Re:Plan the Sprint, Not the Project by Jtsummers on Thursday August 20, 2020 @01:01PM (#24225530)
Waterfall is shit, don't think waterfall. Better is to think about things like work breakdown structures paired with an iterative schedule (aka, sprints). Your WBS establishes the things that you know now, the things that can be done in parallel, and the things that depend on other actions. Your WBS also gives you a rough schedule (but do not take it as gospel because you aren't a prophet). Based on this, you can start prioritizing the work that goes into the iterations. Periodically (with each iteration or after several) you revisit the WBS and determine if what you're doing is keeping you on track, or if it's even still the right structure.