Diamond core drilling tho is basically a cylinder shaped drill bit attached to a hardened drill rod that is attached to a rod string (groups of 3m pipes). Everything is basically done in 3m lengths, mostly for transport reasons. When your drilling you work with the rods in bundles of 3 so 9m lengths. I worked mostly on UDR 1200's and a prototype surface rig that there were like...3 built? partnership between a few big companies. That rig was the one that could do (estimated) up to 3000m or so. Deepest I worked on was 2200m. Drill bit sizes if your interested in looking them up that we worked with are BQ,NQ,HQ,PQ. So external diameters ranging from 60mm with bq (core size of 36.5mm) to PQ @ 122mm ext. and 85 ID. We worked all manual by hand so PQ with a drill barrel weighing like 50kg was our limit. Shaking core from 3m HQ drill rods nearly broke me the first time I did it.
The drill barrels have a inner tube that is the core holder/lifter that hangs like a few mm from the spinning bit at all times while drilling, these are 6m long. After you have drilled 3m, you clamp the rod string so its hanging from the drill rig and add 3m until you have preferably 6m drilled. Drilling stops, you pull back on a wireline that is holding the core tube to engage the internal clamps on it and haul up your 6m of core. A empty tube gets sent back down, you add another 3m rod to the string and repeat the process. While this happens the full core tube is orientation marked, shaken out and cleaned and re-assembled as it comes out of the hole in core trays. ^^^^ Everything above is if things go to plan. Rough ground, broken bits, hard ground, loss of water return all kinds of things can cause problems and make runs stop, go short, loose rods, drop core, require bit changes, cause equipment to overload and break so on. Been a few years since I did it but I do kind of miss the work.
https://www.youtube.com/watch?v=DUMftmjpdNg This is a video of after a bit change. they are pushing rods back down the hole to hit the point where drilling stopped. They are moving real slow. 111 rods roughly to 1000m. Worst shift I had was 16 ton of rods moved. >1000m down, started shift pulling rods for a bit change, bit snapped a tooth after we got it back down in under 5m of cutting and had to come straight back out. Hell of a night. If your lucky you have 3 to a rig (driller and two offsiders) if your unlucky its just 2 on a rig. No breaks. You eat while you drill.
https://www.youtube.com/watch?v=VF3_TqN6AQA This video also covers the whole basics pretty well.
I don't drill any more but do kind of miss the work.
The drill string is a chain of threaded pipes.
There is tons of good information online, just search for oil well drilling on YouTube.
This stuff is nuts, https://amcmud.com/product/amc-cr-650/ Have sent pallets of the stuff down hole. Few 500ml scoops of that and you can turn 5000l of water into some crazy thick mud for bringing up heavy cuttings. Worst experience tho copping a face full of dust when dosing it tho, gets in your eyes. Takes a ridiculous amount of water to wash past the thickening point and get it out.
Sorry for many questions just can't find much info on actual field truth (just generic info on theory of operation).