Being two separate tunnels, it also needs twice as much excavation work. It's also ~25x deeper than Toei Oedo (4000ft vs 157ft). At 4000ft the rock itself is 45-50C!
> "The undisturbed rock temperature varies from 10 °C, in tunnel sections close to the portals, to 32 °C in the tunnel centre"
32°C is still a significant engineering concern, but not as consequential as 45–50°C.https://www.sciencedirect.com/science/article/pii/S088677982...
Assumed they would at least have their own air in the bits that didn't have aircon/ventilation while it was being built. They don't even need to do that anymore! The ventilation systems they used are as advanced and bespoke as the boring machines.
Because they were blasting too, they couldn't utilize full-face pressurization of the entire tunnel to maintain negative pressure to suck all of the fumes, dust, silicates, etc out like they would if it was only boring. That's 1-3kPa, "leaks are jets of air, can pull an airlock door closed hard enough to break bones" territory.
Instead, they have a bunch of dedicated supply and exhaust vents going to the surface (some up to 2m in diameter) and sets of connections between the two tunnels with huge axial fans. It allows them to selectively apply "slight" negative pressure to any of the individual segments when they need to clear them. 50Pa is ~10x what you encounter in a negative pressure highrise. It is described as a "constant slight breeze"
I found this short video on some of the safety features of the finished tunnel. It almost looks "too serious", like something out of a James Bond movie https://www.youtube.com/watch?v=I8trt96huf0
> Being two separate tunnels, it also needs twice as much excavation work.
Yet another great point. At some of the Toei Oedo stations, you can see a miniature model of the weird overlapping twin tunnel boring machines. So, in theory it is two tunnels, but in practice, it was dug as a single, weird overlapping twin tunnel.Overall an amazing achievement, and unsurprising it took this long to figure out!
Kanto is flat, it's the only region in Japan that could sustain feeding such a massive population and could allow building the first mega city on the planet.
Combine that with the massive engineering and rail experience Japanese have, and it's no surprise imho that combined with favorable geography they could build it quickly.
[1] https://upload.wikimedia.org/wikipedia/commons/2/28/Topograp...
The Alps are very, very old in comparison.
Population size, density, terrain, etc. have nothing to do with it.
... it looks like a multi-multi-multi-phase project. Hats off to making this work.
Second, I noticed how long it took to build this tunnel: Koralm Tunnel -> https://en.wikipedia.org/wiki/Koralm_Tunnel
It is 33km, and it took from 2008 to 2025 to build it. That is a damn long time! The Toei Oedo line in Tokyo is 40+km and was built in about 10 years. My guess about the wild difference: The geoengineering of the Koralm Tunnel is way more complex, and/or the rock is much harder. Can anyone with experience in this area comment? I would like to learn more. I guess that most of central Tokyo is aluvial plains (Shanghai is similar), so you are basically digging through clay and sand -- easy stuff for modern tunnel boring machines.