> In December 1998, an INES Level 2 incident occurred after severe winds and sea spray disabled all four power lines to the site during the Boxing Day Storm of 1998. After multiple grid failures in a short period of time, emergency diesel generators failed to start. Normally, in the absence of power for the reactor cooling pumps, the reactor would be passively cooled. However, the emergency control system which would have initiated passive cooling failed to act, as it had not been reset. Reactor cooling was reinstated after four hours.
It seems the safety margin was twenty hours of no reactor cooling.
Wikipedia: https://en.wikipedia.org/wiki/Hunterston_B_nuclear_power_sta...
So there was probably one or more valves that did not get switched, as the system somehow didn't think they needed to, due to something not being configured as they should.
A similar thing happens in Alaska. The largest grid there, the Railbelt grid, has an average power flow of just 600 MW.
https://www.youtube.com/watch?v=62ASvupr8Zg
It's a massive logistics challenge and it would require an unprecedented level of cooperation between Saharan nations and given how unstable the region is as of current... I'm afraid it's not happening for another 30-50 years, when climate change will probably corner these countries or their rich neighbors living further north. That being said, Australia is a better candidate to this due to it being a single country and a very stable one at that...
Once Australia proves the concept, Africans can follow suit, and we'll build solar arrays over the oceans, and then we'll become a type 1 civilization.
https://www.dfat.gov.au/about-us/publications/trade-investme...
For over 50 years now France has been corrupting those countries' elites at the expense of more than 90% of the population. For 50 years those countries' cooperation level with each other have been hindered and their industries dilapidated to keep them poor and dependent from Europe or outside aid. Dictators have already been put in place (like how can anyone even stay in power for 25 years with nobody batting an eye despite the country lagging behind in everything?) to pillage the regions economic resources and pollute their soil, especially uranium and other metals.
Do you really think it'd be internationally acceptable to commit a massive genocidal war after what Nazi Germany had done to Jewish Europeans eight decades prior?
Overthrowing the established governments is only going to make matters worse. Just see how much of a mess Libya is right now, 10 years after Gaddafi died. French civil aircrafts still won't even fly over it.
https://xlinks.co/morocco-uk-power-project/ ?
(Give it time, it loads slowly. Maybe refresh after a minute, or so.)
I want people to start imagining what innovation in Nuclear can look like again. If you want to compare current state to current state, then neither are going to move the needle enough. But let's imagine what can be possible, especially if we poured in the same tax dollars and incentives to Nuclear as we are with renewables. We don't have to imagine that we will be decommissioning the same honking reactors from the 50s, 60s, and 70s. Let's imagine what's possible with next-gen plants.
We do. Modern nuclear plants (for example, Hinkley Point C in the UK) receive enormous subsidies. Far more than renewables projects (eg: offshore wind farms) get on a per-MWh-generated basis.
Or to put it another way, each $/£/€ invested in renewables generates a lot more clean energy more quickly than if that some money goes into nuclear.
That doesn’t mean we shouldn’t be funding nuclear research and trying new things, but for now it’s hard to justify building new nuclear plants when better alternatives with better economics/ROI are available.
[0] https://upload.wikimedia.org/wikipedia/commons/0/06/Too_much...
All this is current tech for both. And honestly, solar panel and energy storage technology improvements are already coming down the pipeline whereas the next-gen nuclear has been "almost ready" for decades.
The picture for most renewables as a fossil energy replacement is much rosier, even considering the generation profile problems that some renewables present.
I'd be happy for there to be some amount of investment in new nuclear builds, just to maybe prove me wrong, but right now it seems like a good thing nuclear is not much of a focus.
Nuclear is going to stick around, but at best we can start building today’s designs and have them finished in a few years. It’s simply to late for any significant R&D effort to pay off, we needed better designs a decade ago for them to be proven reliable today and then ramp up production for 3-5 years from now. It’s not even just building nuclear stuff that’s slow, the Navy has a solid track record and trains people quickly but even that takes time.
Another aspect that should not be ignored are the efficiency gains of producing electricity close to where it is used by e.g. roof top solar
The rest is Gas, which has become very expensive this winter. And Coal.
We would need to invest into power-to-gas like crazy if we wanted any shot of providing a base load.
But sadly it went slightly up from 24% to 24,5% in 2020 (don't have the source at hand right now for this second statistic).
Are they? I was under the impression they required some sort of subsidy and/or restrictions on natural gas production to be competitive.
- This wasn't just "a single Tsunami", it was the Tsunami resulting from the 4th largest earthquake ever recorded happening just a few hundred km away.
- The design of the plant was really old - construction began only 33 years after the death of Marie Curie, and the design was older than that.
The effects of the disaster are absolutely terrible, and we should definitely make sure it doesn't happen again - but we should also not ignore that more modern plants don't have the same design flaws, and that events with enough destructive force to shift the entire planet on its axis by 10-25cm are not common (and if they become so, we have additional problems).
That's the point, though, isn't it? One of the richest and most developed nations failed to decommission the plant in a timely manner, even under excellent conditions, in order to save costs. It's not the technology that's the problem.
I understand that single incidents are more visible than long-term low-level harm. But as a civilisation we really aren't paying enough attention to the overall cost of everything that's not nuclear.
https://e360.yale.edu/features/three-myths-about-renewable-e...
https://medium.com/enrique-dans/can-we-put-the-solar-and-win...
Renewables get exactly as much credit for what might happen in future as Communists or NFT sellers get for how awesome their plans are. Nuclear already delivered, in some places still does, winter heat. Its detractors are responsible for gas reliance.
It’s also not weather-independent. When the water temperature is too hot the power stations have to be turned off.
Further it’s pretty common that when one reactor has an issue others of the same type will get turned off too to check if they have the same issue.
Also, I don't think passive safety of CANDU is what's meant by passive safety of HTGRs. The latter can survive losing cooling and everyone just walking away (in theory); I suspect the CANDU melts down in that situation, even if the chain reaction does stop.
Don't forget, either: Nuclear waste isn't just spent fuel. The reactor core remains radioactive after the plant is decommissioned.
That's one of the things that nuclear fusion proponents seem to forget. Even without the spent fuel problem, fusion reactors still produce nuclear waste.
Now, currently we are building solar farms in desert areas for ~1.5 cent per kWh. Including both CAPEX and OPEX. On-shore wind is built at ~3 cents per kWh and ~6 cents per kWh for off-shore.
This is where the explosion of renewables is coming from, they currently undercut the marginal cost of traditional power sources.
https://www.oeb.ca/consumer-information-and-protection/elect...
That was sadly not an unknown at all. TEPCO was definitely aware of the possibility given that flooding in the generator rooms had happened before, and they deliberately ignored studies finding they were not prepared for a tsunami.
https://en.wikipedia.org/wiki/Fukushima_nuclear_disaster#Pri...
> in addition to the grid connection, there are four twelve megawatt diesel generator stations spaced around each corner of the plant -- each with two generators, any one of which is able to provide operating power to keep the reactor's safety systems working.
Unfortunately for Fukushima, all generators were flooded by a single Tsunami. What are the odds of an unknown event that will affect all generators? Think of EMP, contaminated fuel, a large cloud of C)2 suffocating the engines... All seem highly unlikely, but how do you plan for the unknown unknowns?
The most likely (and I think underestimated) risk for Nuclear plants is a systemic change due to a large (climate?) crisis and/or war. Think of the collapse of the Soviet Union, that definitely increased risk and reduced maintenance budget for a few Nuclear plants. Any significant sea level rise, drought or flood could very well trigger such events (even if the reactor is not affected directly, the society around it will be). That is why I think nuclear is a risky option to reach net-zero; every plant you build is a bet on the future stability of society for at least 75 years (time until the plant will be safely decommissioned by future generations). I would feel much safer in a world covered in solar panels, wind turbines and transmission lines (and highly variable spot pricing) than in one with nuclear plants that require constant care by experts and that even in the best case incur a huge cost on society to safely decommission.
> In 2016 the European Commission assessed that European Union's nuclear decommissioning liabilities were seriously underfunded by about 118 billion euros, with only 150 billion euros of earmarked assets to cover 268 billion euros of expected decommissioning costs covering both dismantling of nuclear plants and storage of radioactive parts and waste. France had the largest shortfall with only 23 billion euros of earmarked assets to cover 74 billion euros of expected costs [1]
[1] https://en.wikipedia.org/wiki/Nuclear_decommissioning