https://electrek.co/2022/11/16/wind-turbines-made-entirely-o...
1. https://www.researchgate.net/figure/Illustration-of-the-rein...
[0]: https://en.wikipedia.org/wiki/Energy_return_on_investment#Wi...
I do wish I had a little better idea what the costs of wood were. There have to be nutrients and other resources consumed, that wood takes to produce. I'd love to better appreciate the material flow of wood.
Probably still better than the cement in concrete but I don't have a source for that.
[1] https://www.windpowermonthly.com/article/1660496/windtech-wh...
I'm pro-wind turbine though.
It's not very interesting to be asked "what if it is built without consideration".
Same goes for any capital expenditure, ROI is zero if it is unwanted
There are at least four major variables here, #1 the cost of the turbine and its installation (and maintenance), #2 the cost of financing, #3 the market value of the electricity that's being generated, and #4 the amount of electricity generated as a factor of how much wind the turbine will encounter.
#1 is where we can all be happy - turbines are getting bigger and cheaper. #2, well, you'll have noticed that interest rates can do some wacky things, and so the amount you'll spend financing your turbines might also vary quite a bit. #3 is an interesting one - we'd really like to build more and more clean energy sources, pushing the cost of electricity to the consumer down, but any given turbine is going to take longer to pay for itself if, after its construction, the cost of electricity continues to drop. Conversely it will pay for itself quicker if prices take off for some reason.
Regarding #4 - I guess it hurts people's feelings to think that turbines might be put in a suboptimal place because of politics, but putting that aside, we'd like to eventually put turbines in as many places as practical, and the difference between how productive a turbine on a mountain ridge or on the high plains might possibly be and a turbine in an urban environment might be is really high. I live near a 2.5MW Kenersys turbine that a company put on its urban campus, largely as a publicity stunt. It's glorious, but it's definitely not spinning as often as you'd like, or as much as it would in a better location.
Using some napkin math that doesn't really bear sharing, I believe it will pay for itself (pay for itself in terms of money spent and return on investment via electricity generated - not something hand-wavey and poorly specified involving carbon) well into the second half of its lifetime. That actually seems fine, it beats their getting all that electricity via the local coal plants, but maybe it speaks to the issue with these hand-wavey numbers: it would have paid for itself much, much faster in a better location. That's okay - as long as the turbine pays for itself over its lifetime, it's all good.
If anything, I think the understated way the grandparent comment presented the facts added to the impact of the final result.
This myth just won't disappear.
Fiberglass isn't easy to recycle, but we absolutely can and do:
https://www.energy.gov/eere/wind/articles/carbon-rivers-make...
https://www.siemensgamesa.com/en-int/newsroom/2021/09/launch...
https://www.nationalgrid.com/stories/energy-explained/can-wi...
What stops us from making blades with a 60 year lifespan?
For a typical onshore wind turbine, the tower can contain approximately 295 tons of steel
The concrete footings are usually 9 feet thick and 60 feet in diameter, requiring about 300 cubic yards of concrete, which is equivalent to 30 to 40 truckloads.
The blades have a 20 year lifespan and cannot be recycled, being made from fiberglass reinforced with plastic, also known as glass fiber reinforced polymer (GFRP). With newer ones also incorporating carbon fiber.
All that said, for a turbine to produce enough clean electricity to offset the carbon emissions produced during its manufacturing, installation, and maintenance, is typically around 7 to 8 months.