After, to a power grid, removing large loads are functionally equivalent to adding additional generation. So if you’re operating an arc furnace, and can shutdown quickly (which arc furnaces can), then grid operators will pay you for privilege of being able to shut you down at moments notice, and then pay even more for the electricity you’re not consuming, if the grid is forced to call upon that additional “capacity” due other issues on grid.
I’m not sure if arc furnaces today vary their usage in direct response to variable electricity prices through the day, rather than only acting as emergency ballast to be jettisoned in an emergency. But I would be very surprised if they didn’t, they’re a large enough load that they’ll have coordinate the usage with their local grid, and large enough that shifting the usage pattern to avoid high cost peaks would save them a very material amount of money.
And whether you said something right or wrong I at least would have liked to see it. Especially when it gets a callout like that.
All the more reason for me to stop engaging, isn't it?
The gist of it was that nuclear power is insufficient in and of itself because it is hard to regulate output to match grid requirements, and therefore that we need both nuclear and renewable energy sources, not just one or the other. Maybe I'm wrong, maybe I'm not, I'm out of here either way.
No, I don't think so. The skepticism all comes from your initial comment, not the followups.
> The gist of it was that nuclear power is insufficient in and of itself because it is hard to regulate output to match grid requirements, and therefore that we need both nuclear and renewable energy sources, not just one or the other. Maybe I'm wrong, maybe I'm not, I'm out of here either way.
Oh well that specific point is wrong. Modern nuclear can adjust its output quickly and within a wide range if the operator wants it to. We could run a 100% nuclear grid. The fundamental issue at hand is price, not capability, because reducing output makes the cost per watt go up.
Even if it is batch process, going from 24 hours to 8 hours is like tripling plant cost vs productivity.
They might rely on cheaper power to lower the average cost make financial sense, but that is a different than soley utilizing excess power.
If they cant rationalize the opex running 8 hours a day, there is still a problem. My understanding is that many of these plants cant even shut down and be restarted.