But mostly ecause numbers with lots of zeros are important to keep in mind.
I don't know what the actual growth rate is, but I don't think there's cause for concern, except to coal miners.
Edit: there aren't any material limitations. The current hotness is proton-exchange membrane technology; the coming thing is solid oxide electrolysis (promises lower cost); the century-old technology (that has been ignored for most of that time, so hasn't been properly cost-optimised) is alkaline electrolysis using caustic potash or caustic soda.
Alkaline is slightly higher cost, but as I said no significant effort has been put into it for a while.
There is no way we can ever run out of sodium.
Hydrogen can grow 10x from where it is now because it is paltry in size, but then, no way. But as you yourself point out, hydrogen is all research and prototypes, but EV / Solar / Batteries / Wind is production or near-production.
At this point the planet needs what works now.
But will hydrogen extraction/electrolysis ever be cheaper than grabbing it from methane? I doubt it. That's one of the big big big issues with hydrogen, the "green hydrogen" supply chain can be exposed to fraudulently sourced hydrogen. Don't assume regulatory controls will be in place everywhere, companies will simply arbitrage the lowest common denominator regulation or under the table it. It happens to this day with petroleum from Iran and Russia.
The possibility is very dependent on the network constraints to the load: there is often excess network capacity on many links or excess capacity at certain times of day, because the network is built to handle peak loads. There is also availability of capacity on network secondary-links that have reserved backup capacity (to handle failover from network primary-link failure).
One major constraint for green power is locating it near a network node that can accept the power.
All that, of course, has to be balanced against ore transport and slag disposal costs.
[1] https://wikipedia.org/wiki/HVDC_Inter-Island
[2] p23 of https://environment.govt.nz/assets/Publications/Files/Assess...
Those applications don't require an elaborate transport infrastructure; just that the plants be located near large PV farms or vice versa.
Why write "trillions" in capital letters? Is it supposed to be impressive? A trillion dollars is one percent of global GDP. Oil, fossil gas, and coal extraction cost 5 TRILLION dollars a year, and the infrastructure for their use (vehicles, boilers, etc.) cost TRILLIONS more. And that's just to offset depreciation.
1. An alternative to using hydrogen for iron smelting is direct electrolysis of molten iron ore, but that is at early research stages. It can't be rolled out globally in the next four decades; development will take longer than that.