It's not only the crazy price changes and random stocking issues. Small players have zero leverage with suppliers and are a much weaker link in this whole chaos. Good luck trying to find investors willing to put money to drive growth.
Hardware startups is absolutely brutal. No surprise so many fail after a "successful" Kickstarter campaign.
I'm actually surprised we're only going under nearly 30 months after the pandemic started. I would bet that millions of people will be unemployed because a gazillion of small companies will shut off in the next 18 months.
I'll never start (or work for) a hardware company for the rest of my life. Software is so much a better business to invest that makes me cry just thinking how much money and years I lost of my life.
What I did in fact learn was to give absolutely tons of respect for people who pull this off. There's a lot of trash talk articles about Peloton and other struggling hardware companies but they have no clue how freaking difficult it is. Now at least I can say I do.
-- Edited for clarity
https://www.youtube.com/results?search_query=chip+shortage+a...
Et tu, ATMEGA328P?
It's getting very real very fast out there.
It's not what ASML does - ASML exec reported that some other company does this
There must be some interesting chips in washing machines these days.
I laugh when people claim chips are desoldered by anyone at all, even Russia.
Anyone with a minimal amount of knowledge knows that it would cost tons of time and money (and be impossible for anyone not well educated/experienced in the craft) to:
1) design a new circuit board around the chip 2) print said circuit board in sufficient quantities 3) Write software (from scratch) for the chip
ASML is most certainly not involved, regardless.
Your steps 1 thru 3 could cost $100k or more, depending on the chip.
If you're selling 1,000 to 10,000 units of something in the short term, you'd definitely pay the premium for a removal and repackaging
Obviously the economics only work in low volume / high NRE sectors -- like semiconductor tooling.
We use smart PLCs (programmable logic controllers - basically an Intel Atom powered realtime platform with modular high-speed analogue/digital I/O) for a lot of our projects. For one project, we were planning on deploying a cheap PLC plus a thermocouple module and some SPI modules. Because of availability, that turned into buying thermocouple and SPI interface chips ourselves, and designing a custom PCB to interface those to a Raspberry Pi. And now of course Raspberry Pis are impossible to get, so while we managed to get hold of enough for the first run of deployments, we don't have any more of them - we even had to ship our tester Pi! It's a real scramble, and we've definitely lost a bunch of money on that project.
SRAM running at 200mhz with 1 cycle latency can perform what looks like miracles when placed side by side with DRAM running at LOLWTF Ghz that is stuck behind 100 cycles of delay talking to the CPU that first tries to work its way through multiple steps of onboard cache and lookup buffers and all sorts of fun things.
Embedded controls can do stupid amazing things with very little resources because all of a sudden you have removed a huge constant delay from all memory accesses.
Throughput, however, they don't do so well on throughput. :-D
If you think you can answer parents problems without even knowing the problem space, you're behaving foolishly.
Understand the problem, then propose solutions.
Anything else is ass backwards.
Now, 6 months later, I want to build some more, and about half of the BOM is out of stock on Digikey. I was able to source most stuff on Mouser instead, but the switches I used weren't available anywhere and I had to go to a different manufacturer, driving the cost from $12 of switches per build to $18.
Huge pain in the ass, but at least I was able to get it done. I feel for the people who designed around particular parts and are now starting at 2023 "in stock" dates.
No wonder there are some $5 MCUs going for $500+ each (and apparently selling well at those prices, even)
So instead of people getting rich by innovating and making other people’s lives better, the people getting rich are the ones taking bribes (“campaign contributions” they get to keep forever) for reducing the impact of those regulations.
That’s on top of the fact that we are always dealing with incomplete information.
Sure, subbing a MCU for an unknown supplier in a kids toy isn't likely to cause any serious problems, but in anything that can hurt or kill people it's objectively a good thing that there are regulations in place to prevent safety issues.
Ive heard the same complaints about food regulations, but it's objectively a good thing that a consumer can purchase anything (that isn't expired) from a grocery store with near certainty that it won't make them I'll. That same surety can't be had in countries with more lax food standards.
That this is heavily regulated is a good thing, because in the not so distant past we had people die due to the Therac-25.
I get wanting fewer regulations, really, I do. But just because YOU don't see the point to regulation a, b, c or d doesn't mean they're not necessary, just that you might not realise WHY they are necessary.
Then there were supply issues, and everybody is not only trying to get their hand on the parts they need, but they also try to stockpile some components just in case.
Essentially marked changed completely, and is throwing off all kinds of estimates and people are still trying to figure out what is what. Buyers are trying to stockpile as much as they can get, I know at least one company that bought run of 50k stm micros, not for any particular project, just in case they will need them. Hardware companies are claiming they are increasing capacity, but are doing it reluctantly, because they think it will be blown over, and they will have a lot of extra capacity, that they wont be able to sell.
You want to build a product? Great, here's the list of what you can't get this week. It's different from last week, next week will be different too. Good luck!
Parts that used to cost $0.50 are now $5+ (various ADCs and DACs come to mind as one I've been dealing with). God help you if you want trailer axles. Etc.
There's only so much you can do with flexibility and "Redesign every few weeks for what's available for this batch" before your design costs and parts cost increases chew up all the available profits, even if you've designed for flexibility. "We can use any uC in this entire line!" "That line is on 54 week lead time. Yes, all the variants."
Such is life in the decline.