Re:The age of Scrum is over by m12k on Friday May 27, 2022 @03:54PM (#31534138)
To me, Scrum has always been something of a paradox. The whole point of agile is to adapt the process to the team's needs - if you're doing dogmatic agile, you're not actually doing agile. But what Scrum seems to add on top of the agile manifesto seems to be mainly dogma.

I like the term "just-in-time process". A team should have only the processes in exactly the amounts that provide value to the team, and no more. If a daily standup is found to waste people's time, don't do it, or do it less often. If team members are found to need to do more coordination, maybe other avenues of communication could be encouraged?

Re:The age of Scrum is over by myth2018 on Friday May 27, 2022 @04:17PM (#31534396)
The biggest problem is not in Agile itself, but indeed in the dogmatism of its practitioners. I believe that stems from the fact that agile methods became too "productized": there's a whole market of books, lectures, certifications, courses etc and lots of people willing to profit from it.

Eventually it became a sort of a religion. If you question it, it's because you don't understand it; if it yields bad results, it's because you did it wrong; if it doesn't fit the dynamics of the rest of the company, it's because the company is immature. All the methods have known limitations and prerequisites. All but Agile, which is perfect.

It's a ridiculous lack of empiricism for a discipline like software engineering.

Re:The age of Scrum is over by manuelabeledo on Friday May 27, 2022 @06:04PM (#31535453)
> The biggest problem is not in Agile itself, but indeed in the dogmatism of its practitioners.

I feel that most people don't understand that larger corporations don't adopt Agile to benefit product teams, but to add a layer of measurability to the process that is only useful for middle and upper management to establish and track OKRs.

Thus Agile may not be a failed idea, but it arguably fails at the implementation.

Agile apologists seem to be disconnected from this reality.

Re:The age of Scrum is over by matt-attack on Saturday May 28, 2022 @09:15AM (#31540103)
Totally agree. All these teams down in the weeds are obsessed with following the rituals to a tee thinking that makes them good little devs. When the whole point is so the middle and upper managements can track your activity to the minute and judge your performance.
Re:The age of Scrum is over by capableweb on Friday May 27, 2022 @04:33PM (#31534543)
Most of the consultants/junior developers/managers and others who try to shoehorn "agile" into every process and team doesn't seem to have actually read the original "agile manifesto", which is:

> Individuals and interactions over processes and tools

> Working software over comprehensive documentation

> Customer collaboration over contract negotiation

> Responding to change over following a plan

Re:The age of Scrum is over by myth2018 on Friday May 27, 2022 @05:00PM (#31534823)
I agree with you.

But even the Manifesto has some points that make it impractical in many circumstances.

To stick with a single example: is it safe to favor customer collaboration over contract negotiation when dealing with high budget projects? Changes in requirements, delays, reprioritizing in client's side, those are all things we know that may happen. How are we going to deal with them after you favored customer collaboration, and that collaboration doesn't exist anymore?

Agile requires Trust. But trust is a fluid thing, and we must cope with its fluctuations.

The client is cooperating? Good, let's get a bit liberal about some rules, but let's keep monitoring the situation. The team is mature enough to self-manage? Good, let the team manage itself, but keep an eye to see if things are still running smoothly as the time goes by.

The biggest problem of Agile is that it takes Trust for granted and assumes that every single stakeholder wants the project to succeed, and shares the exact same definition of success.

Re:The age of Scrum is over by dragonwriter on Friday May 27, 2022 @05:19PM (#31535052)
> To stick with a single example: is it safe to favor customer collaboration over contract negotiation when dealing with high budget projects?

Yes, but note that the client is inside the circle, not an external force, in Agile.

> Changes in requirements, delays, reprioritizing in client's side, those are all things we know that may happen.

Yes, that is specifically what the point deals with, on both sides. Favoring contract negotiation over collaboration is a very poor way of dealing with those things.

(The X over Y statements in the Manifesto are not X instead of Y, but Y must be centered on supporting X; contract negotiation is necessary, but the terms must be framed to support collaboration rather than impede it by being inflexible for the kinds of things that are known to be likely to change over the time of the project development.)

> How are we going to deal with them after you favored customer collaboration, and that collaboration doesn't exist anymore?

If the need for collaboration was centered in contract negotiation, then that will be addressed.

> The biggest problem of Agile is that it takes Trust for granted

The biggest problem (though far from only) problem of Agile is that the authors of the Manifesto underestimated the degree to which people would misread “over” as “instead of”, even given an explicit admonition that that reading was incorrect, making the Manifesto terse and catchy, but ineffective in communicating it's core ideas.

Re:The age of Scrum is over by myth2018 on Friday May 27, 2022 @07:45PM (#31536220)
> Yes, but note that the client is inside the circle, not an external force, in Agile

Indeed, and this is one of the points Agile gets furthest from real world.

Anecdote: I've worked for an average-sized bank with users who were cooperative but not that much. One day we were faced by an urgent legal requirement and the bank had to choose: either to halt operations or to adapt the software, otherwise our equivalent of a CFO would be arrested. The customer became an integral part of the team, we had extremely fast iterations and that was my first Agile project, and I didn't know it because I was going to hear first time about Agile only three years after that.

As soon as the legal requirement was met, things got back to normal.

That's what I talk about methodologies having to subject themselves to the environment. Agilists seem to dream about inverting things in this regard.

> The biggest problem (though far from only) problem of Agile is that the authors of the Manifesto underestimated the degree to which people would misread “over” as “instead of”, even given an explicit admonition that that reading was incorrect, making the Manifesto terse and catchy, but ineffective in communicating it's core ideas

I agree, but even avoiding the "instead of" interpretation, I believe the ideas in the Manifesto are only actionable under special conditions.

Each project is a different case and demands a different combination of agile/non-agile variables, it all depends on the environment it presents (customer behavior, team's maturity, project complexity etc)

Re:The age of Scrum is over by dragonwriter on Friday May 27, 2022 @09:10PM (#31536693)
> Indeed, and this is one of the points Agile gets furthest from real world.

It's one of the parts the Manifesto gets most right about the real world.

> That's what I talk about methodologies having to subject themselves to the environment. Agilists seem to dream about inverting things in this regard.

I don't know “Agilists” in any general sense, I do know that adapting methodology to the specific (and shifting over time on a single project/product) combination of team, context, and task is the central focus of the Agile Manifesto.

Re:The age of Scrum is over by skrtskrt on Friday May 27, 2022 @05:33PM (#31535188)
If you don’t protect yourself with a contract, another party will screw you 11 times out of 10.

By all means collaborate, but put it in a contract too.

Re:The age of Scrum is over by jacobr1 on Friday May 27, 2022 @07:42PM (#31536195)
One of the subtleties is how to determine acceptance criteria by the stakeholders/client. You can negotiate upfront a spec, and upon delivery conformance to the spec means success. Or you could negotiate a high-level objective, or a metric to be changed, and every sprint get an on-the-fly approval of the incremental changes delivered.

The key is understanding the upfront spec, while a necessary stating point, is almost certainly wrong, maybe fundamentally so. So how are renegotiations handled?

Re:The age of Scrum is over by dasil003 on Friday May 27, 2022 @06:08PM (#31535486)
These are good points, but trust is not a prerequisite only for Agile. IMHO all large-scale software projects require trust to create space for the team to figure out the right path. If trust is lacking, it needs to be established, but the actions and steps that need to be taken are highly contextual and outside the scope of the Agile Manifesto.
Re:The age of Scrum is over by myth2018 on Friday May 27, 2022 @11:51PM (#31537447)
I agree it's needed and it must be established if lacking, but 1) sometimes it's too unstable and you need institutional devices to counterbalance, but such devices are dismissed as useless bureaucracy in agile ideology and 2) agile seems to assume an idyllic world in which trust is established a priori and can be safely taken for granted
Re:The age of Scrum is over by DreamFlasher on Friday May 27, 2022 @06:09PM (#31535491)
> consultants/junior developers/managers and others who try to shoehorn "agile" into every process and team

This is in itself a major point. Managers trying to put scrum on everything. This is my main hope for scrum passing away. I have seen it now several times companies deciding to use scrum for research projects, and after a year they all realize how bad of an idea that is.

On the other hand so far I haven't worked for a single company that actually did scrum (despite claiming it). They all started by "adjusting the process" and removing the scrum master. Sure. You totally understood how this works.

Re:The age of Scrum is over by xg15 on Saturday May 28, 2022 @06:14AM (#31539084)
But couldn't this "ossification" of agile be a sign that the manifesto is actually wrong?

A lot of the criticism seems to form around the fact that people actually develop processes around agile, even though agile discourages processes. (And that those processes in the end become empty rituals that hinder development more than support it)

But couldn't this actually be a sign that people in fact need processes to get some kind of routine and system into their work?

Re:The age of Scrum is over by ericbarrett on Friday May 27, 2022 @07:01PM (#31535922)
Rather than becoming this over time, Scrum slotted into existing teams and practices that were already heavily into rigid project management. The same teams that adopted Scrum were previously using Waterfall or 6-Sigma or some other such prescriptive framework. Agile showed up, got a lot of buzz, and then Scrum came along to sell the buzz to big institutions with entire departments of professional project managers.

Were the creators of Scrum hopefully trying to introduce flexibility in the guise of process, or cynically cashing in on a trend? I don't know; all I do know is that Big Software switched from $old_process to Scrum around 2010-2012, and medium-sized companies seemed to follow in the middle of the decade.

Re:The age of Scrum is over by marcosdumay on Friday May 27, 2022 @04:44PM (#31534649)
I don't think "eventually" is the right word there. It immediately became dogma, and the one most used description about people's implementation of agile was always "you are doing it wrong".

Somehow the things in the Agile Manifesto never popularized, only those religions did.

Re:The age of Scrum is over by joshspankit on Friday May 27, 2022 @08:06PM (#31536355)
> I believe that stems from the fact that agile methods became too "productized"

While I agree that that’s an issue, I would argue that it stems from the fact that dynamic ideas are opposed to pragmatic ones (at least in the minds of pragmatists).

Inevitably in companies there are voices that say “we should mitigate risk”, “let’s do what worked before”, and other things that boil down to “don’t change things because I’m not good with change”.

It’s those types of people who productize everything that gains momentum as it’s a cycle of “This new thing is a threat”, “They tried it and it worked, I better change my tone or I’ll be ostracized”, “How can this be made rigid and safe?” “Oh excellent, there’s a certification program now: time to crack down now that I have a whip.”. And as they spend more company money on making it “safe”, the market responds and makes more “safe” products.

Re:The age of Scrum is over by pydry on Friday May 27, 2022 @05:32PM (#31535175)
If agile were christianity, scrum would be the catholic church - the institutionalized, rigid, dogmatic and hierarchical instantiation of the original vaguely specified & lovey dovey cult.
Re:The age of Scrum is over by urthor on Saturday May 28, 2022 @03:47AM (#31538419)
I agree.

The process itself is fine.

The issue is that the practitioners are none-too-adept managers and teams.

Making software is simply hard.

No amount of Scrum frameworks solves for staffing a project with a talent-less manager. Although Scrum does help for that scenario I'll be honest.

Re:The age of Scrum is over by adrianmsmith on Friday May 27, 2022 @04:00PM (#31534204)
> To me, Scrum has always been something of a paradox. The whole point of agile is to adapt the process to the team's needs - if you're doing dogmatic agile, you're not actually doing agile.

It seems to me that Scrum has "no true Scotsman" built right in to the model. If you criticize it, a Scrum practitioner can just reply "well, just adapt it to your needs then". Or if you hear of something too crazy a team is doing with Scrum because they adapted "well, they're not doing Scrum right".

Re:The age of Scrum is over by synu on Friday May 27, 2022 @04:01PM (#31534215)
They called it “scrum but”
Re:The age of Scrum is over by synu on Friday May 27, 2022 @04:00PM (#31534212)
The Kanban book by David Anderson was all about this, but it never caught on like Scrum did. If I’m feeling cynical I think its because there were no certifications to charge for and no strange new roles for middle managers.
Re:The age of Scrum is over by Silhouette on Friday May 27, 2022 @04:16PM (#31534390)
That is unfortunate indeed. The basic idea that you can run a software team by collecting a set of useful and moderately sized projects to do and then picking the most important ones to do first is reasonable enough. It's the extra process that goes way too far, full of formulaic time-wasting meetings and participants whose roles need silly names because no-one can explain or justify them on merit alone. But it's hard to sell tickets to a conference where the keynote speech is five minutes long and the same as last year.
Re:The age of Scrum is over by jacobr1 on Friday May 27, 2022 @07:46PM (#31536225)
We tried kanban with a few teams at my last startup. It worked great for a team with a clear direction, but was really hard from a management/planning/accountability standpoint. It didn't mesh well with the quarterly planning cycle the rest of the company aligned on. So we took some of the key tools (like WIP limits) but otherwise moved to scrumban type process. It was a bummer, because we had some solid data on increased productivity, but couldn't really deliver increased predictability (not that scrum was more predictable in-practice, it just seems that way)
Re:The age of Scrum is over by koreth1 on Saturday May 28, 2022 @04:54AM (#31538745)
> (not that scrum was more predictable in-practice, it just seems that way)

I use the phrase “the illusion of predictability” a lot when I talk about Scrum. Sadly, some people really cling to that illusion despite overwhelming evidence that it isn’t real.

Re:The age of Scrum is over by urthor on Saturday May 28, 2022 @03:50AM (#31538434)
Kanban isn't an externally facing interface. Quite honestly Scrum and story mapping isn't that good for a whole of company approach.

You need to use tools like OKRs and good old waterfall to manage multiple team projects.

Re:The age of Scrum is over by cupofpython on Friday May 27, 2022 @04:18PM (#31534414)
i dont think that is cynicism. ideas need to be commodified for corporate use or else HR / recruiting does not know what to do with it.
Re:The age of Scrum is over by avs733 on Friday May 27, 2022 @09:15PM (#31536716)
it has nothing to do with corporate use, it has to do with human use. Deep understanding of ideology just doesn't scale. You can look at any topic in nearly any field and the majority of users will reduce it to a set of heuristics and simple actions rather than understanding the foundational ideas from the most basic principles and building up to the why of actions - and then undertaking them within the an authentic respect for those principles.

Dealing with anything social, the rules don't self enforce - they aren't gravity.

Re:The age of Scrum is over by Jenk on Friday May 27, 2022 @05:02PM (#31534847)
One near constant thing I notice is that hardly anyone (_especially_ scrum certified folk) recognises that scrum, by design, makes it self redundant. Most think scrum is a final-state. A goal line.

It's not. Scrum is a training/introductory agile framework. There is an evolution to scrum built right into the framework that transforms it into not-scrum. The framework encourages moving from the initial (and what most orgs think is the final state of scrum) "Type A" where the team work in isolated timeboxes, with downtime between for planning etc. through "Type B" with preparation(s) for upcoming sprints, and feedback from previous sprints, overlapping the current sprint, to "Type C" with complete "just-in-time process" transformation where doing any given ceremony is done on-demand. And, crucially, it encourages evolving _beyond_ this.

Type C will be familiar to anyone practicing Kanban. Or dare I say, anyone with experience with "doing agile right" will have an experience matching what Type C describes.

Re:The age of Scrum is over by civilized on Friday May 27, 2022 @07:48PM (#31536238)
This helps me understand why this widely reviled thing, Scrum, might be useful. It separates planning and execution and tells you to do one at a time. Maybe that's useful for teams that are struggling to adaptively interweave the two. And maybe by mastering them separately, they could get a step closer to juggling them together.
Re:The age of Scrum is over by cuddlybacon on Friday May 27, 2022 @10:44PM (#31537159)
When I started my career, most teams at my company were doing waterfall. The team I was hired onto was one of a couple guinea pigs for scrum.

The other teams would spend 6 weeks doing nothing but planning activities. After the planning was done, they'd do a 12 month dev cycle. Once that was done they would throw what they have over the fence for the QA cycle.

That is the world scrum was introduced to. People already thought planning and separate and couldn't be mixed. Scrum dragged them closer to interweaving them. People resisted, saying it was reckless and unprofessional. They looked at this and thought "so the plan is we don't plan anymore? we just wing it?".

I think Agile has won enough that perhaps many specific processes meant to bridge the gap are now dragging people away from being more Agile.

Re:The age of Scrum is over by urthor on Saturday May 28, 2022 @03:49AM (#31538431)
Really, I don't think that old world approach changed much with Scrum.

The root cause is that most people are honestly not too amazing at this corporate teamwork thing.

External frameworks like Scrum can improve things 10-20%, maybe.

Re:The age of Scrum is over by deanCommie on Friday May 27, 2022 @04:00PM (#31534208)
In an age where tech workers have massive autonomy and respect, it might be difficult to remember WHY the original Agile manifesto was written.

Sure it talks about delivery, working software, and the like.

But a big motivator wasn't just "Craftsmen who want to do their craft more effectively", it was "Employees who are being abused by project managers, Gantt charts, and top-down waterfall death marches, who want to have sanity"

The part of 2-week sprints that says "deliver working software at the end" is just as important as the part that says "PMs can't introduce new scope into the sprint".

So the reality is It Depends on the company.

If you're lucky enough to be in a place where you have full control over your process to deliver software, Bottoms Up, Just-In-Time Process is the perfect attitude. But if management is enforcing archaic practices for no seemingly clear reason, the "rigid" nature of Scrum actually helps enforce a good way of doing things in a way that "traditional" management can reason about.

Re:The age of Scrum is over by Arcanum-XIII on Friday May 27, 2022 @07:01PM (#31535923)
And now we’re abused by velocity chart, retrospective about our failings, continuous change because we’re agile, under pressure all the time because of the two weeks « sprint » which end being a disguised death march…

So how is it any better?

Re:The age of Scrum is over by icedchai on Friday May 27, 2022 @08:08PM (#31536367)
I worked at a place where the managers did everything they could to close out all the points by end of sprint, no matter what. A co-worker is taking longer than expected, says there is no way he'll be done in couple of days... so we close out his story, declare it done, and open a new one in the next sprint for "testing", "deployment", or whatever it takes to claim the points and move something into the next sprint.

I found this truly sad. If you want accurate "velocity", you need to track it accurately. Our estimates were wrong.

Re:The age of Scrum is over by Too on Saturday May 28, 2022 @03:00AM (#31538209)
Seen exactly the same, sadly not just in one shop. Half completed stories would be split into part 1,2,3, or worse: renamed to "Attempt to implement...", just to make the burndown chart align at closure of sprint and give people the pleasure of dragging items to the done-column. Didn't get better when some higher up scrum master once had the brilliant idea that all stories should be max 2 story point large, otherwise need to be refined further. Together with a company-wide policy that a story point is roughly equal to one day, for all teams, because it made the high level jira dashboards easier to aggregate.

Not sure what it was meant for, since with this practice it would tautologically just show headcount * days in a sprint. More like time reporting rather than measure of progress.

Re:The age of Scrum is over by urthor on Saturday May 28, 2022 @03:53AM (#31538446)
The beautiful thing is there is a built into Scrum solution to this.

You alter estimation.

The fact story points are made up BS numbers means developers have full control over the velocity chart.

My favorite part of Scrum is it makes it IMPOSSIBLE to track velocity.

By making velocity IMPOSSIBLE to track, management MUST pivot to OKR lead management.

And OKR lead management is by far the best approach to software development.

Re:The age of Scrum is over by icedchai on Saturday May 28, 2022 @11:25AM (#31541002)
If your estimates are too crazy, you are forced to break them down into smaller tasks. This means lots of meetings. I think most engineers would rather have a bad estimate and "face the consequences" (generally not much), rather than put up with more meetings.

Can you describe "OKR lead management"? I am familiar with OKRs.

Re:The age of Scrum is over by HowTheStoryEnds on Saturday May 28, 2022 @03:10AM (#31538257)
And at the very least with waterfall they thought about their requirements, now it's: shove 3 sentences in a JIRA and off you go, clairvoyant developer!
Re:The age of Scrum is over by apocalyptic0n3 on Friday May 27, 2022 @05:13PM (#31534981)
> The whole point of agile is to adapt the process to the team's needs - if you're doing dogmatic agile, you're not actually doing agile. But what Scrum seems to add on top of the agile manifesto seems to be mainly dogma.

I oversee (i.e. just making sure they're running well and on schedule) a bunch of different project teams and this is a frequent debate I have with the leads on those projects. If x and y is working for you, but z isn't, why don't you meet with your team and adjust z to make it work with the project and, more specifically, your personnel better? The response is almost always "But then it's not Scrum." They get in this mindset that if they don't follow the Scrum workflow to a T, then they're failing as leaders. That the workflow should be a rock that you beat your team against until they conform to it. It's a struggle backing them down from that edge and convincing them that Scrum doesn't work in all (many) cases, but a few minor tweaks to it will make your team function more effectively pretty easily. A lot of them struggle to accept that the "few minor tweaks" is always different between projects and teams, too.

Retros are essential for running an effective agile workflow, whether it be Scrum, Kanban, near-Scrum, or something else. You need to take a step back, view the process from the outside with your team, and figure out how to more effectively function going forward. Trying to appease the Scrum gods or your manager by adhering to every single character of Scrum as if it is scripture doesn't make any project better, in my opinion. Everything has to be flexible to some extent, including you, your team, and your processes.

Re:The age of Scrum is over by andrekandre on Friday May 27, 2022 @07:25PM (#31536077)

  > Retros are essential for running an effective agile workflow
retros are very difficult to get right: many issues brought up cant be fixed by those attending (company policies, group okrs, platform issues, immovable deadlines etc), so the result many times is either self-flagellation or "improvement plans" that don't go anywhere... the end result being even more demotivating for a team....

if retros arent going to be effective at real improvement, then its better not to do them imo*

*there are other ways to improve teamwork/processes anyways

Re:The age of Scrum is over by icedchai on Friday May 27, 2022 @08:04PM (#31536340)
I've been in software development for just over 25 years. "Scrum" didn't start becoming a major thing until 2010-ish. Since that time, I could count the number of useful "retros" on one hand. It is almost always a waste of time.

"What should we stop doing?" "This." (The retro.)

Re:The age of Scrum is over by siva7 on Saturday May 28, 2022 @01:29AM (#31537852)
Seems more like you never experienced a good scrum process. The retros were one of the most valuable things that always resulted in concrete actions taken otherwise i agree that it would be a waste of time.
Re:The age of Scrum is over by apocalyptic0n3 on Friday May 27, 2022 @07:36PM (#31536151)
Yeah, that's fair. I guess "Effective retros are essential" would be more accurate. It's just like any other step of the process: if the retro isn't working, figure out a different way to get the feedback. Nothing needs to be set in stone. You pick a starting point (i.e. Scrum + Retros) and make changes until things work as well as you need them to.
Re:The age of Scrum is over by bluGill on Friday May 27, 2022 @07:56PM (#31536294)
My team always puts a 'general complainy pants' column on our retros so we can acknowledge things we have no control over and move to things we can.
Re:The age of Scrum is over by mxuribe on Friday May 27, 2022 @04:13PM (#31534350)
I see it similarly! A team should leverage only what helps it, and no more. In fact, i have quoted to teams (that are thinking how to adopt agile, scrum, whatever) some lines from Bruce Lee's Jeet Kune Do: "...I hope to free my followers from clinging to styles, patterns, or molds. Remember that Jeet Kune Do is merely a name used, a mirror in which to see "ourselves"...Jeet Kune Do is not an organized institution that one can be a member of...Again let me remind you Jeet Kune Do is just a name used, a boat to get one across, and once across it is to be discarded and not to be carried on one's back..." Some teams get it, while others just follow what a paid consultant suggested (based on tech zeitgeist).
Re:The age of Scrum is over by tomohawk on Saturday May 28, 2022 @06:15AM (#31539087)
I was trained by the originator of scrum. In the training, this was repeatedly stated as one of the main dangers to avoid. What I got out of it is that scrum is a model, and it is up to a team to iteratively figure out how to apply that model to their situation. It gives a team a framework to manage change.

For example, the scrum model talks about a product owner. The cargo cultists insist that this needs to be a single person, with title of Product Owner. Yeech!

The reality is that the product owner could be a single person, or could model an entire organization that is developing requirements. What the scrum team needs is for these requirements to be made known to them in an orderly manner, and enough autonomy to have a reasonable discussion about them (how realistic they are, the cost, etc).

I've seen a lot of cargo cult scrum failures, and I've seen a lot of actual scrum successes. Over time, the cargo cultists have become the majority, though. That is a shame.

Re:The age of Scrum is over by kkfx on Saturday May 28, 2022 @10:42AM (#31540713)
IMVHO the whole point is that someone have badly misunderstood Toyoda method and have hoped we can do creative work like an industrial production in the assembly line, so someone have adapted assembly line methods from '900 mechanical industry to modern IT and made much of the mess we see around with crap layered on crap layered on other crap and no one have a clue of what's up in general.

That's is. SCRUM is an emergency mode operation technique that might work to sort out standard things, definitively not creating something new.

Re:The age of Scrum is over by aryehof on Saturday May 28, 2022 @12:53PM (#31541815)
> The whole point of agile is to adapt the process to the team's needs

I would argue that’s not the point at all. Instead I would argue that its point is short iterative simple process development based on constant stakeholder feedback.

I suggest that many undertaking “Scrum” are simply kidding themselves that their modern day process focussed development is “agile” at all. Heavy process iterative development preceded the “agile” movement and is back under a new name… “Scrum”.

Re:The age of Scrum is over by rmrk on Friday May 27, 2022 @07:48PM (#31536240)
in 5 years we'll see the posts titled "Just-In-Time Process is awful, terrible and inflexible"
Re:The age of Scrum is over by ignoramous on Friday May 27, 2022 @05:09PM (#31534930)
> ...team should have only the processes in exactly the amounts that provide value to the team, and no more.

It is interesting to go to the origins of scrum and its emphasis on the team and team-work for high-quality, low-cost product development.

> ...companies in Japan and the United States are using a holistic method — as in rugby, the ball gets passed within the team as it moves as a unit up the field. This holistic approach has six characteristics: built-in instability, self-organizing project teams, overlapping development phases, 'multilearning,' subtle control, and organizational transfer of learning. The six pieces fit together like a jigsaw puzzle, forming a fast flexible process for new product development.

A radical scruffy setup that challenges both the status quo and the leadership of an org rather than confirm to any set processes and workflows.

https://hbr.org/2016/04/the-secret-history-of-agile-innovati...

---

Some more snipped excerpts:

> ...under the new approach (in its extreme form) nonexperts undertake product development. They are encouraged to acquire the necessary knowledge and skills on the job. Unlike the experts, who cannot tolerate mistakes even 1% of the time, the nonexperts are willing to challenge the status quo. But to do so, they must accumulate knowledge from across all areas of management, across different levels of the organization, functional specializations, and even organizational boundaries. Such learning in breadth serves as the necessary condition for shared division of labor to function effectively.

> A project team consisting of members with varying functional specializations, thought processes, and behavior patterns carries out new product development. While selecting a diverse team is crucial, it isn’t until the members start to interact that cross-fertilization actually takes place.

> Selecting the right people for the project team while monitoring shifts in group dynamics and adding or dropping members when necessary. Creating an open work environment. Encouraging engineers to go out into the field and listen to what customers and dealers have to say. Establishing an evaluation and reward system based on group performance. Managing the differences in rhythm throughout the development process. Tolerating and anticipating mistakes. Encouraging suppliers to become self-organizing. Involving them early during design is a step in the right direction. But the project team should refrain from telling suppliers what to do.

> Headquarters' involvement is limited to providing guidance, money, and moral support at the outset. On a day-to-day basis, top management seldom intervenes; the team is free to set its own direction. In a way, top management acts as a venture capitalist. Or as one executive said, 'We open up our purse but keep our mouth closed.'

> Top management kicks off the development process by signaling a broad goal or a general strategic direction. It rarely hands out a clear-cut new product concept or a specific work plan.

> Starting with the guidelines set forth by top management, [the team begins] to establish their own goals and keep on elevating them throughout the development process. By pursuing what appear at first to be contradictory goals, they devise ways to override the status quo and make the big discovery.

Re:The age of Scrum is over by ignoramous on Sunday May 29, 2022 @04:20AM (#31547434)