They said their main problem was people asking for a 6,000 sq ft modular home for under 200K. They were under the impression modular homes should be cheaper and you should get tons more square footage. Nope, most of the same rules applies to modular homes. It's the process that's faster and which makes it less expensive; but not 300K less expensive.
Pretty sure they went under. Most of the post on their FB page were from 2014: https://www.facebook.com/HiveModular/app/143965932308817/?re...
A normal manufactured home is a much better value, and includes things like code compliance and plumbing.
This isn't just a modern approach. See the Sears kit homes of the early 20th century.
My parents built their ~2800sq ft (not including basement) two story house back in 1976, and it came as a kit on a truck. My dad and uncle, with help from friends, built it, farming out specialist jobs (plumbing, including septic system, etc) as needed.
https://www.claytonhomes.com/studio/defined-mobile-manufactu...
That well may be cheaper than you'd get from a local lumber yard, plus I assume there'll be some labor savings as it's already cut to length.
> $149,591.00 New + $4.49 shipping
I'm laughing pretty hard at the $4.49 shipping. What it's not on prime at this point? : P
With that said, I wonder how hard it would be to sell prefab sections/houses that are already wired for electricity and plumbing straight from the warehouse.
I.e. a manufactured/mobile home?
Project Ara^, only for e.g. "home theater room", "film darkroom", etc.
^ https://www.theverge.com/2016/5/20/11721594/google-project-a...
Edit-Ok after looking at the photos I could see that going for more toward the 500k line. That’s a very nice home.
"DOES NOT INCLUDE WINDOWS, DOORS, PLUMBING, ELECTRICAL, ENGINEERING, FIXTURES. IT IS NOT A STOCK MODEL AND IS MADE TO ORDER. PLEASE NOTE THAT AMAZON's MAX HANDLING TIME IN THE SYSTEM IS 30 DAYS BUT YOU MUST ALLOW 120 DAYS AFTER ORDERING FOR DELIVERY."
At $150,000, how does this compare to building a house from scratch given all that's left out? Seems expensive to me for just walls, floors and a roof.