You can't just suddenly push more power through the same lines.
> at the cost of transmission losses and tolling
... a key point that I feel you're glossing over.
Transmission losses are not nothing but they are not huge. Maybe 2% to New York (it isn’t they far). Maybe 5% total if you include distribution.
Edit: Follow the lines out of the plant, at 44.978432, -74.797925 they split.
You might need to separate the lines more (and need bigger insulators), but I wonder how much of this gets overbuilt at the point of construction so you can upgrade to run more energy over the same wires without replacing them.
Anyone know?
https://www.nny360.com/news/stlawrencecounty/power-authority...
All of these are about as apples to oranges in relation to geographic ties to Massena as you can get.
Between Massena and those places is a whole lot of nothing for a couple hours.
That's like saying there is some meaningful geographic tie between Bethlehem, PA and NYC (133km), or that "Unity House, PA" is not remote because it's 143km away from NYC and its 8.4mil residents.
This seemed unlikely to me, as transmission grids are built with significant redundancy, especially for the high-voltage networks. For example, the transmission capacity for the 8 500kV circuits from Bruce Nuclear (ignoring 3 230kV circuits) is 1.5 times the generating capacity. I wasn't sure about this particular station, but with a bit of digging, it seems like the Massena-Adirondack lines alone (there are several others) can carry 900MW, which is more than the capacity of the power station. So no additional lines should be needed.
Plus, if you really wanted to because there was no other use, you could, you know, shut down the hydro power plant and return the land to nature. Hydro power plants still have an environmental impact, no point in running them for what is practically, speculation.
Shutting down the dam isn't going to happen. It is split by Canada and the US and does more than just power Coinmint.