Why is the nuclear industry plagued with cost and schedule overruns? And shouldn’t they have thought by now, “hey our estimates are always off so let’s double them”?
Re:A Double First in China for Advanced Nuclear Reactors by ajnin on Thursday July 05, 2018 @07:04PM (#17467616)
As the article states, they lost their competency. Here in France, the reason is poor planning, focus on cost-cutting and lack of long term vision by top management and government. EDF, the historical state power company turned into a private company in 2004, laid off most of the technicians that built the power plants over the years and subcontracted all the maintenance work to hundreds of subcontractors that fight for the lowest bid and employ only underqualified people, who often work in illegal conditions. The latest EPR reactor in construction in France is riddled with defects, the pressure vessel, built by Framatome, also absorbed by EDF, has uneven carbon content which means it could crack. The concrete enclosure has many large holes due to poor work. The bridge on top of the reactor was made of low-quality steel bought in Russia and had to be replaced. Basically everything is badly done, because they constantly try too make it in the cheapest way possible. But it's not working out for them because fortunately the nuclear safety authority is there to force them to redo things correctly. In its current state, the nuclear industry is basically dead in France. As another example, they can't decomission the plants arriving in end of life, and EDF officially postponed it until 2100.
Re:A Double First in China for Advanced Nuclear Reactors by cc439 on Thursday July 05, 2018 @10:34PM (#17468456)
>As the article states, they lost their competency.

I think people undereatimate how bleak the short term future (50-100 years) is looking right now. We've forgotten how to properly build many of the things we once touted as the pinnacles of modern civilization and the current societal status quo is too fractured and stressed to ever pursue the kind of learning process needed to reaquire that knowledge. This is but one example among many.

Re:A Double First in China for Advanced Nuclear Reactors by greglindahl on Thursday July 05, 2018 @11:53PM (#17468717)
We have plenty of competence in wind and solar energy. What we need to pay attention to is that many of the nuclear plants built in the past are flawed, and so we always had less competence at building them than we thought.
Re:A Double First in China for Advanced Nuclear Reactors by candiodari on Friday July 06, 2018 @01:53AM (#17469217)
Not at all. We had plenty of competence. We just chose to save a buck instead of using it.

And the risk ? "You cannot blame me for that !"

(especially since this is taxpayer funds, ie. everyone, decided by democratic vote, at least in France and the US. The democratic contract ought to mean that since we collectively decided to do this, we are also collectively responsible for the results, and yes, even if you voted for the other guy)

Re:A Double First in China for Advanced Nuclear Reactors by greglindahl on Friday July 06, 2018 @03:16AM (#17469581)
You appear to be certain that you know a lot about whom to blame, but the reality is that it's unclear that we ever had the ability to build a large number of reliable nuclear power plants.
Re:A Double First in China for Advanced Nuclear Reactors by opo on Friday July 06, 2018 @02:39PM (#17474048)
>…it's unclear that we ever had the ability to build a large number of reliable nuclear power plants.

Nuclear power plants have been safer and more reliable than other forms of power.

In terms of reliability, nuclear has had the highest capacity factor of any source of power: https://en.wikipedia.org/wiki/Capacity_factor

In terms of accidents, nuclear has had a much better safety record than any other form of power up this point: https://en.wikipedia.org/wiki/Energy_accidents

(They don’t cover ground based solar which I would think would actually be the safest. Why do people keep wanting to subsidize roof top solar?)

Some other links on deaths due to energy production: https://www.nextbigfuture.com/2011/03/deaths-per-twh-by-ener... https://www.statista.com/statistics/494425/death-rate-worldw... https://ourworldindata.org/what-is-the-safest-form-of-energy https://www.forbes.com/sites/jamesconca/2012/06/10/energys-d...

Unfortunately anything at all related to nuclear is covered by the media orders of magnitude more than other power sources so people have an understandable perception that it is much more dangerous than other sources of power. What if the Alison Canyon was a nuclear storage site (instead of a natural gas storage site) and 11,000 people had to be evacuated - how much would the media have covered that? Another recent example would be the evacuation at the Oroville dam - almost 200,000 (YES 200 thousand!) people were forcibly evacuated since the worst case failure scenario would have have been a tidal wave of water 30 feet high rushing down stream. This made the news for maybe a day. I can't blame some for being afraid of nuclear power, but there are many who should know better.

Re:A Double First in China for Advanced Nuclear Reactors by Reason077 on Saturday July 07, 2018 @03:44AM (#17477560)
”Why do people keep wanting to subsidize roof top solar?”

Ground-based solar has a cost in terms of the land being unavailable for other purposes, such as agriculture or housing or even just maintaining ecosystems in their natural state.

But roof-top solar is making use of a resource that is otherwise unproductive space anyway. There are also benefits to having energy production right at the point of use, since you avoid grid losses and are offsetting the retail cost of energy rather than selling into the grid at wholesale prices.

Re:A Double First in China for Advanced Nuclear Reactors by opo on Sunday July 08, 2018 @01:10AM (#17482255)
>...Ground-based solar has a cost in terms of the land being unavailable for other purposes, such as agriculture or housing or even just maintaining ecosystems in their natural state.

True, but I was mostly comparing the safety record. The death rate for rooftop solar is probably at least an order of magnitude worse than ground based solar. Even with subsidies it is also much more expensive.

>...There are also benefits to having energy production right at the point of use, since you avoid grid losses and are offsetting the retail cost of energy rather than selling into the grid at wholesale prices.

Very little of rooftop solar is used on site - it is just added to the grid.

Re:A Double First in China for Advanced Nuclear Reactors by Ygg2 on Friday July 06, 2018 @08:01AM (#17470688)
We know we are incapable, because deaths per GWh for nuclear power are lower than solar or wind. Oh wait. No. That's opposite.
Re:A Double First in China for Advanced Nuclear Reactors by bobthepanda on Friday July 06, 2018 @04:39AM (#17469888)
When you elect representatives, you delegate a lot of authority to those representatives. No one picks who to vote solely on nuclear policy, and you could argue that if it you actually polled voters it probably wouldn't rank very high in terms of priorities, especially not nuclear at any cost.
Re:A Double First in China for Advanced Nuclear Reactors by Bograff on Thursday July 05, 2018 @11:56PM (#17468728)
I feel like this outlook discredits a lot of wonderful young people out there.
Re:A Double First in China for Advanced Nuclear Reactors by Reason077 on Friday July 06, 2018 @03:06AM (#17469537)
And yet, the UK government awarded EDF the contract to build the new Hinkley Point C plant, to the same EPR design.

Decommissioning nuclear plants is hugely expensive and a problem all over the world. It’s one of the main reasons why nuclear is now so expensive.

One hope is that it may be cheaper in future with advances in robotics, etc, which can operate safely in contaminated environments.

Re:A Double First in China for Advanced Nuclear Reactors by iforgotpassword on Saturday July 07, 2018 @06:15AM (#17477906)
This perfectly illustrates why I'm absolutely against nuclear energy. You know, all those pro nuclear advocates apparently assume that powerplants will be run by selfless companies that only care about safety and human well being and are content as soon as they can cover their expenses. I can't fathom how you can be this disconnected from reality.

Reality is that you cut costs, and keep cutting costs more and more as long as that thing doesn't blow up, and if you have problems or minor leakage that you would have to report but can cover up, you do so.

And we didn't even get started with nuclear waste. What could and should be done and what is currently being done is again miles apart in many instances.

Re:A Double First in China for Advanced Nuclear Reactors by wiz21c on Friday July 06, 2018 @06:52AM (#17470376)
>>> hundreds of subcontractors that fight for the lowest bid and employ only underqualified people

ahhhh the marvels of competition...

Re:A Double First in China for Advanced Nuclear Reactors by pacnard on Friday July 06, 2018 @07:02AM (#17470427)
But there is no competition. The company that is using subcontractors has a law-sustained monopoly and political connections. Of course they just need to look for the cheapest guys.
Re:A Double First in China for Advanced Nuclear Reactors by adrianN on Friday July 06, 2018 @06:29AM (#17470289)
There are lots of large construction projects that overrun their budget, not just for nuclear power plants.

Just check out Berlin's new airport:

Fifteen years planning phase, construction start 2006 with initial estimates of five years construction time. Initial cost estimate ~700 million Euros. Cost estimate at the start of construction 2400 million Euros. Cost estimate five years into the construction 4200 million. Cost estimate nine years into the construction nearly 6000 million Euros... now we're 12 years into construction and still don't have a reliable estimate when it's going to open.

And it's not like we haven't been building new airports for decades like with nuclear power plants.

Re:A Double First in China for Advanced Nuclear Reactors by CompelTechnic on Friday July 06, 2018 @08:24AM (#17470805)
I work at a nuclear equipment supplier.

The focus on paperwork as opposed to real engineering work is something to be in awe at. Process drains competence, but even under ideal scenarios, these are large, complicated machines, and the base incentives for all layers of management are to underestimate the time and cost to complete a project. For many nuclear projects, cost overruns do not hurt the people who made the initial estimates, and the estimates are impossible to do correctly anyway due to the vast complexity.

EDIT: One thing I will also add is that as time goes on, the corpus of knowledge you need to know in order to effectively engineer the parts we supply only grows, as the nuclear fleet ages, documentation rots, and more code editions are released. This means that young engineers face a steeper learning while the graybeards (70 year old engineers, not 35 years old, aka graybeard in software years) face retirement.

Re:A Double First in China for Advanced Nuclear Reactors by AngryData on Friday July 06, 2018 @03:42AM (#17469693)
The politics of it all introduces a lot of problems. You don't just have some single guy or few people that decide to build a plant. You gotta go through federal politics to even be allowed to attempt to build a nuclear facility, and lower levels of government will have a lot of push back to not put the actual facility near themselves, especially fuel and waste storage. There is a lot of pockets to lube up with money along the way before you even get to having your plant designs reviewed and approved. There are also international politics to deal with in most cases depending on how you are sourcing your material. And by time you get all that done and are ready to build the plant, there is an entirely new set of politicians to introduce more potential holdbacks, and then any one working in the construction phases are going to be demanding a premium just because of what it is.

And although those costs aren't unknown, if you do state all those extra costs straight out people will just assume its going to cost even more on top of that anyways and deny the project from the start.

Re:A Double First in China for Advanced Nuclear Reactors by mikeyouse on Thursday July 05, 2018 @04:58PM (#17466789)
They do -- And then they come in at 2x time/cost of the doubled estimate.

The initial estimate for the Vogtle expansion in Georgia was $11.5 billion total with first power coming in 2016 and 2017 for the two reactors. The cost was repeatedly revised upwards with the latest estimate at $27 billion and they aren't expecting power before 2022. The entire project might still be cancelled and rate payers will just lose ten billion+ dollars.

Can you imagine a project that is over 100% over budget in time and money when the scale is billions of dollars and a decade?

Anyone with the background should try and pencil out a financial forecast to make money off tying up tens of billions of dollars for 15 years before you see a penny of revenue.

Re:A Double First in China for Advanced Nuclear Reactors by hospes on Thursday July 05, 2018 @05:41PM (#17467084)
Meanwhile in 8 months in India they have built 648 MW solar plant that costs $679 million [1].

[1] https://youtu.be/gM-0lrIxCnE

Re:A Double First in China for Advanced Nuclear Reactors by adventured on Thursday July 05, 2018 @09:49PM (#17468342)
11 of the 12 most polluted cities on earth are in India. They need to build a lot faster given coal is still 3/4 of their energy generation. The US is a laggard on solar as a percentage of energy generation, and even the US has a larger share of its energy derived from solar than India does.

https://www.bbc.com/news/world-asia-india-43972155

Re:A Double First in China for Advanced Nuclear Reactors by Reason077 on Friday July 06, 2018 @07:09AM (#17470456)
India's air pollution problem is only partially due to power plants. Much of it comes from things like cooking fires, agricultural burning, and combustion vehicles. Closing down coal would be a step forward, but wouldn't solve the problem alone.
Re:A Double First in China for Advanced Nuclear Reactors by DoctorOetker on Thursday July 05, 2018 @10:09PM (#17468395)
Pretty much off topic by me but:

Do you know what is the total surface area of currently installed solar panels by SolarCity?

Alternatively the largest total area solar panels operated by a single entity?

(it's for an astronomy idea I have)

Re:A Double First in China for Advanced Nuclear Reactors by growlist on Thursday July 05, 2018 @06:12PM (#17467305)
Why don't they build sites with many small productised nuclear sub propulsion type reactors, as opposed to a single monstrous and pretty much bespoke reactor? I'm sure there's a good reason but on the surface it seems like commodity reactors would be a far cheaper approach in the end.
Re:A Double First in China for Advanced Nuclear Reactors by yourapostasy on Thursday July 05, 2018 @10:18PM (#17468419)
> ...commodity reactors would be a far cheaper approach in the end.

I've read claims that in the US, unfortunately there are no commodity reactors, with commensurately commodity costs in licensing, environmental and regulatory approvals. Each reactor is effectively a one-off effort, with a minority of transferable capital equipment, skills, etc. I've also read that France's reactors are far more uniform, and they reap many benefits from it.

I wish more research and engineering could be justified into ultra-small reactors like described in this Quora response [1]. Not really sure what he meant by a magneto-hydrodynamic power conversion because I didn't picture a conductive fluid involved from his description, but I wonder if the reaction can be scaled down even smaller than the proposed 100 GJ burst (I somehow suspect battery chemistries don't take kindly to those scales of bursts).

[1] https://www.quora.com/Is-there-a-micro-nuclear-reactor-that-...

Re:A Double First in China for Advanced Nuclear Reactors by greglindahl on Thursday July 05, 2018 @11:55PM (#17468725)
The whole point of the new generation of both Westinghouse and EDF reactors is that each would be a commodity. And both are stumbling at the start.
Re:A Double First in China for Advanced Nuclear Reactors by brandmeyer on Friday July 06, 2018 @02:06AM (#17469289)
Because there are natural economies of scale in building larger nuclear reactors. Submarine propulsion reactors are several times more expensive than commercial reactors on a per-unit-power basis, even after accounting for the overruns.
Re:A Double First in China for Advanced Nuclear Reactors by Reason077 on Friday July 06, 2018 @06:53AM (#17470381)
The large size of nuclear reactors is often one of the factors blamed for their high cost.

Small Modular Reactors (SMRs), which could be manufactured in factories rather than in bespoke, on-site builds, are regarded as a technology that could bring down the cost of nuclear builds in future.

I suspect submarine reactors are expensive because of their unique design constraints, relatively small production runs, and the fact that they are contracted/built on military budgets rather than in competitive commercial environments.

Re:A Double First in China for Advanced Nuclear Reactors by growlist on Friday July 06, 2018 @05:43AM (#17470122)
I was being lazy in my post I suppose: work on this idea is well underway. Whether it proves successful or not still seems unclear:

https://en.wikipedia.org/wiki/Small_modular_reactor

Re:A Double First in China for Advanced Nuclear Reactors by brandmeyer on Saturday July 07, 2018 @10:40PM (#17481882)
The wikipedia article doesn't do a good job of selling it.

Lets take a statement like this: "Nuclear reactor fuel can be low-enriched uranium, with a concentration of less than 20% of fissile 235 U. This low quantity, non-weapons-grade uranium makes the fuel less desirable for weapons production."

20% enrichment is far higher than what is typically used in commercial power reactors. Because of the exponential behavior of uranium enrichment, 20% is almost all the way up to weapon's-grade material. Its part of why Iran's stockpile of 20-40% material was so concerning - they could have very quickly converted that into bombs.

If you have the technology to crank out 20% U-235 in quantity, then you also have the technology to make weapons in quantity.

Here's another concerning statement, "Many SMRs are fast reactors..." Fast reactors are inherently capable of being used for mass-production of plutonium. Plutonium production from fast breeder reactors is far less expensive than uranium enrichment, and an even higher proliferation risk.

Honestly, I think that the only reason small modular reactors have some traction because they appear to require less capital investment than full-scale reactors, thus drawing VC slush money.

Re:A Double First in China for Advanced Nuclear Reactors by maxxxxx on Thursday July 05, 2018 @06:10PM (#17467284)
This makes fusion look almost cheap :-)
Re:A Double First in China for Advanced Nuclear Reactors by mikhailfranco on Friday July 06, 2018 @05:48AM (#17470136)
And look almost quick to market ... in 50 years (as they always say).
Re:A Double First in China for Advanced Nuclear Reactors by pharrington on Thursday July 05, 2018 @05:03PM (#17466832)
They do, the logistics of constructing a nuclear power plant is one of the most complex things humans currently do, and federal funding that was promised at the outset of construction can be (and in this case, was) reneged by a new administration.
Re:A Double First in China for Advanced Nuclear Reactors by jabl on Friday July 06, 2018 @09:34AM (#17471232)
Mike Shellenberger argues the way to build nuclear plants on time and budget is to build the same design over and over cookie cutter style. https://www.forbes.com/sites/michaelshellenberger/2018/06/21...

Basically we're building so few of them so seldom, that every time it's a FOAK and we start the learning process from scratch.

Re:A Double First in China for Advanced Nuclear Reactors by ekingr on Thursday July 05, 2018 @06:51PM (#17467539)
They do.

If you want an order of magnitude of how huge the drifts are, have a look at the construction of the EPR of Flamanville in France[1]: started in 2007 with an initial timeline of 5 years and budget of €3.3bn, it is still not completed as of today (they just announced targeting the end of 2018) and the current budget is over €10.5bn.

In the end, the complexity, criticality and sheer scale of these projects make them extremely hard to lead properly and any setback can have gigantic impacts.

[1] https://en.wikipedia.org/wiki/Flamanville_Nuclear_Power_Plan...

Re:A Double First in China for Advanced Nuclear Reactors by realusername on Friday July 06, 2018 @12:09AM (#17468769)
The Flamanville EPR is a bit of a special case since it's the first of its kind, so it's not surprising that it's not on budget and schedule, I hope EDF learned some lessons from that.
Re:A Double First in China for Advanced Nuclear Reactors by anonfunction on Friday July 06, 2018 @06:55AM (#17470389)
Hofstadter's Law: It always takes longer than you expect, even when you take into account Hofstadter's Law.
Re:A Double First in China for Advanced Nuclear Reactors by rory096 on Thursday July 05, 2018 @06:37PM (#17467461)
Re:A Double First in China for Advanced Nuclear Reactors by clarkmoody on Friday July 06, 2018 @07:11AM (#17470465)
Because the government is heavily involved. The process is both massively bureaucratic and political, which is a surefire way to spend way more time and money than originally estimated.
Re:A Double First in China for Advanced Nuclear Reactors by allannienhuis on Thursday July 05, 2018 @04:49PM (#17466711)
s/nuclear/software/g

There, fixed that for ya. :P

Re:A Double First in China for Advanced Nuclear Reactors by yazr on Thursday July 05, 2018 @05:59PM (#17467232)
Your comment is more insightful that u realize ;)

Software projects often suffer from exponential variations in specs, implementation, testing, environment, etc.

Nuclear projects often suffer from inflexible and pre-defined specs and constraints.

Re:A Double First in China for Advanced Nuclear Reactors by ummonk on Thursday July 05, 2018 @04:52PM (#17466734)
That happens in basically every industry. The problem is that if you double your own estimate, but no one else does, then your project doesn't get selected. Also, if you double your estimate and go ahead with the project, it will have a psychological impact which causes wasteful spending and slow work that will result in additional overruns...
Re:A Double First in China for Advanced Nuclear Reactors by greglindahl on Thursday July 05, 2018 @05:40PM (#17467072)
I haven't heard much about cost overruns for wind farms and solar panel farms.

Solar thermal, yes, that's a startup industry.

Re:A Double First in China for Advanced Nuclear Reactors by ummonk on Friday July 06, 2018 @03:19AM (#17469594)
To clarify, it happens in basically any industry with megaprojects.
Re:A Double First in China for Advanced Nuclear Reactors by greglindahl on Friday July 06, 2018 @03:44AM (#17469704)
So, it applies to all of the recent large solar, wind, and battery projects... which appear to hit their budgets and dates? Or are those not megaprojects?
Re:A Double First in China for Advanced Nuclear Reactors by angry_octet on Friday July 06, 2018 @07:29AM (#17470547)
Most megaprojects have mega complexity. In contrast, wind, solar and batteries are scaling by having many units, feeding in to a dumb grid, and don't have the complexity explosion.

Distributed generation and smart loads were invented to add enough complexity (technical, regulatory) to allow them to achieve massive system failure :-)

Re:A Double First in China for Advanced Nuclear Reactors by CompelTechnic on Friday July 06, 2018 @08:39AM (#17470890)
This is why I think solar can win in the long term (wind already has won) - just scale up linearly. Doing so is geared toward standard assembly line production, standardized installation for the technicians, regardless of scale.
Re:A Double First in China for Advanced Nuclear Reactors by johngalt on Thursday July 05, 2018 @04:57PM (#17466780)
Imagine their surprise when the estimates are still wrong after doubling.
Re:A Double First in China for Advanced Nuclear Reactors by jjoonathan on Thursday July 05, 2018 @06:30PM (#17467420)
Because NIMBYs have figured out how to drag the process out indefinitely. It's very effective at making nuclear projects un-economical.