But load management while bootstrapping the rest of the grid is still very hard. Often the reason for really long blackout, ones measured in days rather than hours, is repeated cascading failures as operators try to reconnect parts of a the grid, and accidentally overload recovered parts of the grid, causing generators to trip off again.
Typically <5% afaik
They should have that and they typically pay substantially more for it. Unfortunately it's also the case that the private companies providing said black-start capability may have just not bothered to tell anyone they haven't been able to do it for a few months\years.
A properly run network will require those facilities to be tested multiple times a year to ensure it actually works, and make payment for the facility contingent on passing those tests.
So you need a hydro plant that is either small enough that it’s using turbines with at least some permanent magnets (you get turbine varieties that basically have a mini turbine inside using magnets to power the energise the larger electromagnets), or has dedicated infra to produce power to energise the coils in their turbines before they’re producing enough power to energise themselves.
The process is called islanding.
This is very much like trying to jump onto a train from another train moving alongside it.