News for hackers. Stuff that matters.
Re:Microsoft blames monster email outage on software defect ... by nialv7 on Monday November 16, 2026 @05:10PM (#50524109)
that's not the problem with grid black start at all? black start is difficult because many types of generators themselves need power to start. it's a circular dependency problem, not a load management one.
Re:Microsoft blames monster email outage on software defect ... by avianlyric on Monday November 16, 2026 @05:23PM (#50524277)
It’s both, but every grid has a sub-set of power stations with black-start capability (a crap ton of diesel generators), that exists to break the circular dependency problem and bootstrap the rest of the grid.

But load management while bootstrapping the rest of the grid is still very hard. Often the reason for really long blackout, ones measured in days rather than hours, is repeated cascading failures as operators try to reconnect parts of a the grid, and accidentally overload recovered parts of the grid, causing generators to trip off again.

Re:Microsoft blames monster email outage on software defect ... by hwillis on Monday November 16, 2026 @07:34PM (#50525766)
> every grid has a sub-set of power stations with black-start capability

Typically <5% afaik

Re:Microsoft blames monster email outage on software defect ... by tacticus on Monday November 16, 2026 @07:40PM (#50525816)
> It’s both, but every grid has a sub-set of power stations with black-start capability

They should have that and they typically pay substantially more for it. Unfortunately it's also the case that the private companies providing said black-start capability may have just not bothered to tell anyone they haven't been able to do it for a few months\years.

Re:Microsoft blames monster email outage on software defect ... by avianlyric on Wednesday November 18, 2026 @07:48AM (#50545682)
Nor should. They absolutely must, otherwise it would be basically impossible to blackstart the grid.

A properly run network will require those facilities to be tested multiple times a year to ensure it actually works, and make payment for the facility contingent on passing those tests.

Re:Microsoft blames monster email outage on software defect ... by cowlevel on Tuesday November 17, 2026 @04:20AM (#50529223)
Wikipedia says black start stations are often hydro dams, since all they have to do is open the floodgates (literally), without any preheating or fuel pumps or anything like that.
Re:Microsoft blames monster email outage on software defect ... by bell-cot on Tuesday November 17, 2026 @10:09AM (#50532427)
Hydro is ideal - if you have a good-size hydro plant handy, where a sustained drought can't possibly drop the reservoir too low for the penstocks to function properly.
Re:Microsoft blames monster email outage on software defect ... by avianlyric on Wednesday November 18, 2026 @07:47AM (#50545665)
Can’t be any old hydro plant however. Big hydro plants will be using turbines is electrically excited magnets (I.e. electromagnets), but that’s only way to build very high power turbines without tons of expensive and fragile permanent magnets.

So you need a hydro plant that is either small enough that it’s using turbines with at least some permanent magnets (you get turbine varieties that basically have a mini turbine inside using magnets to power the energise the larger electromagnets), or has dedicated infra to produce power to energise the coils in their turbines before they’re producing enough power to energise themselves.

Re:Microsoft blames monster email outage on software defect ... by bragh on Monday November 16, 2026 @05:34PM (#50524431)
That was a very enlightening moment in Factorio when I had already converted everything to power and the whole grid blacked out and I needed to get it going somehow again.
Re:Microsoft blames monster email outage on software defect ... by hwillis on Monday November 16, 2026 @07:33PM (#50525757)
It's certainly a problem with black starts: https://fdehydro.com/the-black-start-blueprint-how-power-gri...

The process is called islanding.

Re:Microsoft blames monster email outage on software defect ... by scheme271 on Tuesday November 17, 2026 @12:55AM (#50527935)
The other issue is that you need to be able to sync up the generators. E.g. your power plants are running at 50Hz or 60Hz or whatever. But are they running in phase, if not, then how do you make sure that each new generator is in phase with the overall grid in order to avoid the generators from fighting each other?
Re:Microsoft blames monster email outage on software defect ... by cowlevel on Tuesday November 17, 2026 @04:21AM (#50529232)
For that they use a couple of analog knobs to adjust the generator speed, and a specialized type of analog meter called a synchroscope, which measures phase difference. When it's at zero and not moving, they pull the big lever.

This is very much like trying to jump onto a train from another train moving alongside it.

Re:Microsoft blames monster email outage on software defect ... by mike_hearn on Tuesday November 17, 2026 @04:52AM (#50529421)
Maybe in the 1920s ;) Pretty much any power station built post-war will have automatic synchronization. You aren't going to manually synchronize a large power plant these days, it's far too dangerous. Even very old plants have safeties that prevent closing the breakers if the sync isn't close enough.
Re:Microsoft blames monster email outage on software defect ... by cowlevel on Tuesday November 17, 2026 @06:01AM (#50529866)
Makes sense, I saw it on a YouTube video of a relatively small station.