Far too many people are generalizing from the French and American nuclear programs, both of which built lots of reactors in a comparatively short time and then were fear-mongered into a standstill by the fossil fuel lobby.
https://www.sciencedirect.com/science/article/pii/S030142151...
"""In the third era of nuclear power construction in Japan, from 1980 to 2007, costs remain between ¥250,000/kW and ¥400,000/kW, representing an annual change of −1% to 1%. This period experienced relatively stable costs over 27 years."""
1970s nuclear safety standards, despite it all, were still better than the energy strategy the world adopted from 1970-2020. Killing off nuclear in search of a perfect power system was a stupid strategy, and failed. The only unfortunate point of karmic justice is that Europe ended up reliant on Russian gas and in an energy crisis as a reward for their stubbornness against making the technically obvious choice.
Well done Finland for even managing to get a reactor built in the face of all that.
Maybe you have some actual knowledge, but I have never found somebody who says that regulations are the problem but has any concrete suggestions for changing regulations. It's just a vague gut feeling. And in the case of France I doubt it applies at all.
Construction is not like manufacturing, it does not see continual productivity improvements like manufacturing does:
https://www.nist.gov/publications/measuring-and-improving-us...
As an energy source whose costs are primarily construction related, we would not expect to see it falling in cost over time. We would expect that energy sources whose costs are dominated by manufacturing to outcompete nuclear as time passes.
If they'd acted rationally, acknowledged Fukushima and moved on with trying to make their nuclear power cheaper instead letting ideology determine that part of their energy policy then they wouldn't be in the mess they are in. Instead they pushed ahead with renewables, ignored technical problems like reliability and have ended up looking like fools while literally paying a high price for the privilege. France continues to quietly plod away as a reliable European energy success story.
In France nuke-power is backed by gas (which produced 7.5% of the gridpower in 2020).
The sole reactor currently planned (Flamanville-3) is a complete disaster, more than 12 years behind schedule, it will cost at least 19.4 billion € (initial budget: 3.7 billion €).
It would be great to see an attempt to such battery solution that would cover the same amount of capacity as this plant, that can operate for at least several months without recharging, in Finish winter, and cost less than this plant and be built faster. That would check all the boxes, and if such technology already exist, people here should really put their investment money into it.
https://www.sciencedirect.com/science/article/abs/pii/S03014...
There's huge huge risk in choosing a particular design and building even one of it, because we don't know if it will be constructible the first time, and we don't know if future builds of the first design will be more or less expensive.
When each build is a $10B roll of the dice with variance of 2-3x of initial estimates, it's a bit difficult to find rational financial backers. Especially when there's not that much profit to be had from even a successful build. The risk reward is completely out of whack compared to the other options for carbon neutral energy.