Re:Plan the Sprint, Not the Project by skellington on Thursday August 20, 2020 @12:03PM (#24224655)
Ignore this person's advice. It is objectively wrong.

How would you build a rocket if you only thought about the next 2-4 weeks?

How would you scope the size of any given project if you didn't think about it in totality?

Successful development is always a balance of waterfall and sprints except maybe when you're in maintenance mode for long living legacy projects.

Waterfall = strategy

Sprint = tactics

Re:Plan the Sprint, Not the Project by aphextron on Thursday August 20, 2020 @05:33PM (#24229281)
>How would you build a rocket if you only thought about the next 2-4 weeks?

We're not building rockets. We're building business software. And the requirements for that are not a hardline set of rules laid out by the laws of physics. They are soft and fungible. Beholden to the whims of a product manager, designer, or client. Generally almost nothing is truly understood about the shape and function of the resulting software at the beginning of a development process. And sticking to a "plan" that was laid out before these things have actually been discovered is a recipe for disaster. Better to build in tiny, discrete chunks of usable MVP that can be used as a guidestone to the next desired level of functionality.

Re:Plan the Sprint, Not the Project by talaketu on Thursday August 20, 2020 @10:28PM (#24231366)
Business software projects can have very clear requirements known months in advance. Eg a project to ensure we comply with newly legislated tax regime. Yes, details will be discovered as the regulations are released, but to embark on that project with a 2-4 week planning horizon would be malpractice.

"plans are useless, but planning is indispensible".

Re:Plan the Sprint, Not the Project by rubidium on Thursday August 20, 2020 @07:54PM (#24230400)
If you’re building business software then yes mostly. Change is cheap.

If you’re actually building a rocket or any other physical thing with real world stuff (like some of us here) you need a real plan. The fits software engineers get into about agile is odd at times. I don’t really get it.

Re:Plan the Sprint, Not the Project by pjmlp on Friday August 21, 2020 @02:54AM (#24232691)
Except that we mostly are, unfortunately getting penalised for faulty deliveries still isn't as hard as it should be.

Also not every department is agile and wants those 6 months delivery plan.

Re:Plan the Sprint, Not the Project by thinkharderdev on Thursday August 20, 2020 @04:28PM (#24228513)
Setting aside the specifics of particular agile methodologies like scrum, etc I think the core insight of the Agile manifesto is that building software products is fundamentally different than building things like rockets. When you are building a rocket you more or less know exactly what you want to build from the beginning so doing a detailed up-front design is definitely the right way to go. When building a software product (or really most software products, there are of course pieces of software that are well specified in advance) you don't know what the end state is or even if there is an end state. The information flow is bi-directional in the sense that observing how the software is used in the wild feeds back into how the software should be designed.
Re:Plan the Sprint, Not the Project by gt565k on Thursday August 20, 2020 @04:55PM (#24228841)
Ughhh, you do realize that there are software systems out there probably just as complex as rockets, as they are, well, used in rockets themselves to control the physical parameters.

You do know what the end-state is. It's called the minimum viable product, MVP. The most successful product owners are ones who are technical and can bridge the gap between the business requirements and technical implementation. For example, there would be no SpaceX and vertical landing of rockets if it wasn't for Elon Musk, who is both an engineer, a businessman, and an entrepreneur. He gets the full picture and can talk to all divisions of the company with incredible competency.

If you have a product owner who knows nothing about building software, in charge of a software product, you'll have a much smaller chance of succeeding, than if you had someone who was both business and technically savvy.

Re:Plan the Sprint, Not the Project by thinkharderdev on Thursday August 20, 2020 @05:25PM (#24229194)
For what it's worth, I agree that the advice in the article is badly wrong. I'm just saying that building a rocket is fundamentally different than building a software product because a rocket is well-specified in advance. To you point, the MVP is different from the product as it will exist once fully realized. And the reason is because you don't know in advance how users will respond. You're not trying to satisfy the physics of rocket flight, but trying to please actual human beings who have weird and idiosyncratic preferences. So you build something (an MVP), let them use it and then incorporate their feedback into the next iteration. I'm with you in the sense that once you have a concrete MVP that you want to build, then you should approach building it as you would approach building a rocket. It's just that you may find that user didn't actually want a (proverbial) rocket, they wanted a helicopter.
Re:Plan the Sprint, Not the Project by iainmerrick on Thursday August 20, 2020 @04:57PM (#24228868)
How would you build a rocket if you only thought about the next 2-4 weeks?

Okay, I’ll bite...

I’ll grant you the 2-4 weeks part isn’t quite right for building a rocket; but the key insight of Agile, of developing in small steps and staying flexible, definitely applies.

You do not start by designing the entire rocket before building anything. Your rocket won’t work. You start, you must start, by building a series of prototypes and exploring the design space. As you do that, you gradually refine your ideas of what’s possible and how to do it. As far as I know, every successful rocket design has followed that path.

Sure, at some point along the path, you put together the blueprints for the final design. So there’s an element of waterfall in there. But staying agile is still critical. Unexpected stuff is sure to come up and you have to retain the flexibility to deal with it.

As others have noted, software is somewhat special in that it’s cheaper and faster to build than physical stuff, can be copied and refactored much more easily, etc. And that shifts the agile-to-waterfall balance where you can realistically talk about working entirely from short term requirements.

Re:Plan the Sprint, Not the Project by rubidium on Thursday August 20, 2020 @07:57PM (#24230412)
Yes and that’s what almost everyone does. Learning loops with prototypes til you have a feasible product. But then you need a big development plan for how to scale it to a polished, sellable product. Because there’s a lot more to the product then the artifact.
Re:Plan the Sprint, Not the Project by lmm on Thursday August 20, 2020 @08:13PM (#24230500)
> But then you need a big development plan for how to scale it to a polished, sellable product. Because there’s a lot more to the product then the artifact.

That's a total non sequitur. Agile is all about building the sellable product. But doing it iteratively works a lot better than doing it via a big development plan.

Re:Plan the Sprint, Not the Project by rubidium on Friday August 21, 2020 @07:13AM (#24233887)
You’re getting downvoted because you may have missed my point.

To clarify for your sake, once you have hardware in the loop (eg mechanical engineers designing things, manufacturing scaling for production) and a large commercial organization who needs to be ready for a product launch, you need a waterfall type plan. Agile principles (customer focus, respond to change) can apply, and you can break up the work into 2 weeks, but you do need to look past the next 2-4 weeks and know where things are planned. Commitments matter in the $millions.

Software-only SAAS has the luxury of avoiding that complexity.

Re:Plan the Sprint, Not the Project by jrochkind1 on Thursday August 20, 2020 @01:42PM (#24226077)
Would you use an 'agile' methodology to build a rocket at all? There some projects not suitable for an agile approach, especially if we're talking "projects" generally beyond software engineering, perhaps MOST aren't. "Agile" is software engineering advice. OP is advance for projects that an agile approach is suitable for. Ie, not building a rocket.
Re:Plan the Sprint, Not the Project by Jtsummers on Thursday August 20, 2020 @02:21PM (#24226580)
Agile isn't, strictly, about software though it certainly is the predominant application. So first, let's separate two things:

- building

- designing

Some parts of agile do apply to building. See Lean Manufacturing, parts of it are responses to maintain quality (Andons used to stop production) and parts are to change over the manufacturing floor to build something else (same plant can make many kinds of cars without a fixed production line for each, letting them meet demand).

Other parts of agile, though, are aimed more at the design portion. Sprints, for instance, are meant to give you short iterations that let you frequently evaluate both your process and your product's success/failure.

You can apply agile concepts to developing almost any kind of thing. Actual rocket scientists create simulations, scale models, full-scale models, prototypes and other things on their way to the final system. So they're already applying the same iterative approach that most agile proponents endorse. The question is, is the iteration deliberate or accidental? Or do they try to deny the iterations even exist? Once they get to building the rocket, that might be less agile depending on circumstances (is it the first one they've built? are they setting up a production line? is it a one off?).

Re:Plan the Sprint, Not the Project by bluGill on Thursday August 20, 2020 @02:59PM (#24227222)
Note that when building cars flexibility is a trade off. You can switch car type, but the jigs for the car you are not currently making is still a cost, separate lines at near full capacity are a better use of resources. Only if you can forcast demand years in advance to build the factory to the right size. This is a hard problem.

Note that flexible factories have other limits. Honda can't make a large truck in their factory as there isn't room. I don't know if Honda regrets this cost or not.

Re:Plan the Sprint, Not the Project by Jtsummers on Thursday August 20, 2020 @03:17PM (#24227479)
I always come back to this:

> Fisher's Fundamental Theorem: The better adapted a system is to a particular environment, the less adaptable it is to new environments. -- Gerald Weinberg,"The Psychology of Computer Programming"

There are always trade offs. The more flexible you make a system, the less efficient it is (most likely) in achieving its (now increased) goals. But the more efficient you make it, the harder it is to adapt it to fit additional or changed goals. Which trade offs you accept depend on your objectives, and sometimes your ability to spin up a whole new factory.

Re:Plan the Sprint, Not the Project by dllthomas on Thursday August 20, 2020 @07:09PM (#24230079)
We can probably force this to be true, to some degree, by defining "adapted" differentially... but otherwise this smells more like a "possibility frontier" situation than a strict spectrum.
Re:Plan the Sprint, Not the Project by jrochkind1 on Thursday August 20, 2020 @03:39PM (#24227787)
I think it's useful to separate building and designing like that. What it makes me think of is: One thing fairly unusual (if not unique) about software is that the designing and the building generally happen "simultaneously", or in tandem, or in very tight iterations. We design software as we build it, and we build it as we design it.

At least often/commonly. If we don't always do that with software, I think we always do it at least to some extent (in an unusual way compared to physical things), and software is (often if not always suitable to designing and building.

I think "agile" as we know it (which is really short for "agile software development", that's what the agile manifesto hasin it's title!) is particular to something you are (or can profitably) design as you build.

While there are analagous things in physical products, and there is (or profitably can be) some element of design/build cycle in physical products, I think rarely to the extent it can and does happen when making software. Rockets are probably at the far end of separating design and build.

But the tldr version is probably just: The Agile Manifesto's full name is literally "Manifesto for Agile Software Development". While some of the things may happen to be useful or applicable in other fields of endeavor, others may not be. Saying that something from the Manifesto for Agile Software Development and ensuing methodology doesn't apply to a rocket is not a relevant critique of the methodology as applied to software, as intended.

Re:Plan the Sprint, Not the Project by Jtsummers on Thursday August 20, 2020 @03:55PM (#24228025)
> One thing fairly unusual (if not unique) about software is that the designing and the building generally happen "simultaneously", or in tandem, or in very tight iterations. We design software as we build it, and we build it as we design it.

I actually had something about that but cut it for some reason.

I'd like to point out that while the manifesto is about software, a lot of the ideas (beyond the manifesto itself and influencing the manifesto) come from other disciplines. Mary and Tom Poppendieck, for example, are major proponents of Lean Software Development, whose ideas are a translation from the world of physical manufacturing. Many of the DevOps ideas (not necessarily how it's played out) come from Eli Goldratt and his Theory of Constraints.

An interesting thing about both Lean and ToC is that neither is terribly prescriptive. They're actually generalized concepts that can apply to almost any kind of system and (mostly) lack prescriptive text saying, "Thou shalt do...". Compare that to much of the Big-A Agile movement which is inflexible, ironically, and often very prescriptive. Perhaps not down to the specific tool that should be used, but often to the specific methods that should be used (Scrum: Thou shalt have 1-4 weeks Sprints; Thou shalt have time boxed meetings of this nature; SAFe: Thou shalt have a massive meeting every 6 months in the format we describe in this chapter).

Ok, that's a bit unfair to Scrum, it's actually more flexible than that. But I'll happily burn my books on SAFe (picked up for a previous job).

Many of the other ideas for Agile are born out of Systems Engineering which had already dealt with Waterfall. You had the V model (an improvement, but still many of the flaws if taken too literally, over Waterfall) which makes V&V run concurrent to design and development and encourages feedback loops. In many ways this is akin to TDD. Incremental and iterative development processes, which are fundamentally no different from Scrum except Scrum pushes you to much shorter times and has a stricter structure. Evolutionary development which is really close to what many, if not most, agile proponents endorse (MVP, then add on features and modify the base as needed). None of that came from software (specifically), it came from developing physical and (in their parlance) cyber-physical systems.

Re:Plan the Sprint, Not the Project by bluGill on Thursday August 20, 2020 @02:55PM (#24227142)
I would use ideas from agile to build a rocket. Automative testing, keeping everything green. Just because there are millions of lines of code left to write before the rocket can take the first test fire doesn't mean I'm not keeping the code in shape that the current features could ship.

But my rocket needs to be ready when the earth-venus system is in the right stage or I delay a few years. Agile cannot handle this. Agile can handle getting rid of some features to meet the deadline, but waterfall can do priorities as well. What is needed is watching the end date and assurance that you will make it, or warning to add people before the cost of adding people is greater than their future contributions.

Re:Plan the Sprint, Not the Project by Jtsummers on Thursday August 20, 2020 @03:40PM (#24227813)
I feel like I write about Waterfall and its problems a lot on this forum, but I'm going to do it again:

> Agile can handle getting rid of some features to meet the deadline, but waterfall can do priorities as well.

Waterfall is not particularly good at handling priorities. It's actually worse, in my experience, than anything else. Waterfall is about the order of doing things (it is fundamentally linear), committing to a plan (lack of flexibility), and has minimal feedback loops (lack of responsiveness).

If you have a 2 year deadline (true deadline like in your example), Waterfall only helps you if you assume everything will go right or put in drop dead dates for lower priority things. But even then, you'll have wasted so much time in your planning and designing you probably won't be able to keep it on track within a reasonable budget extension.

What you really want to handle priorities is an incremental and iterative development model. You know your target, but you break it down into smaller increments and build it out over time. After each iteration you re-evaluate your ability to hit the target. Within each iteration you may use a Waterfall-styled approach (particularly if it's a portion that's well understood in your organization or sufficiently small) or you may extend the iterative approach by adopting an Agile approach (think 3-6 months of 1-2 week sprints).

Using your Earth-Venus example. You need X, Y, Z. You want A, B, C. You only have 2 years to deliver. In Waterfall you'd spend 3-6 months designing everything before building it. If you're smart you design it with a way to drop A, B, and C. But that's a lot of time spent up front on contingency planning and pushes you closer to 6 months. Now you're 18 months from the deadline before production even starts. Oh, and testing doesn't happen until pretty late in this process. So your production is constrained to no more than 12 months in order to allow sufficient testing time (6 months).

If you're actually smart, you create checkpoints/milestones and do it incrementally. You start work on X, Y, Z and as much of A, B, C as you can afford. After 3 months you see that X is progressing fine, Y is possibly going to miss the target, and Z is definitely going to. So you check and A is going to be done in a month, B turned out to be a cluster, and C may complete on time. Cut your losses, B is gone, the money and manpower are moved to the core mission.

Next iteration you reexamine, and find out that you C may still complete but Z is barely back on track. So you take some or all the funding and people from C and dedicate them to getting Z back on track. In the best case C can still be done, but it probably won't. We accept our losses and continue this process.

That is a fundamentally agile approach. It's about responding to the changes that come up. Waterfall is not, in itself, capable of this.

Re:Plan the Sprint, Not the Project by bluGill on Friday August 21, 2020 @08:02PM (#24240237)
Your point is well taken, but one thing waterfall does is the required up front planning to get a good architecture in place. The agile approach tends to ignore such things even though they are critical on something as complex as a rocket.
Re:Plan the Sprint, Not the Project by cuddlybacon on Thursday August 20, 2020 @04:25PM (#24228472)
J. J. Sutherland claims that Saab designs fighter jets using scrum. He claims not only have they been successful from a cost perspective, they also have an easier time staying up to date in the arms race. Pun intended.

He also sites case examples of restaurants and house remodellers using scrum successfully.

Re:Plan the Sprint, Not the Project by jordache on Thursday August 20, 2020 @01:49PM (#24226178)
many real world complex software is also not suitable for dogmatic application of agile/lean principles
Re:Plan the Sprint, Not the Project by jordache on Thursday August 20, 2020 @01:30PM (#24225915)
maybe this person is thinking of a scope similar to an elaborate to-do app?

Many enterprise scale business centric applications have tremendously complex business rules and overreach. One can not simply make a casual decision last minute, and expect perfect execution, towards an end result of increased business value.

EDIT: I see he is a Drupal consultant. There is a very explicit ceiling on the complexities of primarily CMS driven sites.

Re:Plan the Sprint, Not the Project by softwarefounder on Thursday August 20, 2020 @01:25PM (#24225852)
Yep - the hilarious thing is even the most Agile/Sprint heavy consulting companies usually have to succumb to some Waterfall concept in order to provide an estimate or meet a fixed bid.
Re:Plan the Sprint, Not the Project by tchaffee on Thursday August 20, 2020 @04:58PM (#24228882)
Because they aren't good at selling agile.

Why do people ask for estimates or fixed bids? It's to manage risk. And how often do projects not go over estimated budget? Even fixed bids are poor at managing risk. Lots of consulting companies will walk away from a fixed bid contract after months of work at the point they realize they will lose money on it. And honestly, what's the quality of work once the contract is no longer profitable? We've all seen it. Everything is a quick hack at that point in a desperate effort to achieve the minimum that could be defensible in court. A fixed bid project means the consulting company and the client have opposing interests: the consulting company wants to get it done as cheaply as possible and will make every shortcut they can get away with. And the client wants every last bit of quality they can squeeze out of the contract for that price. No wonder it so often ends in dissatisfaction for both sides.

What are the options for the client when the consultant says "sorry we didn't actually finish and we are out of money"? They either pay more or have to be willing to sue the consulting company. Most companies suck it up and pay more. This is so endemic to the industry that most companies put extra in the budget for software project overruns no matter how tight the fixed bid contract is.

So one way to sell agile is to help clients understand how it can help manage risk better than a fixed bid contract or always inaccurate estimates. And how it can be used so that the interests of the consulting company and the client are better aligned.

Re:Plan the Sprint, Not the Project by satyrnein on Thursday August 20, 2020 @07:29PM (#24230237)
I talked to a consulting company once that offered me a fixed price per sprint, with no commitments on how many sprints the project would take. I did not feel like our interests were any better aligned than in a fixed bid contract.
Re:Plan the Sprint, Not the Project by tchaffee on Thursday August 20, 2020 @09:22PM (#24230968)
So one data point. Sounds like they didn't differentiate themselves well enough from the fixed bid contract. The great thing about fixed price per sprint is they have to impress you with progress every sprint or they risk losing the job. That's great at motivating them to deliver value to you every sprint. Another way your interests are aligned: you know how many sprints you want to pay for. That motivates you to prioritize the most important features so they are completed before you run out of budget and sprints. What a great way to manage risk.
Re:Plan the Sprint, Not the Project by davidivadavid on Thursday August 20, 2020 @09:49PM (#24231131)
But lack of alignment is known to be an issue with both flat AND time-based fees.

Charging per sprint is only superficially different from charging hourly/per day/per week/biweekly.

Consultants will want the project to last as long as possible. Clients will want it to be over as fast as possible.

You have to impress the client with every sprint? Just like a regular contractor must impress the client with every milestone.

How do you know how many sprints you want to pay for? So you have a budget, just like any regular old project.

You can prioritize features? But why wouldn't you do that without sprints?

What am I missing?

Re:Plan the Sprint, Not the Project by tchaffee on Friday August 21, 2020 @03:04AM (#24232746)
> But lack of alignment is known to be an issue with both flat AND time-based fees.

Agreed. Agile only puts you in a more flexible relationship. It does not fix every alignment issue. For that you need to be more creative with the contract. However it does spread the risk more evenly. And by you as the client taking on more of the risk instead of pretending an estimate or contract erased it, you will do a better job of managing the risk. Every sprint you'll decide what must be built next. Every sprint you get the opportunity to change requirements. Both of those are far better ways of managing risk than fixed price contracts or estimates.

> Charging per sprint is only superficially different from charging hourly/per day/per week/biweekly.

Not if you are delivering a working product at the end of each sprint. And yes, milestones are somewhat similar to sprints. Except as a client you've now locked yourself into what gets built and if requirements change you've got to renegotiate the contract.

> You can prioritize features? But why wouldn't you do that without sprints?

Because your fixed price contract legally "guarantees" all the listed features will be included.

> Clients will want it to be over as fast as possible.

And you can have that if each sprint ends with a working product. Up to you when the product has enough features included that you are happy with it. Or that you are out of budget. And you've managed risk aligned with the consultant instead of getting an unrealistic estimate they won't meet, or having a to head to court with a broken contract.

Re:Plan the Sprint, Not the Project by Jtsummers on Thursday August 20, 2020 @01:01PM (#24225530)
Waterfall is shit, don't think waterfall. Better is to think about things like work breakdown structures paired with an iterative schedule (aka, sprints). Your WBS establishes the things that you know now, the things that can be done in parallel, and the things that depend on other actions. Your WBS also gives you a rough schedule (but do not take it as gospel because you aren't a prophet). Based on this, you can start prioritizing the work that goes into the iterations. Periodically (with each iteration or after several) you revisit the WBS and determine if what you're doing is keeping you on track, or if it's even still the right structure.
Re:Plan the Sprint, Not the Project by tchaffee on Thursday August 20, 2020 @03:58PM (#24228074)
Agile is the wrong model for building something that must fly or you die. The opposite of much of the software we build where a quick prototype in front of real users gives you far better information than any amount of internal brainstorming.
Re:Plan the Sprint, Not the Project by thinkharderdev on Thursday August 20, 2020 @04:22PM (#24228421)
This is a common sentiment but I don't think it's actually true. Users like software the works and is performant. Putting a quick prototype in front of users doesn't tell you anything beyond what the users think of the quick prototype. Did they have a bad impression because they ran into one of the many edge cases you didn't account for in the prototype? Or is it because the software is ill-conceived and not something they would like even if executed flawlessly. It's hard to tell. I think you run the risk of putting together a crappy prototype and then iterating your way into a local optimum that is still far inferior to what a properly engineered piece of software could be. Or it never gets that far because users hate the initial iteration because it doesn't work very well.
Re:Plan the Sprint, Not the Project by tchaffee on Thursday August 20, 2020 @04:42PM (#24228693)
The vast majority of invented products - software or not - are complete market failures. No one wants to use them no matter how well engineered they are.

When we talk about building an MVP (minimum viable product), the V part is very important. It does have to be useful. It does have to look great and work great. It does have to be performant. Edge cases should not get past your QA department.

So with those constraints, about the only way you can get out a prototype in a sprint or few is by ruthlessly reducing scope until you get to the core part of your product that is adding value. That process in itself results in far better products.

My goal (that I sometimes don't achieve) is that each sprint results in a product we can ship that is better than the last iteration. Run out of budget? Company priorities change? No problem. We still have a useful feature we can ship.

Per my previous comment, this is the wrong process for plenty of products. You have to know what you are building and what the risks are, what the constraints are that you are optimizing for, and the pros and cons of different types of processes before deciding which process is the best fit. If you have a strong idea of what you are building ahead of time and you have experience building those types of things and you know there is already a market demand for those types of things, then by all means come up with a solid plan ahead of time and then execute it.

Re:Plan the Sprint, Not the Project by thinkharderdev on Thursday August 20, 2020 @05:15PM (#24229079)
I agree, but I think the constraints are doing all the work in your statement. I've just been in the position many times in my own career where product managers are pushing to get something, anything out there so they can get "real user feedback" And the V in MVP goes right out the window.

I was responding in particular to "a quick prototype in front of real users gives you far better information than any amount of internal brainstorming." Maybe it's just a semantic difference but to me "quick prototype" doesn't imply look great, work great and handle all edge cases. Perhaps you meant quick prototype that looks great, works great and handles all edge cases but I think that implication is often lost on product people. They want something deployed and don't care if all of the engineering team's fussy edge cases are handled.

Re:Plan the Sprint, Not the Project by tchaffee on Thursday August 20, 2020 @05:33PM (#24229273)
> I agree, but I think the constraints are doing all the work in your statement

Yep.

> I've just been in the position many times in my own career where product managers are pushing to get something, anything out there so they can get "real user feedback"

Me too. There are a lot of bad product managers and even companies out there. But I have worked with great ones occasionally, so it's worth describing the ideal so we know what we are aiming for.

> I was responding in particular to "a quick prototype...

You're right that I need to qualify that because it more often means what you rightly assumed based on your experience. I guess I'm just so in the habit of demanding that we reduce scope that I too easily forget that "quick" more often means the compromise was quality.

Re:Plan the Sprint, Not the Project by rblatz on Thursday August 20, 2020 @05:37PM (#24229319)
SpaceX appears to be doing a form of agile for Starship.
Re:Plan the Sprint, Not the Project by tchaffee on Thursday August 20, 2020 @06:23PM (#24229727)
That's a good point. I think we know enough about building things that fly now and we can do it quickly and cheaply enough that we can build prototypes that fail, and iterate until we get it right.

I could be wrong, but I think that was less of the case in the past. Or perhaps we just didn't know better. Building big expensive things that can kill lots of people - I'm thinking infrastructure, commercial planes, etc - comes along with the idea that we should know ahead of time how we will make it safe without it failing. We can't build a prototype of a skyscraper in a city and have it fall on people. But perhaps the way we engineer those types of things could borrow a lot more from agile than I was initially claiming.

Re:Plan the Sprint, Not the Project by projektfu on Thursday August 20, 2020 @10:02PM (#24231206)
Rockets were an iterative process of gradual and revolutionary improvements that made engines you would actually be willing to put a person or nuclear warhead on top of.

Remember that the “build” phase of software is relatively instantaneous. The design phase is the only part anyone sees anymore. (The heroes who wove the Apollo ROM were examples of actual program builders).

Making the Saturn V static test rocket was heavily design work slowed by manufacturing. Making Apollo 11 was a process of knowing mostly what was needed and building it from start to finish.

Re:Plan the Sprint, Not the Project by maerF0x0 on Thursday August 20, 2020 @08:02PM (#24230438)
its called "Manifesto for Agile Software Development"

Only software is in scope