Re:Breakthrough electrolyser development: 200 times less iri... by robocat on Sunday October 30, 2022 @02:33AM (#33391783)
Network and conversion losses are often surprisingly small. For example a 600km DC link in NZ[1] has total losses of 1.42% on the first 323MW and 3.30% on the next 753MW[2] (age of rectification & inverter equipment varies). There is AC to DC conversion at both ends, so that is equivalent. DC transmission losses are less than an AC segment would be (220kV AC to 350kV DC with 40km underwater).

[1] https://wikipedia.org/wiki/HVDC_Inter-Island

[2] p23 of https://environment.govt.nz/assets/Publications/Files/Assess...