Re:Breakthrough electrolyser development: 200 times less iri... by robocat on Saturday October 29, 2022 @06:42PM (#33388698)
Presumably the electricity network can often be used to transport the power, so only the hydrogen electrolysis plant needs to be near the industrial consumer.

The possibility is very dependent on the network constraints to the load: there is often excess network capacity on many links or excess capacity at certain times of day, because the network is built to handle peak loads. There is also availability of capacity on network secondary-links that have reserved backup capacity (to handle failover from network primary-link failure).

One major constraint for green power is locating it near a network node that can accept the power.

Re:Breakthrough electrolyser development: 200 times less iri... by tuatoru on Saturday October 29, 2022 @08:43PM (#33389610)
Yes, although siting the electrolyzer at the PV farm uses DC from the modules directly, avoiding DC-AC inversion losses, transmission losses and AC-DC rectification losses. Having the smelter there too avoids hydrogen transport and storage costs.

All that, of course, has to be balanced against ore transport and slag disposal costs.

Re:Breakthrough electrolyser development: 200 times less iri... by robocat on Sunday October 30, 2022 @02:33AM (#33391783)
Network and conversion losses are often surprisingly small. For example a 600km DC link in NZ[1] has total losses of 1.42% on the first 323MW and 3.30% on the next 753MW[2] (age of rectification & inverter equipment varies). There is AC to DC conversion at both ends, so that is equivalent. DC transmission losses are less than an AC segment would be (220kV AC to 350kV DC with 40km underwater).

[1] https://wikipedia.org/wiki/HVDC_Inter-Island

[2] p23 of https://environment.govt.nz/assets/Publications/Files/Assess...