Use 20MW of energy to add 10MW into plasma, get 20MW of fusion, convert 30MW of heat into 10MW of electricity and they have reached their stated goal without actually achieving anything useful. And that’s assuming steady state operation rather than a fraction of a second pulse that briefly reaches their goals.
It’s exactly the same thing as a startup selling dollars for pennies and saying yea we’re going to make it up in volume.
Tokamak scaling is very well established. The output scales with the square of plasma volume, and the fourth power of magnetic field strength. Stronger magnetic fields also make the plasma more stable. JET already demonstrated a five-second plasma, which they only had to shut down because they have copper coils that would melt if operated longer than that.
Because of all this, many independent fusion researchers think SPARC will succeed in getting 10X gain in 2025. After that, the larger ARC should easily reach commercial levels.
Of all the commercial fusion companies, CFS is the most conservative one. Tokamak Energy is a close second, with a very similar approach. The other fusion startups are attempting approaches that have more physics risk, though many of them would have fewer engineering and economic difficulties if the physics does work out.
First you need fuel, global Tritium supplies are tiny and DD fusion is much harder.
Next stability is an open question, no Tokamak has ever operated near maximum capacity for even 1 hour.
Add to that serious material science questions, etc etc and even Q>100 alone just doesn’t actually mean much.
Now let’s just assume all of that is solved, you still need to actually ensure your design is economically viable. Simply producing energy from fusion alone isn’t enough which means you need to cheaply solve not only all the above but do so cheaply.
They actually have a fairly practical-looking design though. ARC will use FLiBe for tritium breeding and coolant. That will surround an inner reactor wall that's 3D-printed and replaced annually. MIT already demonstrated joints in the superconducting tape, allowing the reactor to be opened up to replace the core.
Economic viability is an open question for all tokamaks. Some of the other designs would have a better chance of achieving low costs if things work out, but there's a much bigger question mark on the plasma physics.
It’s really not clear which would end up cheaper in the long run.
As to containment, the lack of high pressure steam makes much thinner walls completely viable. You still need shielding around the vessel, but not a completely redundant system capable of containing highly energetic steam explosions.
In terms of risks, sabotage at a nuclear reactor can be vastly more expensive than just the cost of equipment. Modern reactors are reasonably safe, but not if people where actually trying to break them. Especially when you consider what someone could do with access to the fuel. It’s not weapons grade, but dirty bombs are horrific.
The building housing an ARC will be very large. The reactor itself is 20 meters tall, and the entire top half of it has to be lifted off and moved aside when changing out the vacuum vessel. All that lifting and moving will have to be done remotely because of radiation from the activated vacuum vessel, which then will need yet another shielded area where it can be broken down for disposal and the debris from that cleaned up or at least contained.
Safety system don’t just need to handle normal operations. The energy in a fusion reactors magnetic fields is very well known, a fission reactor steam explosion or potentially hydrogen explosions can bet vastly more violent.
Using Fukushima as a baseline. ~1,000 kg of hydrogen * 142 MJ/kg is a lot of energy and that was vented outside the primary containment vessel before detonating.
Granted this is not an inherent requirement for fission, but good luck convincing regulators it’s unnecessary.
IOW, we're never going to break even. You and I are paying now, and would in any case never get any of the revenue, if in fact any could be had.
But we are supporting the careers and research of plasma fluid dynamics physicists and their students, and a few of them might do other, actually useful, and anyway wholly unpredictable things, later. With a good measure of luck, none of those things will build up to any world-spanning catastrophes the way the steam engine did.
p-B or D-He3 fusion, if achieved, would have application in the outer solar system even if not competitive here.
Lower risks should mean fewer NIMBY issues, which means wider adoption. Nuclear advocates miss that if fission played a larger role in energy generation it would also see more major incidents. Which then risks a backlash etc.
But D-T reactors would mainly breed tritium from lithium. The CFS reactor, for example, will immerse the reactor in a pool of FLiBe salt, which also functions as coolant. Each beryllium atom hit with a neutron emits two neutrons, and when neutrons hit lithium atoms they breed tritium. General Fusion does something similar with lead in place of beryllium.
He3 barely exists on Earth. However, pure deuterium fusion is easier than He3 fusion, and its waste is half He3, half tritium.
Even if it could be recovered, all the 3He on the entire moon might power the world for maybe 100 years.
That strengthens the point I was trying to get at, which was that there's no reason to go to the moon for He3 when, if we can get net power from He3, we can just make it in a D-D reactor and gain energy in the process.
For D-3He fusion to be useful, we have to hope that it will be economically viable to synthesize 3He, in the meantime. Arguably, we ought to be making and stockpiling tritium now so there will be enough 3He when we need it; but that might be too optimistic.
I think both Tokamak and CFS have roughly the same strategy of using bigger magnetic fields. Given the scalings here https://royalsocietypublishing.org/doi/10.1098/rsta.2017.043... + JET working well it's a lot less risk than whatever most others are doing. Make a JET sized tokamak but have 5x the magnetic field strength gives a 625x gain in power, ideally.
SPARK is undoubtedly a more efficient design but it’s not a solution for any of the major outstanding problems.
Note that both companies are aiming to build a tokamak using high-temperature superconducting coils, which will facilitate energy gain in a small, high-field tokamak. CFS has built the coils, but no tokamak yet. Tokamak Energy has built a tokamak, but it doesn't use HTS coils yet, it uses standard/super-inefficient copper ones (they're developing the HTS coils as a separate project and expect to marry them in a future prototype). This prototype has the same "make it up on volume" problem, it's just lossy in a different way.
Both have made important advances that demonstrate critical components that will be necessary to do the full thing, but different ones, and neither of them has demonstrated everything. If anything, CFS's piece is arguably more important, because other copper-magnet high-field tokamaks have been built before (e.g., Alcator C-Mod at MIT, essentially the predecessor to CFS's prototype), but nobody has built a full-sized HTS coil before.
It’s possible they could succeed long term, but I don’t think it’s particularly likely.