The issue the UK has as far as I'm concerned is that we have a political and managerial class who are basically disinterested in the grand scale.
We don't spend much money, we try to shelve what little we do spend (e.g. we have two aircraft carriers rather than the one that was rumoured for a while, has the world blow up?), Our government is one of the happiest to sell off state assets ever, and now our current government ran out of ideological steam about 7 years ago so we are stuck with a collection of lunatics and retards in power.
I used to be pretty firmly in the "don't tell people they're voting against their own interests" camp, but I was wrong. Our electorate is given a sword to fall on (FPTP), but chooses to jump on the sword rather than make a fuss.
Also in my experience the human aspect of projects is always the most difficult part. The most amazing thing about a company like SpaceX is not the technical achievement. But getting thousands of people to work together on a single goal. And arguably this kind of thing is less problematic in large projects than in the rest of society. But the effects of bad communication is far more visible and explicit. Engineering cuts through and delivers because it actually simplifies things.
On what basis? They've scaled down HS2 and the Northern Rail Plan. Smart motorways is purely a way to avoid expensive, complicated, often necessary road widening with an unsafe technological solution. A lot of the safety issues of smart motorways has also been due to cutting costs - less frequent emergency refuge areas, less cameras than are needed to detect accidents. Now the press has caught up to them they have stopped rolling them out entirely.
I agree that smart motorways are less safe, and there are better ways to reduce demand (like road pricing). Having said that motorways are still very safe compared to other roads, even after being made "smart". I think a modest reduction in safety is an acceptable price to pay if billions can be saved. Invest that money in reducing death from emissions, pedestrian safety, or even our far less safe A road network.
Maybe they’re great at building, poor at scheduling. If they’d +4 year’ed the initial timeline, they’d be “on time”?
We see this in the world of IT. A team will be set an X month timeline by a sponsor who is well in the knowledge that it will take Y months, but who strongly hold some belief (which I do not share) that giving less time, which will have to be extended through painful negotiation, will result in a shorter timeframe than if they’d given Y months expectation.
For major projects like Crossrail you also run into the politics of it. Politicians are short term incentivised. They have budget cycles. etc.