Re:This electrical transmission tower has a problem by throwaway189262 on Wednesday September 16, 2020 @11:10PM (#24500780)
Interesting. I'm kinda sympathetic to PG&E on this though. These big lines don't have much under them, inspection is by helicopter, and the lines cannot be shut down. I would not be surprised if "fix it when it breaks" is a nationwide phenomenon for high tension lines.

What makes it bad is how fire-prone California is. I'm of the opinion that humans should not be living in areas that burn regularly. And in PG&E's defense I doubt anyone was living near the lines when they were built 100 years ago.

If forest fire was an acceptable outcome of line failure 100 years ago when the lines were built, is it PG&E's fault that tons of people moved into this fire prone area? In my mind the cities nearby should have paid them to make the lines safer. To me this is like the people that move near a concert hall then complain that it's loud. Or move to a floodplain and complain when it floods...

It seems like it's been known that these lines were a fire risk for a very long time, and cities should have paid to make them safer before zoning so much land for residential. I assume, but cannot prove, that PG&E probably enumerated the risks when the land was sold or rezoned but their concerns were ignored. Having done a study on the wear of the hooks themselves, it seems unlikely they would not have notified communities nearby of the risk. My prediction is that they start to point fingers at the government, but people continue to sue the power company because sueing the government is hard.

Re:This electrical transmission tower has a problem by akira2501 on Wednesday September 16, 2020 @11:22PM (#24500855)
> and the lines cannot be shut down.

Of course they can. A failure is an unplanned shutdown, and I doubt that leads to better outcomes than a planned shutdown. Also this thread demonstrates that PG&E replaced _other_ parts of the same tower.

> I'm of the opinion that humans should not be living in areas that burn regularly.

I'm of the opinion that climate change makes this a moving target, and this is simply one of the obvious repercussions.

> is it PG&E's fault that tons of people moved into this fire prone area?

No, it's their fault that even though they made $550 million in profits in 2018, and made other improvements to these towers, they still failed to keep them in proper repair. Also, it's not always "fire-prone." California experienced a bit of drought in 2018.

> and cities should have paid to make them safer

Shouldn't the company making $550 million in profits pay to make them safer?

Re:This electrical transmission tower has a problem by xyzzyz on Thursday September 17, 2020 @12:11AM (#24501115)
If California doesn't like PG&E making $550M profit, and would like PG&E spend more on maintenance, it should set lower profit target, and allow PG&E spend more money on maintenance. PG&E operates based on decisions of California Public Utilities Commission, which decides, among other things, how much money PG&E is allowed to make, and how much it is allowed to spend on maintenance. Here's what it looks like: https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M102/K...

PG&E would love to spend more money on maintenance. It doesn't cut into their profits, because their expenses and profits are set by state government commission anyway. Of course, the government commission has some incentive to keep the rate low, to make citizens happy, which makes it limit how much money PG&E can make and spend.

The above is not meant to imply that if PG&E worked like any normal company, they'd maintain their shit better -- I have no idea if they would. However, in the current regime, where CPUC exercises so much control over what PG&E does and how much money it makes and spends, the blame cannot be solely placed on PG&E side.

Re:This electrical transmission tower has a problem by laumars on Thursday September 17, 2020 @02:26AM (#24501761)
Why is it people will argue that there should be fewer regulations to allow companies more freedom to operate but when those companies, unsurprisingly, put money ahead of safety, it’s then the government’s fault for not regulating those companies?

At some point companies need to take responsibility and be held accountable for their (in)actions. I know this is an unpopular opinion for HN, given its venture funding roots, but companies shouldn’t be given a free pass every time they screw up due to placing greed above all else.

Re:This electrical transmission tower has a problem by xyzzyz on Thursday September 17, 2020 @02:57AM (#24501900)
I don’t think you understood my comment. PG&E is as regulated as you can possibly get without literally being part of government. When PG&E wants to spend $100M on maintenance, it has to ask government for permission, and CPUC needs to approve this expense.

My point here is not to argue that with less regulation, PG&E would do better job when it comes to maintenance — I don’t know if it would. However, considering how deeply regulated it actually is, and how much the regulator controls everything it does, some blame must also be placed on the regulator’s side.

Re:This electrical transmission tower has a problem by Dylan16807 on Thursday September 17, 2020 @03:55AM (#24502176)
> When PG&E wants to spend $100M on maintenance, it has to ask government for permission, and CPUC needs to approve this expense.

...and did they ask? It's their job to ask. You can't blame the oversight organization's interference if it didn't interfere.

Re:This electrical transmission tower has a problem by setum on Thursday September 17, 2020 @05:24AM (#24502640)
If you have to ask a government committee every time you go to washroom, you will notice a significant drop in your washroom visits.
Re:This electrical transmission tower has a problem by kixiQu on Thursday September 17, 2020 @07:48AM (#24503451)
if people die when I stop going to the washroom, I am willing to evaluate the idea that I may have some culpability in deciding to not do that
Re:This electrical transmission tower has a problem by Dylan16807 on Thursday September 17, 2020 @04:45PM (#24509758)
Getting approval once per campaign, or maybe every few months, is pretty different from petty micromanagment.
Re:This electrical transmission tower has a problem by thu2111 on Thursday September 17, 2020 @04:50AM (#24502461)
There's definitely an observable issue with Californian electricity supplies being significantly worse than in other parts of the world, which have more liberalised transmission operator firms.
Re:This electrical transmission tower has a problem by laumars on Thursday September 17, 2020 @06:23AM (#24502907)
Is it more liberalised in other parts of the world though? That’s not usually the case for Europe and China (the next two biggest global economies). Perhaps it might be true specifically with regards to electricity supply but I would be very surprised if that were the case knowing how the U.K. likes to regulate similar services which I have directly been employed by.
Re:This electrical transmission tower has a problem by dragonwriter on Thursday September 17, 2020 @01:11AM (#24501403)
> PG&E would love to spend more money on maintenance

Yeah, their series of felony convictions for violating the law regarding maintenance, and obstructing investigations into those failures, tells a very different story.

Re:This electrical transmission tower has a problem by cskinner on Thursday September 17, 2020 @03:52AM (#24502159)
IMO, this is the most important comment here (so far) in understanding the investment & maintenance decision making and constaints of PG&E.

From the linked CPUC Decision Making in the above comment, there are multiple examples where PG&E have advocated for increased spending for safety purposes, but organisations such as the Division of Ratepayer Advocates and The Utility Reform Network were pushing back. Ultimately, however, it is the CPUC that weighs the arguments of the different parties and determines allowable spending.

Re:This electrical transmission tower has a problem by senux on Thursday September 17, 2020 @03:09AM (#24501958)
> PG&E operates based on decisions of California Public Utilities Commission...

As clarification, your statement makes it sound like CPUC makes unilateral decisions about what PG&E can or cannot do when, in fact, CPUC makes those decisions based on requests made by PG&E. While CPUC does have a certain level of decision making power, a lot of their decisions are made based on what PG&E says is the right/necessary thing to do.

Re:This electrical transmission tower has a problem by zzapplezz on Thursday September 17, 2020 @01:06AM (#24501377)
> If California doesn't like PG&E making ... profit.. it should set lower profit target, and allow PG&E spend more money on maintenance

Who makes decisions at the CPUC? It's a self-fulfilling prophecy. This is circular logic.

Re:This electrical transmission tower has a problem by rayiner on Thursday September 17, 2020 @01:59AM (#24501655)
Political appointees who have enormous incentives to keep electricity prices as low as possible.
Re:This electrical transmission tower has a problem by pmalynin on Thursday September 17, 2020 @03:10AM (#24501961)
And yet California has one of the highest electricity costs in the country. Things definitely don’t add up.
Re:This electrical transmission tower has a problem by LeifCarrotson on Thursday September 17, 2020 @12:33PM (#24506733)
I wish this attitude towards planned and unplanned shutdowns was more common.

I'm not an infrastructure professional, I'm in automation and manufacturing, but all too often I come across equipment that must never be shut down and must be functional 100% of the time, but which has been run long past its service life. Windows 98 or XP computers on their 9th resurrection due to parts from eBay, castings full of helicoils, electrical cabinets with wires strung across like cobwebs... If the business was successful before the machine was built, downtime now costs tens of thousands of dollars per hour, and the whole machine cost 500,000 dollars 100,000 hours ago, maybe someone should start thinking about building a replacement (or, better, a pair of replacements) and phasing this one out?

I know the front office likes to write off machine depreciation as a tax deduction. With a 10 year useful life on a $500k machine, you get $50k in tax deductions. In the 11th year, you get no tax deduction, but the machine is still making money.

I feel strongly that there ought to be some kind of financial penalty for operating a machine that's depreciated beyond its claimed useful life - not a direct tax penalty, but some kind of non-cash-expense liability that subtracts from the big positive number on the front page of the quarterly financials which the CEO uses to claim they deserve a bonus.

PG&E's more regulated than just painting them as a for-profit business with $550M in the black would suggest. They have maintenance and capital expenditures that they need to make. But those regulated books didn't show the single-point-of-failure risks and long-past-useful-life liabilities, and they should!

Re:This electrical transmission tower has a problem by thatguy0900 on Thursday September 17, 2020 @05:26PM (#24510150)
Incentivising companies to throw away equipment that still works sounds like a terrible environmental policy
Re:This electrical transmission tower has a problem by eric-hu on Friday September 18, 2020 @02:55AM (#24513723)
That depends on how you look at it. In the case of this thread, is it better for the environment that PGE continues using 100 year old electricity towers and saves the resources (metals, fuel, labor) necessary to replace them? Or is it better that such massive fires are reduced in frequency?
Re:This electrical transmission tower has a problem by thatguy0900 on Friday September 18, 2020 @08:48AM (#24515993)
I think it's hard to take the example of a poorly maintained electric tower in the middle of a poorly managed forest and extend that to all electronics a company uses. The comment I was replying to talks about windows computers, castings, and standard electrical panels.
Re:This electrical transmission tower has a problem by kempbellt on Thursday September 17, 2020 @12:54AM (#24501309)
>Of course they can. A failure is an unplanned shutdown

A pedantically accurate retort, but ignores the real point.

Shutting down these lines for "inspection" is not feasible. These lines are the backbone of a grid that millions of people and services rely on 24/7/365, and there is zero redundancy. They are responsible for delivering power to hospitals, traffic lights, schools, airports, grocery stores, homes, businesses, and the list goes on.

Telling people "We need to turn off your power for a couple days every couple months for inspections" is going to create a lot of backlash, no matter how good the reason.

Also, the lines in question aren't like closing a two lane road in a small neighborhood for a couple hours where a few annoyed people can take alternate routes. It's more like shutting down all the freeways in a major city for a day just so that the DOT can finally get some street sweeping done. Good luck not starting a riot.

The problem is, these systems are old, too many people rely on them, and there is no redundancy.

If we want to take a step towards fixing the problem, the best start is to create redundancy for power supply to consumers, imo. Preferably more localized power generation via wind/solar/etc with some localized power storage.

Also, their profit margin for one year is not a fair argument towards them being at fault. Economics of public companies are about a lot more than "We made extra money, so we should have just spent it on making our product better". If shareholders don't make money in a company, they pull their investments. You pull enough investments in PG&E, that means they have to cut costs. Meaning, less money for inspections and improvements to the grid.

Economics at scale is not a black-and-white, napkin math, solvable problem.

Re:This electrical transmission tower has a problem by akira2501 on Thursday September 17, 2020 @01:35AM (#24501538)
> Telling people "We need to turn off your power for a couple days every couple months for inspections" is going to create a lot of backlash, no matter how good the reason.

They were happy to tell people "We need to turn off your power for a couple of days because of wind." Granted, in this particular case, they weren't talking about the 115kV line that ultimately caused the fire.

To me, this just further highlights their "run it till it breaks" philosophy. This becomes a little more obvious when you read their plans for fixing this mess, and it involves a dual-circuit transmissions system. So, you can literally shut half of it down without completely stopping power.

It's also not impossible to serve one neighborhood with two power lines, in fact it's quite common.

> Also, the lines in question aren't like closing a two lane road in a small neighborhood

It is a single 115kV line. That's exactly like what it is. For the rest of the state your analogy falls apart because there is a significant amount of redundancy and additional capacity that can be used to route power. For example, lookup "Path 46" and the "Pacific DC Intertie." Which is interesting in it's own right because it can be run in two different modes, one for nearly double the power capacity in certain conditions.

> The problem is, these systems are old, too many people rely on them, and there is no redundancy.

The California regulator has been asleep at the switch here, and they do share some culpability, but again.. it's not impossible to design around this constraint. You're going to pay twice as much for aluminum and nearly twice as much for everything else, but it's not impossible to solve. Just no one wanted to and no one was going to make them.

> Also, their profit margin for one year is not a fair argument towards them being at fault.

They are a state granted monopoly. I think it's entirely fair.

> Economics at scale is not a black-and-white, napkin math, solvable problem.

Sure, but you can start on the napkin and see if you're even in the ballpark. I think if you put even $100 million down on a napkin, you'd be surprised at what can fit in your ballpark.

Re:This electrical transmission tower has a problem by randomchars on Thursday September 17, 2020 @01:02AM (#24501354)
> Telling people "We need to turn off your power for a couple days every couple months for inspections" is going to create a lot of backlash, no matter how good the reason.

Maybe not every couple of mounts, but they could probably get away with doing them more frequently than a century... Also, you can do visual inspection even without having to shut down power.

Re:This electrical transmission tower has a problem by Dylan16807 on Thursday September 17, 2020 @03:59AM (#24502197)
The lines could have been inspected without shutting them down.

No, stronger than that. The problems with these lines were noticed without shutting them down, at least by someone, but it didn't get acted on.

We don't even know if replacing these parts would have required shutdowns, but it would have been easy to justify shutdowns for such visible problems.

Re:This electrical transmission tower has a problem by stefan_ on Thursday September 17, 2020 @04:24AM (#24502325)
This is PG&E in California we are talking about? The one that already has rolling blackouts? California is just a failed state - an embarrassment for an economy so large it rivals most countries.
Re:This electrical transmission tower has a problem by andromeduck on Thursday September 17, 2020 @08:03AM (#24503556)
That's what happens when there's no viable opposition party.
Re:This electrical transmission tower has a problem by joelkevinjones on Thursday September 17, 2020 @08:33PM (#24511674)
The Republicans have a little more blame for the deregulation driven blackouts of 2000.

From https://en.wikipedia.org/wiki/Pete_Wilson Wilson was the driving force behind the 1996 legislation that deregulated the state's energy market, which was the first energy utilities deregulation in the U.S. and aggressively pushed by companies such as Enron.[28]

Re:This electrical transmission tower has a problem by m-ee on Thursday September 17, 2020 @04:07AM (#24502230)
How is shutting these lines down not feasible when PG&E regularly does it as part of their "public safety power shutdowns"
Re:This electrical transmission tower has a problem by mrbabbage on Wednesday September 16, 2020 @11:29PM (#24500899)
There is no defense for PG&E for the Camp Fire. This is an organization that is notorious for under-maintaining its assets. Its state of repair is so shoddy that it regularly turns off power for many days at a time ("public safety power shutoffs") to huge swathes of its service area. No other comparable utility does this - not San Diego Gas and Electric, not the Victoria Electricity Cooperative (Australian utility), no one, because they have entered the 21st century and don't need to resort to crude hacks like shutting off all power to prevent fires.

The proof is in the thread. Barely 10 years ago, PG&E pleaded guilty to another felony, when its under-maintained gas pipeline in San Bruno exploded, killed 8 people, and leveled a neighborhood. That utility has a cultural problem going to the very top that prioritizes profit over safety, and I sincerely hope it emerges from bankruptcy reformed.

Re:This electrical transmission tower has a problem by bhawks on Thursday September 17, 2020 @12:48AM (#24501284)
PGE also was responsible for contaminating the ground water in Hinkley California with millions of gallons of chromium in the the 1960s and then covering it up for 20 years.

There is something seriously wrong with PGE and it's attitude towards it's infrastructure and public safety.

Re:This electrical transmission tower has a problem by mensetmanusman on Thursday September 17, 2020 @07:12AM (#24503218)
Not sure how important it is to bring up something from 60 years ago. All the workers from that time are likely dead.
Re:This electrical transmission tower has a problem by andromeduck on Thursday September 17, 2020 @08:04AM (#24503562)
But the culture isn't.
Re:This electrical transmission tower has a problem by aaron695 on Thursday September 17, 2020 @02:24AM (#24501758)
> not the Victoria Electricity Cooperative (Australian utility),

The state next to Victoria does, and did recently.

https://www.sapowernetworks.com.au/data/304387/catastrophic-...

Re:This electrical transmission tower has a problem by piker on Thursday September 17, 2020 @06:34AM (#24502960)
None of this information is relevant to whether PG&E has a defense for the Camp Fire.
Re:This electrical transmission tower has a problem by awalton on Thursday September 17, 2020 @07:48AM (#24503444)
Overruled, statement goes to motive and habit.
Re:This electrical transmission tower has a problem by floatingatoll on Wednesday September 16, 2020 @11:25PM (#24500873)
PG&E pled guilty to the charges brought against them, in part because there was clear evidence of their leadership intentionally neglecting their infrastructure for decades until it fell into such disrepair as to start a forest fire. They chose to remain quiet about their neglect until it became impossible to do so, sealing their fate. If they had demonstrated a history of decades of campaigning to get the problem solved, rather than silently neglecting it, they might not have been found guilty at all.

(This is from memory, so if I got any specifics wrong, see replies for corrections.)

Re:This electrical transmission tower has a problem by aaronblohowiak on Wednesday September 16, 2020 @11:43PM (#24500970)
>and the lines cannot be shut down

yes, they can.

>I doubt anyone was living near the lines when they were built 100 years ago.

Paradise, CA was on a railroad map ca 1900:

https://www.snopes.com/fact-check/stranger-in-paradise/

Re:This electrical transmission tower has a problem by williadc on Thursday September 17, 2020 @12:01AM (#24501069)
> I'm of the opinion that humans should not be living in areas that burn regularly.

Along similar lines of thinking, humans should not be living in areas that flood regularly, or that have earthquakes regularly, or that have hurricanes regularly, or that have tornadoes regularly, or that have insufficient water, or that have excessive heat or cold regularly, or that have high rates of animal-transmitted disease.

This doesn't leave many places for people to live.

Re:This electrical transmission tower has a problem by rcpt on Thursday September 17, 2020 @12:33AM (#24501206)
It actually leaves quite a lot of places to live.

Yes an asteroid could hit anywhere but the notion that suburban sprawl out into every corner of the wilderness is justified by that is ludicrous.

Re:This electrical transmission tower has a problem by rubidium on Thursday September 17, 2020 @08:29AM (#24503777)
It would be a really fun map though, to determine where is "safest" based on an individuals risk profile.
Re:This electrical transmission tower has a problem by rcpt on Thursday September 17, 2020 @11:39AM (#24505973)
Insurance rates map https://howmuch.net/articles/homeowners-insurance-rates-2020

But there’s got to be a higher resolution one out there.

Re:This electrical transmission tower has a problem by throwaway189262 on Thursday September 17, 2020 @04:28PM (#24509582)
These exist, somewhere. Data centers are very interested in disaster risk since they don't have many other constraints
Re:This electrical transmission tower has a problem by throwaway189262 on Thursday September 17, 2020 @04:27PM (#24509567)
It does. The west coast is fire and earthquake prone. The east, hurricanes. There's a giant swath of land in "flyover country", the Midwest, that doesn't have any particular disaster risk.

But people like living near the oceans, mountains, and where weather is nice. That should be okay, but the government shouldn't be throwing money at them. Let them know the area is dangerous, and if they want to live there, they're on their own.

I get miffed when we bail these people out with federal funds for disaster relief. They should be required to have private insurance, with insurance free to set rates based on risk. If it's too expensive to get insured, don't live there

Re:This electrical transmission tower has a problem by cco on Wednesday September 16, 2020 @11:34PM (#24500925)
It feels like a great use case for a drone, you could get closer, the video can be taken by non-inspectors and then reviewed later/stored.
Re:This electrical transmission tower has a problem by Animats on Wednesday September 16, 2020 @11:53PM (#24501030)
That's how it's done now.[1] But seeing wear on a hook is tough even with high resolution photos, because the wear is between hook and eye and doesn't show clearly until the setup is disassembled.

[1] https://youtu.be/7-JTqwUyD5o

Re:This electrical transmission tower has a problem by dv_dt on Thursday September 17, 2020 @01:32AM (#24501518)
Did you look at the photos of the hook, it should be visible to a proper inspection. That marketing video of inspections is either picked for nice panning shots, or is simply inadequate operation to make it look like they can inspect faster than they should to be effective.
Re:This electrical transmission tower has a problem by ClumsyPilot on Thursday September 17, 2020 @08:50AM (#24503946)
Where a park can't be verified, its replaced regularly.

Replacing them every 30 years won't bancrupt anyone.

Re:This electrical transmission tower has a problem by andromeduck on Thursday September 17, 2020 @08:06AM (#24503583)
Can't you just infer it by how much of the original eye is unoccupied?
Re:This electrical transmission tower has a problem by avianlyric on Thursday September 17, 2020 @10:40AM (#24505174)
In the UK helicopters are used as drones simply aren’t fast enough to image an entire transmission line in a reasonable amount of time.

However unlike PG&E we take high resolution photographs of every major component on a transmission tower, and manually inspect and classify every image take. Images of this type would have identified this fault, at least once during inspections taken during the last couple of decades.

Source: Worked for a company that did these inspections.

Re:This electrical transmission tower has a problem by mjevans on Wednesday September 16, 2020 @11:30PM (#24500905)
There is plenty of blame to spread around.

Regulations should require sufficient redundancy for scheduled outages on individual lines for regularly scheduled service during non-critical times.

Communities should not be allowed to form, and should be actively wound down if they are within dangerous areas with seasonal problems. Fires, Floods, Extreme doubts, unsustainable water table use, etc. This should _begin_ at a federal level with a re-location act, and should involve planning and support at every stage of government to proceed in an orderly way for society.

Edit: Also, of course, the company is still at fault, I forgot to point that out while going over other aspects of the systemic failure of society (people and organizations of people) as a whole.

Re:This electrical transmission tower has a problem by dragonwriter on Wednesday September 16, 2020 @11:39PM (#24500951)
> Communities should not be allowed to form, and should be actively wound down if they are within dangerous areas with seasonal problems.

But when we abandon most of the West (earthquake, fire, drought), midwest (flooding, tornados, east and particularly gulf coast (hurricanes), there's a whole lot of economic output lost from working land (farming, mineral extraction, etc.) that won't be replaceable when you crowd the remaining population into whatever safe bubble you have left.

The reason people live in dangerous areas is because they are often inherently economically productive, and in fact many of the things that make land suitable to human habitation are associated with periodic risk (freshwater supply and flood risk tend to go together, for instance.)

Re:This electrical transmission tower has a problem by rcpt on Thursday September 17, 2020 @12:37AM (#24501221)
California mountain towns are not economically productive. I doubt they could even exist without the rest of the states taxes supporting their infrastructure.
Re:This electrical transmission tower has a problem by bhawks on Thursday September 17, 2020 @01:02AM (#24501357)
Yes, this happened in an isolated mountain town. Let's set that aside for a moment.

PGE demonstrates neglectful behaviours towards all of its infrastructure. It has transmission lines everywhere and has the same general attitude to maintenance and safety. Ask the people of San Mateo how safe they feel with PGEs gas lines. There are serious long term problems inside PGE and it's doubtful they are going to change.

PGE presents a serious risk to Californians everywhere.

Re:This electrical transmission tower has a problem by daniellarusso on Thursday September 17, 2020 @08:13AM (#24503630)
What is the process for ‘winding down’ a community?

Is the local government dissolved, so the county or state pays for this?

Any info is appreciated, I am very curious of how this works in practice.

Re:This electrical transmission tower has a problem by baddox on Thursday September 17, 2020 @03:09AM (#24501957)
I mean, you have to be more careful when you’re in a more dangerous area. If you live on a remote farm you can hit golf balls from your back porch. If you live in a suburb, not so much. Is this unfair?
Re:This electrical transmission tower has a problem by zaroth on Wednesday September 16, 2020 @11:34PM (#24500922)
The big change is not that somehow PG&E is going to inspect every hook on every tower. It’s not like they can just climb the tower and check it out, as you say they inspect with helicopters and cameras. Probably many of these towers don’t have a clear means to even access them with heavy equipment.

Instead, the approach is they will simply shut off the power during these high risk days.

Interesting that they actually warned that they could shut off power in the days leading up to the fire, but never actually did. To me, those are the meetings to zero in on when it comes time to lay the blame. I wonder, what was the calculus to cutting power (which itself can have health & safety impacts to the populace) and how much of it was political?

PG&E has 100,000 miles of transmission lines, so perhaps about a million of these towers. To put that in perspective, historically they spend billions of dollars a year on maintenance and upgrade on the order of 100-200 miles of transmission lines per year.

Re:This electrical transmission tower has a problem by tonyhb on Thursday September 17, 2020 @12:18AM (#24501146)
Or, you could be responsible and say 'hey, we have no documentation for this power line and it's 90 years old. Our knowledge of materials science say this should have worn out. Let's be proactive and replace things'.

You don't need to physically inspect every item to be safe, here. You rely on precaution, standard shelf life, and operational procedures.

If that's difficult, so be it. That's the price people pay for choosing to live in the sticks. This should all be accounted for.

You think that hospitals inspect every item every 3 months? Hell no. A lot of things have lifecycles and it's just replaced because that's the tolerance, and it's safer in the long run. PG&E should be the same.

Re:This electrical transmission tower has a problem by zaroth on Thursday September 17, 2020 @01:00AM (#24501342)
The average age of a PG&E tower is 68 years old.
Re:This electrical transmission tower has a problem by bhawks on Thursday September 17, 2020 @03:04AM (#24501930)
PGEs own linemen were concerned about wear on these towers. They sent samples from the field to labs for metallurgical analysis. PGEs own scientists estimated that the components would wear out in 100 years.

PGE took this information and did nothing.

https://pbs.twimg.com/media/EiErOkaUMAA178t?format=png&name=...

This is not how you maintain critical infrastructure. This is embracing failure and simply not caring about the consequences.

Re:This electrical transmission tower has a problem by zaroth on Thursday September 17, 2020 @04:39AM (#24502410)
So they staff and run a metallurgical lab in house to which linemen can send samples for analysis, and then management simply throws away the reports?
Re:This electrical transmission tower has a problem by ClumsyPilot on Thursday September 17, 2020 @08:52AM (#24503965)
Of I personally, knowingly caused this much damage throug negligence, i'd be in jail forever.
Re:This electrical transmission tower has a problem by zaroth on Thursday September 17, 2020 @10:19AM (#24504920)
To be fair, first you would have build out a several hundred billion dollar state wide electrical grid, while allowing it to degrade in various ways over approximately a century.

I’m not sure a single person at any one time has ever knowingly caused this much damage through negligence. I mean ever in human history. Failures this large due to negligence tend to be systemic. But it would be a very interesting to hear an example.

The closest I can think of could be some of the famous bridge design failures, where people died, and people did go to jail, but not forever.

Re:This electrical transmission tower has a problem by imtringued on Thursday September 17, 2020 @03:41AM (#24502112)
I'm sure what your point is. The worse the situation, the greater the responsibility. PG&E does not live up to the responsibility it should carry. If the towers are on average 68 years old that means they are supposed to put even more effort into maintenance than they already do.
Re:This electrical transmission tower has a problem by 20after4 on Thursday September 17, 2020 @03:21AM (#24502011)
So they better start maintaining them at a rate higher than 100-200 miles per year. They need to do 1000 miles per year to keep up with 100,000 miles of lines that have a 100 year life expectancy.
Re:This electrical transmission tower has a problem by zaroth on Thursday September 17, 2020 @10:42AM (#24505198)
They’ve promised to spend $40 billion over the next five years on the grid, ~$8 billion of which is wildfire risk mitigation. It’s hard to say that will be in any way “sufficient”.

Because ensuring safety of the lines during very high risk days is impossible, a big part of the strategy was to add local generation redundancy so that they can switch off the transmission lines during high risk events but still keep the power on. These redundant stations would have to be natural-gas plants though, and CA has carbon-free mandates that prohibit them, so they have been prevented from implementing this strategy.

Frankly, it’s not clear that demand for this unreliable grid electricity can support the growth of the ratebase (the property being maintained).

At some point the ROI on switching to solar and batteries is net positive in the first month (based on financing the cost at a reasonable rate), and I’m not sure that point is much higher than $0.50/kWh for a household using 600kWh+ per month.

The more people that just opt-out of a grid connection entirely, the fewer people the ratebase is divided across, the higher rates must be set for those that remain.

Luckily the lithium-ion supply is fairly limited right now, but over the next 10-20 years that won’t remain the case.

PG&E currently has about $40 billion of debt, and recently issued $5 billion of debt at a B1 rating (junk). These issues also drive up their borrowing costs, which further shows up in the rates.

This is a good overview of the challenges they face;

https://www.greentechmedia.com/articles/read/four-hurdles-pg...

I predict that in 10-15 years we could hear calls to outlaw or prohibitively tax any new battery/solar systems that take new houses in CA off-grid, because the grid will be in “solar death spiral”.