https://www.sciencedirect.com/science/article/abs/pii/S03014...
There's huge huge risk in choosing a particular design and building even one of it, because we don't know if it will be constructible the first time, and we don't know if future builds of the first design will be more or less expensive.
When each build is a $10B roll of the dice with variance of 2-3x of initial estimates, it's a bit difficult to find rational financial backers. Especially when there's not that much profit to be had from even a successful build. The risk reward is completely out of whack compared to the other options for carbon neutral energy.
Far too many people are generalizing from the French and American nuclear programs, both of which built lots of reactors in a comparatively short time and then were fear-mongered into a standstill by the fossil fuel lobby.
https://www.sciencedirect.com/science/article/pii/S030142151...
"""In the third era of nuclear power construction in Japan, from 1980 to 2007, costs remain between ¥250,000/kW and ¥400,000/kW, representing an annual change of −1% to 1%. This period experienced relatively stable costs over 27 years."""
1970s nuclear safety standards, despite it all, were still better than the energy strategy the world adopted from 1970-2020. Killing off nuclear in search of a perfect power system was a stupid strategy, and failed. The only unfortunate point of karmic justice is that Europe ended up reliant on Russian gas and in an energy crisis as a reward for their stubbornness against making the technically obvious choice.
Well done Finland for even managing to get a reactor built in the face of all that.
Maybe you have some actual knowledge, but I have never found somebody who says that regulations are the problem but has any concrete suggestions for changing regulations. It's just a vague gut feeling. And in the case of France I doubt it applies at all.
Construction is not like manufacturing, it does not see continual productivity improvements like manufacturing does:
https://www.nist.gov/publications/measuring-and-improving-us...
As an energy source whose costs are primarily construction related, we would not expect to see it falling in cost over time. We would expect that energy sources whose costs are dominated by manufacturing to outcompete nuclear as time passes.
If they'd acted rationally, acknowledged Fukushima and moved on with trying to make their nuclear power cheaper instead letting ideology determine that part of their energy policy then they wouldn't be in the mess they are in. Instead they pushed ahead with renewables, ignored technical problems like reliability and have ended up looking like fools while literally paying a high price for the privilege. France continues to quietly plod away as a reliable European energy success story.
In France nuke-power is backed by gas (which produced 7.5% of the gridpower in 2020).
The sole reactor currently planned (Flamanville-3) is a complete disaster, more than 12 years behind schedule, it will cost at least 19.4 billion € (initial budget: 3.7 billion €).
It would be great to see an attempt to such battery solution that would cover the same amount of capacity as this plant, that can operate for at least several months without recharging, in Finish winter, and cost less than this plant and be built faster. That would check all the boxes, and if such technology already exist, people here should really put their investment money into it.
I don't think there is any reason to think it will be different for future ones if any. We'll see what happens for the British one (Hinkley Point C), but they already know there will be large delays and cost overrun.
Nuclear is just too big for a privatized energy market’s participants.
For me even seeing the Tesla Berlin factory delays makes me sad: in China already the second factory is being built while Germany is coming up with new arguments without looking at the cost/benefit ratio for EU of those delays.
Sadly NuScale seems to be struggling to meet timeline and cost targets, and there were some headlines last year about the sponsoring utility pulling out of the project. I'm rooting for them but it doesn't look good.
The RR project is still just on paper really, and is closer to a medium sized reactor than SMR. Maybe they've cracked the code? Maybe not, we'll see.
Every nuclear thread here people chime in with a reflexive "just build nuclear smarter" answer without actually addressing why every prior attempt at this has failed. A lot of people don't want to develop an understanding of the challenges more sophisticated than smugly blaming environmental activists, over regulation, etc.
Look at these projects from the prospective of potential private investment. Anyone doing basic due diligence is going to realize that the odds are stacked against a project hitting it's time and cost goals. Then you look at the trend lines for levelized cost of renewables + storage, and you realize that even in the best case scenario, within 2 decades you may be squeezed out of the market even if the efficiencies of scale and learning kick in.
Yup, exactly: And then there is a huge stink about this and no more are built for a good while, so the next one is a first one again. Over and over and over. Lather, rinse, repeat, repeat, repeat, repeat...