorts of events happen?
Yes, they were built to a spec. According to the official technical report[1] these trains DID NOT experience anything outside that spec. The shut down was not supposed to occur. The trains are simply defective and both manufacturer and operator testing failed to reveal these defects. There is no other reasonable conclusion. Defective, inadequately tested trains.
> Having an expert test that all the safety systems are still working properly after they've been exposed to conditions they weren't designed for also seems prudent.
This bit of guesswork is also contradicted in the official report as the manufacturer has committed to providing a system update to permit operation to resume WITHOUT any of your supposed 'prudence.' Resuming operation on power recovery without intervention by technicians is the specified, expected behavior. This is a separate defect that also survived whatever obviously inadequate testing regime was supposedly in effect.
> Do you think people should pay higher ticket prices / more tax to fund trains that can tolerate a wider range of input frequencies, given how rarely these sorts of events happen?
Since the official conclusion and subsequent response by the manufacturer both show the trains were specified to tolerate these conditions the extraordinary costs you imagine are a fiction; the cost has already been paid. No higher ticket prices required. And since these conditions were specified we also know they were indeed anticipated despite their infrequency.
Both the manufacturer and the operator failed here. They got caught with their pants down. You may not like hearing that for whatever reason but that's the bottom line and inventing excuses won't change it.
Similarly, the grid's license gives them a ±1% variation around 50Hz (so ±0.5Hz from https://www.nationalgrideso.com/balancing-services/frequency...).
So we have a power anomaly where the frequency moved >0.125Hz/s and dropped well below the 49.5Hz license threshold. I don't know what the procurement spec was, but I'd be very surprised if this event was "in-spec" for the trains, so in the absence if this it's probably reasonable to say that GP is incorrect.
Transformers get quite unhappily melty if you drop the frequency too much, so if your cooling system isn't designed to cope with this, it's probably better to shut down than have an exciting fire.
* Wider tolerance means heavier electrical and cooling systems, increasing both capital outlay and operating cost for both track wear and maintenance.
* The trains procured were essentially "off the shelf" from Siemens and would have been designed and manufactured for other operators before the DfT put the tender together. A wider operating tolerance would have therefore either ruled out the Siemens trains, or at least significantly upped the cost as they would have had to redesign them.
An annual season ticket from St Albans to London is about £3,600. How much more should that passenger (as well as the taxpayer) be paying so that they can travel on trains that work when this type of event happens? How often does this type of event happen?
> This is utterly inexcusable for a train given the amount of disruption caused by multiple lines being clogged by failed trains in multiple places.
People being stuck on trains for a few hours is pretty far down the severity list of "things that could go wrong" when the power goes out. That said, what I do think the outcome will be here is they'll figure out if/how the driver can self-reset this type of issue rather than requiring a fitter to travel out.
This is why I am very surprised when I read that hospitals generators failing to take over is just "one of those things".
It's like the 'old' saying that you don't have backups until you test recovery from backups...
> None of these seem like "bad management"
They do seem like bad management because to me it looks like these issues were not taken seriously.
> problems of the sort you're likely to run into if you have to activate an emergency procedure you haven't needed to use in a decade.
That's bad management right there if an organisation's emergency procedure has been collecting dust for a decade.
But not bad management by the Grid.
But in general a worrying aspect of what happened is that there seems to have been oversights all over the place (grid, hospitals, railways, etc).
There are lots of reasons why hospitals lose power, which is why they all have backup generators.
Ipswich's backup generator had a faulty battery. This is nothing to do with the grid. This is entirely the fault of the hospital trust. Most of the hospital's backups worked.
https://www.ipswichstar.co.uk/news/ipswich-hospital-blackout...
> A spokeswoman said: "Our initial investigation has shown that at 4.52pm on Friday, August 9, we lost our electricity supply until 5pm. We have 11 generators at Ipswich Hospital and all of them worked immediately.
> "What we have found is that the battery which automatically operates one of the switch over systems from mains power to generator power was faulty despite being within its recommended life.
Here's the trust document talking about the new installation when it was put in.
http://www.ipswichhospital.nhs.uk/aboutourhospital/Documents...
> Electrical High Voltage Infrastructure was a critically important project to the Trust in providing a resilient high voltage electrical network to the hospital. Through a range of electrical projects, including the replacement and upgrading of outpatients generator ‘C’, the maternity generator project and the upgrading of the high voltage switchgear for the forthcoming biofuels project, this represented a total overall investment in excess of £2m. Virtually all the Trust’s electrical switchgear has now been improved and modernised. Along with the new backup generators the hospital is protected for years to come and a major significant risk to hospital has been dealt with.
In this case, it was like asking somebody to be able to catch a ball, they say they are ready and yet fail to catch that ball when you thru it to them. Is that the fault of the person who throws the ball or the person that was not prepared to catch the ball when they said they could.
In this instance it falls into the infortunate situation, and from what I can tell, you can't lay blame onto anybody or party for the failure and it is just one of those things. Sure leasons will be learned, but from the grid procedure in this hospital case, there will be no change I can see that would be learned. However the Hospital will be learning from this and may have more frequent testing and checks of their failover, may make changes. So if blame is to be leveraged upon anybody - you could say it would be from the party that had to make changes. But in this instance, would that be fair. Hence I would call this unfortunate and whilst lessons will be learned, you can not lay blame out of those lessons all the time. However - if it happens again and those same mistakes transpire - then, maybe you have some grounds to lay some blame.
I fully agree with you that this is the likely outcome.
It seems that one of the commenters work for the National Grid or related so might be a bit partial...
It helps prevent the grid tipping into catastrophic shutdown when there's no backup generation left, or something major has tripped, as part of demand management. If it hadn't happened the consequences would have far more headline-worthy.
Railways, hospitals and the like that encountered issues were part of "the rest". That is not part of the 5% turned off, but the small part of the 95% "rest" that can't cope with some (larger than usual) drop of frequency. If they're buying trains that can't cope with a frequency slump or backup systems that aren't tested that's outwith grid control. That's a sign their systems need to be improved, and tested properly too.
Thing is, a solution today might not be best for tomorrow as the grid's usage is not static, new this and that are added so the impact changes.
It is interesting that you mention the inability for trains to restart. That was educational and was due to some new trains and showed that the drivers did not have the skills to in effect - reboot the trains from a cold start. So less a grid fault and more a case of that it never happened before so the result was less prepared. Interestingly the previous generation of trains did not have this issue, which may explain why it got overlooked as something that needed attention until such an event like this.
As for hospitals, they all have backup generators, though if that generator fails to kick in as was the case in one I read about, that can and will cause issues. Again, may be a case of never needing it before and the combination of that and regular checks/tests presented the problem.
Remember - nothing is perfect, and many lessons (as with any outage in all walks of life) will be learned from this as with all previous outages. But equally have to remember that whilst you can have the same combination of events happen in say 5 years time and have a response that works for that combination learned from the last time. Things change, like that new housing estate attached to the grid, small nuances like that could change everything or nothing. You just don't know. Heck, could be newer issues, suddenly find that you have thousands of electric cars being charged at the time you cut them off now feeding back small amounts of electricity back into the grid as they never expected to loose power without a physical disconnect.
This blackout made a lot of noise because of this (apart from the actual disruption, obviously).
Do you not think that trains should be able to resume ASAP? Do you not think that "it never happened before" is not a valid reason to be unprepared?
Do you not think that "we never had to use it before" is not a valid reason to explain why an emergency generator might not work when needed?
What backing up do you need?
As mentioned, things get added to the grid all the time, case of the airport was that it was not on a priority list. Yes that is an oversight, but who's fault and accountability we do not know. The onus would of been in the airport to inform the power distribution and if that failed to happen then the airport would be the ones with the hands up, if they was and the distribution failed to add it, then their hand would go up.
But hospitals as I mentioned operate and a designed and planned for such issues with them having backup power supplies. Which is the solution for many installations as many will not have or justify the cost of being upon their own distribution spur.
As for the "we never had to use it before" that's down the testing and covered in previous comments fairly well without repeating it again.
But if you wish to focus upon being able to point a finger at somebody and say it is there fault, then fine. But I and I'm sure many others would not be focusing upon that, though I can appreciate that mentality due to the way media/tabloids cover such and all issues in life. After all, power cuts today are not that common on this scale, decades past and in less developed countries they would be so common that they wouldn't even make the news.
But remember, if the weather forecaster says it will not rain and you go out and a light shower makes you wet - would the forecast be wrong or would we have the mentality to go, that mistake was within acceptable parameters and just one of those things. It gets down to what we are used to and what we accept. So yes, I get that blame need to be lain in many eye's but is that fair all the time?
But then - nothing is perfect - better to focus on getting closer to perfection than expending energy stagnating as too busy pointing the finger.
This failure may be within acceptable parameters and it may be simply meaningless to try to find someone truly responsible for it. But you seem to be unreasonably reluctant to believe that maybe it's not.
I understand that it's interesting to analyze what happened from a more technical perspective, but of course a proper investigation has to be conducted to find the responsible if there happens to be one (or more).
WE have covered many area's, trains, planes and hospitals (maybe a movie there). Sure I'd rather focus on the technical aspects and not presume this was something totally avoidable. Rather look at each nuance instead of the binary blame game. Which is not clear cut. After all - we don't know what SLA's supply contracts are in place now do we. But nothing is ever 100%. But it is possible to argue both sides of the coin and without ALL the details, go around in circles.
If we really want to blame anybody - why not just blame God for allowing it to happen and move on. Leave it to the report, which will happen into the incident and associated fallout to cover all that and discuss any blame then, once all the facts are in. But remember - we do not know what the SLA levels are, so all those fallouts take on a whole new perspective of blame. Equally, you can have a problem and nobody is to blame - though God works for those, at least "Act of God" is actually used in insurance contracts (yes worked in that field as well disclaimer, though late 80's early 90's). https://en.wikipedia.org/wiki/Act_of_God
I have no axe to grind. Hope that adds some clarity.
I am commenting that the scale of the disruption resulting from (only) a 5% drop does not seem reasonable and that some of the issues should have been better handled or avoided altogether.
> But I and I'm sure many others would not be focusing upon that, though I can appreciate that mentality due to the way media/tabloids cover such and all issues in life
That's a personal attack quite out of order.
> That's a personal attack quite out of order.
Not really. It's just a societal commentary on how we've conditioned ourselves by the media we consume into passing quick blame instead of taking a slow, reasoned approach to analyzing the event, seeing the compounding factors at stake and only in the face of gross negligence assigning blame.
Neither of which are acceptable.
> seeing the compounding factors at stake and only in the face of gross negligence assigning blame.
You are entitled to have your views. Claiming that there is no blame to assign until it reaches criminal liability is rather odd, though.
Hence my question about your background. But you implicitly answered that, too.
Though the swappable battery charger offerings do seem to be more suited in accommodating such avenues and removes the worry of battery lifetime cycles from the owners. Worry that their car acts as a grid battery for a month when on holiday and reduces it's life beyond the cost of saving. So will be a case of getting the balance right. Hence I feel the swappable battery offerings may be at an advantage here and opens up making such solutions more cost effective to run.
Is interesting as it highlights the importance of managed failure. Things fail, but the ability to see those failures and control how that fails is important. Had such an action not been taken, the result would of been a far greater outage/impact and more so an outage that you had no idea what parts it would impact.