Hope that helps. Your deployment is larger than ours, so there may be other techniques, but that's what we did.
I.e. you would also want to be sure that your wiring was rated for 100% utilization, and that other circuit-breaker-like functions exist.
Fire is an actual thing, and figuring out the best way to recharge a halon system isn't exactly what you want to be doing.
When you hardwire the circuit the electrical code allows you to use a 100% breaker.
This is less common in DCs historically but more and more as folks do 208v 3phase 100A circuits.
For a deployment of this scale it should be metered power (For example 1 (or more) 3phase a+b drops to each cabinet) where you only pay a Non-Recurring setup Charge (NRC) and then the MRC is based on actual power draw.
3phase also means fewer physical PDU's (uses less space), but more physical breakers. Over-building delivery capability will eliminate any over-draw concerns for startup cycles.
Since my cabinet number is usually evenly divisible by N*PDUs, this impacts overall capital.
Having a little headroom on your power circuits is also incredibility important, and not every facility will sell 100% rated breakers. It may make more sense to be in a facility with 80% rated breakers than 100%, even with the added capex of an extra PDU or two.
Goes back to my previous comment. What is important to you, at the pod / multiple pod level, isn't as important to the 1-2 cab deployment.
Similarly, ensure spare room in the cabinet for adjustments, that thing you forgot, and small growth. Much better to have 70% full and not need the space then to have no free RU and need the space.
I would recommend verifying everything is fault tolerant/HA as expected every step of the way. We ran into issues where the power strips on both sides were plugged into the same circuit(D'oh), wrong SST's, redundant routers getting cabled up to the same power strips, etc and you name it.
After a rack is setup have people at the DC(your own employees or the DC's techs) help simulate(create) failure in power, networking, and systems to verify everything is setup correct. It sounds like you have people coming onboard with experience provisioning/delivering physical systems though, so I would expect them to be on the ball with most of this stuff.
A system at idle vs full CPU vs full cpu + all disk will produce very different measurements.
Also keep in mind 80% derating - many electrical codes will state that an X amp circuit should only be used at 0.8X on a continuous basis (and the circuit breakers will be sized accordingly).