However, the current estimate for mission reliability is still below the required threshold (i.e., minimally acceptable) requirement. The program office reported in November 2020 that the helicopter demonstrated an 84.5 percent reliability rate, which is short of the program’s threshold requirement and below where the program office expected the reliability to be at this point in development.15 The program office projects that the helicopter should reach mission reliability of 88.6 percent after operational testing.16 According to program officials, the main causes of the reliability shortfalls have been technical issues identified during developmental testing. For example, the reliability of the main gearbox has been one of the main factors affecting the helicopter’s overall mission reliability metric.17 As mentioned, the program office has mitigation plans in place to address many of those technical issues, but has not yet demonstrated the required level of overall helicopter mission reliability.
Source: https://www.gao.gov/assets/gao-21-208.pdf (p13/14)Considering how many goods and how much money is being blocked up by this the response may be loud from come parties but I doubt governments will care enough to stop it.
Some estimates I saw put the estimate at 10 billion dollars of goods being held up by the jammed ship and the costs of delays caused by sailing around the Cape instead will probably put a multiple on to that number before this is all over. There are construction projects in that corner of the globe worth far less that kill far more than just a few people but that hasn't really slowed them down much has it?
And remember the Suez Canal was closed for 8 years after the 1967 Israel/Egypt war. https://thegamming.org/2014/08/31/how-the-closure-of-the-sue...
Suez Canal
Panama Canal
Straight of Gibraltar- I think
To show what I mean, compare the level of reporting and political backlash from [1], involving two construction workers against [2], involving 11 other deaths, that were only revealed after an audit. Visibility matters. I don't think it's unfair to say that if any deaths happen here that there would be far more global visibility than [1].
And besides, it's a silly armchair idea that doesn't make any sense whatsoever after ten minutes of scrutiny.
[1] https://www.globalconstructionreview.com/news/rio-cycle-path... [2] https://www.globalconstructionreview.com/news/rio-olympic-de...
Sounds like efforts are going into offloading fuel and water tanks while they continue to dig up sand.
Losing a few percent of weight in cargo is worth it.
But in real life these things aren't optimal ;)
An empty forty foot shipping container on its own weighs about four tons and their max supported weight is 33.5 tons, so the problem is somewhere in between for every single container. A Mi-26 helicopter, a "heavy transport helicopter" can only lift 14.5 tons, so there will be crates that can't be lifted.
Even if it was possible, and ignoring the logistical issues, you can't ignore the safety issues. Doing it quickly across seven days is going to lead to human and equipment failure, and somebody's bound to get hurt or killed. Considering how many eyes are on this right now, what do you think is going to happen the first time someone dies?