This happens regularly in the SFBA, in Marin County. Every rainy season I see at least one house being built through Nov-Dec-Jan that is in the bare studs stage and gets soaked with a week or so of constant rain.
And then the sun comes out and they immediately tyvek wrap and seal the whole house up. Sopping wet, soaked studs, entrapped on both sides. I would love to open up the drywall in one of those two years later and see what the inside of the walls look like...
These are very expensive homes ... the four I am thinking of over the past two years were all 2M+.
This talk really gave me a foundation for understanding how moisture works in a building enclosure through seasons: https://www.youtube.com/watch?v=Ld8pzIu45F8
The speaker is a little hammy, but he's doing (more or less) legitimate science, and he laid out a bunch of principles I didn't understand before.
In particular, the different layers of the wall (ballistic, water, insulation, vapor, structure) really need to go in the right order, and at literally every exterior joint in the house you need to match up all five layers. There are also several layers that it is crucial to vent/drain.
It's extremely complicated, and for the most part just obeying code and convention will only get you 80% of the way there.
It seems to me there are also anti-patterns ensconced in code and convention. The idea that insulation goes inside the structural layer for example. You want your insulation layer to be unbroken.
I know they're in the desert, but drywall really should happen after the building envelope is sealed.
It's why bad actors (such as the ones described above) keep getting away with what they do.
Apparently, the contractor let the drywall get soaked while sitting on palettes during monsoon season, and since the roofing wasn't done there were inches of standing water that resulted in black mold.
They just drywalled right over it. In the US. In 2018. In a luxury condo.
So, you never know what nonsense you will have to put up with.