Rail figures are harder to find, but a reasonable guess based on what I can find seems to be 400 containers per train if the loading gauge permits double stacking containers. Speeds over 100km/h are easily achievable on railways without at-grade crossings.
So one ship could easily require ten trains to move all its cargo in the same time, plus the time taken to offload at each end, which I guess is why this hasn't taken off. Though if it's all just transhipped to trains this could be faster than at most ports where containers have to be sorted to different destinations.
Though interestingly with a dedicated right-of-way the trains don't actually need to be manned, remote control freight trains exist.
Hand counting how wide a panamax gets, they seem to max out at about 19 or 20 containers wide and 15 containers deep. It also looks like shipping containers already can be top latched with this video: https://www.youtube.com/watch?v=GZQPxl9zssk
So if you could automate this system at 30m per transfer of 10, a port with 15 cranes could do 300 containers an hour and clear a boat in about 15 hours. You could expand the system further into a full panamax width and do it in about 8 hours per panamax boat with 4500 TEUs.
And a longer land route?