Re:Microsoft blames monster email outage on software defect ... by cowlevel on Tuesday November 17, 2026 @04:21AM (#50529232)
For that they use a couple of analog knobs to adjust the generator speed, and a specialized type of analog meter called a synchroscope, which measures phase difference. When it's at zero and not moving, they pull the big lever.

This is very much like trying to jump onto a train from another train moving alongside it.

Re:Microsoft blames monster email outage on software defect ... by mike_hearn on Tuesday November 17, 2026 @04:52AM (#50529421)
Maybe in the 1920s ;) Pretty much any power station built post-war will have automatic synchronization. You aren't going to manually synchronize a large power plant these days, it's far too dangerous. Even very old plants have safeties that prevent closing the breakers if the sync isn't close enough.
Re:Microsoft blames monster email outage on software defect ... by cowlevel on Tuesday November 17, 2026 @06:01AM (#50529866)
Makes sense, I saw it on a YouTube video of a relatively small station.