Re:Dear Client, Here’s Why That Change Took So Long by noego on Tuesday May 07, 2019 @12:55PM (#19851224)
On the flip side, I've seen far too many teams move at the speed of molasses, for reasons unrelated to the intrinsic complexity of the problem. Bureaucracy, analysis paralysis, no automated testing, accidental complexity, tech debt, poor retention of experienced developers, poor compensation resulting in sub-par hires, insufficient training and mentoring for new hires etc etc. I wouldn't be so quick to assume that every single development team is operating at their most ideal.
Re:Dear Client, Here’s Why That Change Took So Long by thanatropism on Tuesday May 07, 2019 @01:51PM (#19851760)
> . Bureaucracy, analysis paralysis, no automated testing, accidental complexity, tech debt, poor retention of experienced developers, poor compensation resulting in sub-par hires, insufficient training and mentoring for new hires etc etc.

Most of these look like MBA problems.

That said, maybe more experienced coders should be doing MBAs (which isn't just about attending classes but about networking, acquiring a wider shallower knowledge base etc) so the dynamics of tech debt are clear to people who are in charge of making debt decisions.

Re:Dear Client, Here’s Why That Change Took So Long by 4ntonius8lock on Tuesday May 07, 2019 @03:27PM (#19852619)
As someone who has spent time as a project and product manager, I will say a lot of it comes down to a point of view that 'tech will make it happen'.

Many times I've seen long time estimates for something, because C level was requesting "X feature". But when you sit down down with C level, and understand what they want to achieve with X feature, many times it is possible to sit down with tech and figure a way to get what was wanted without the feature, generally by adapting some other request or feature.

The problem is that most managers are looking to suck up to C level guys and 'deliver'. And many C level guys won't stand the insubordination of someone telling them 'maybe that thing you guys thought of isn't the best way to achieve what you want', no matter how much you work on the techniques from How to Win friends and influence people. Some guys are just dictators, and some are suck ups, and when the two meet, as they often do, it means tech will work 10x what is needed to get where the company needs to be, because the focus will be on what someone requested, not what we are looking to get at.

Also, many developers get stuck in the mindset of places like that, where they assume they have no voice and everything they say will be used against them. So you ask them as a manager how they would achieve X and they just say "tell me what you want in the spec sheet"... people get weirdly conditioned when in negative re-enforcement environments.

Re:Dear Client, Here’s Why That Change Took So Long by jrochkind1 on Tuesday May 07, 2019 @10:48PM (#19855504)
> because C level was requesting "X feature". But when you sit down down with C level, and understand what they want to achieve with X feature, many times it is possible to sit down with tech and figure a way to get what was wanted without the feature, generally by adapting some other request or feature.

In the best functioning development organizations I have experienced or seen, nobody should be asking for "X feature", they should be explaining what their actual needs are, what they need to get out of the software and why. And how important it is to them, or even what their "budget" for it is.

And a technical designer (who could be a developer who has some design skills perhaps by experience, or a designer who understands the tech) _designs a solution_.

This requires someone(s) on the "development" side who can do needs/requirements analysis leading design (ie, "UX"). And it requires the stakeholders to trust that the capacity is there, and that it will turn all right if they don't try to micromanage the feature -- not just "all right", it'll be SO MUCH BETTER.

This works so well when the organization staffs itself to make it possible and the people in charge allow it to happen, that it seems kind of insane that so few organizations do so.

Re:Dear Client, Here’s Why That Change Took So Long by robbiemitchell on Tuesday May 07, 2019 @11:44PM (#19855702)
You just described product managers.

They solicit needs from customers, support conversations, etc. and translate those into future development. They combine those needs into major product directions and balance them with an internal compass for where the companyw wants the product to be (i.e., what jobs they want to solve for which users.)

They are technical people with an eye for how something should be built, working closely with designers (visual, UX, etc.)

Excellent companies figure out how to deploy these types of thinkers -- with appropriate mandate -- throughout the organization.

Re:Dear Client, Here’s Why That Change Took So Long by 4ntonius8lock on Thursday May 09, 2019 @12:53AM (#19865505)
Though you know, sometimes organizations fall into this issue in other areas.

I once worked with a company that had that attitude toward accounting/compliance - so much more work and all because the primary holders were not in agreement, so they kicked the corporate structure can down the road.

Same goes for CS, etc.

I guess the only solution is a holistic approach, but even then sometimes someone will have to bear the brunt of being the area where people will 'will handle it', at some point a CEO will decide that is what is needed and it will be needed, even in a perfect organization.

Re:Dear Client, Here’s Why That Change Took So Long by arvinsim on Wednesday May 08, 2019 @06:20AM (#19857482)
I am pretty sure that my Product Manager has no technical experience at all. And I assume that it's not mandatory for them.

If they are supposed to be technical, then we hired wrongly.

Re:Dear Client, Here’s Why That Change Took So Long by pureliquidhw on Thursday May 09, 2019 @09:42AM (#19868173)
Technical enough to understand, but probably not technical enough to build (but maybe was at some point). That's where they need to live. Their job is to align the devs and the roadmap with the business needs, prioritize what bugs to fix, and decide which enhancements are worthwhile. They also need to know when the team is bullshitting them and when a tech design is too complex or simple.

I can imagine a non-technical person could end up in this role and succeed, but someone with a technical background and some business acumen will have a much higher probability of success.

Re:Dear Client, Here’s Why That Change Took So Long by repolfx on Wednesday May 08, 2019 @05:22AM (#19857186)
Well, because stating needs and not implementations disempowers managers and means they're left with no feeling of grip. It makes it hard to imagine what you'll actually get and whether it'll be useful, which is scary. Plus, what people need is often so vague that literally anyone could have come up with it and it's embarrassingly obvious. If a manager goes to his tech team and says, "I need to make our business more efficient. Think of something!" then this may be the best way to get results because often the programmers understand the business as well as or better than the managers and they understand the codebase, but who would respect a manager who said that? It'd be Dilbert cartoons all over.

This is one reason why tech firms win. Their senior management are made of [former] engineers who are much more aligned with the workers around what implementations make sense.

Re:Dear Client, Here’s Why That Change Took So Long by jrochkind1 on Wednesday May 08, 2019 @11:06AM (#19859508)
That's why it's an actual skill to translate needs to implementation. It's not one most managers have either, is why when the managers just give you implementation it does not work.

The skill includes working with the stakeholders to develop actionable needs (not just "make our business more efficient"; the obvious place to go from there is, okay, what do we know about where the greatest bottlenecks/inefficiencies are now, if we don't know enough what can we do to learn?).

Also you don't just take needs and come back with a finished feature, you iterate with feedback from the stakeholders. The first iteration might just be a textual description of the feature, to make sure it makes sense to the manager/stakeholder.

It's a skill, and it involves building trust.

But translating needs to features that will succesfully meet those needs is not a skill most managers/stakeholders have either, is exactly why it doesn't work to just get detailed micro-managed implementation directions from managers/stakeholders. (Or customers!).

Re:Dear Client, Here’s Why That Change Took So Long by jen729w on Tuesday May 07, 2019 @05:23PM (#19853570)
My boss/friend just sat (passed) his PMP [0] exam and was talking to me about it as he learned. The main thing that I learned is that the amount of time they say you need to spend planning a thing is waaaaaaaaay longer than we’ve ever spent planning a thing. Orders of magnitude longer. And you plan it multiple times over, with rounds of stakeholder engagement, rounds of risk analysis, rounds of breaking it down and analysing each component and figuring out what it is and how long it will take and what can go wrong and the dependencies and so on and so forth ... and then going back and doing it again until you’re sure it’s correct.

Why do we, as an industry, expect to be able to run a project to schedule when we often give it the most cursory of glances in the planning stage? I work for a very large integrator and we don’t plan at all. We jump in and start while we’re ‘planning’. It’s absurd.

He and I have long said that if the people who built [hospitals|bridges|aeroplanes] behaved the way we did, the world would look very different [1]. Now, thanks to my recent PMP-by-proxy, I’m starting to understand.

[0]: Project Management Professional. One of the main accreditations for project managers, I think PRINCE2 is the other one.

[1]: I’ve seen the project schedule for a railway line extension. “You really plan a concrete truck coming three weeks from now down to the half-hour?”, I asked my friend. She does.

Re:Dear Client, Here’s Why That Change Took So Long by Buttons840 on Tuesday May 07, 2019 @05:31PM (#19853650)
> you need to spend planning a thing is waaaaaaaaay longer than we’ve ever spent planning a thing. Orders of magnitude longer. And you plan it multiple times over, with rounds of stakeholder engagement, rounds of risk analysis, rounds of breaking it down and analysing each component and figuring out what it is and how long it will take and what can go wrong and the dependencies and so on and so forth ... and then going back and doing it again until you’re sure it’s correct.

Yuck. I think the agile approach might be better here. It's better to expose your plan to reality ASAP and adapt along the way.

Except, that's not how agile really works. How agile works is "bosses" have an hour planning meeting, and then act as though they have a veeeeery robust plan (like you talk about) and get upset if things do go according to their quick one-hour plan. So much for adapting along the way.

Re:Dear Client, Here’s Why That Change Took So Long by jen729w on Tuesday May 07, 2019 @06:08PM (#19853912)
So I just said that in order to get a project planned properly you need to spend way more time planning it, and you literally said "yuck", let's use agile instead. Which is ... not planning it properly.

And anyone wonders why we're in this situation? We dug this hole, kids. (And to be clear, I'm guilty. I'm not trying to be better than anyone. I am not! I'm just attempting to explain it.)

Re:Dear Client, Here’s Why That Change Took So Long by Someone on Wednesday May 08, 2019 @03:39AM (#19856685)
Agile works well for redecorating a house (“let’s paint the walls first, and worry about the couch later”), less so for building one. That requires more foresight, larger-scale planning, and writing things down.

With agile, building houses still somewhat works because people will do that planning in their heads. So, knowledge will end up _only_ in people’s heads, not even in everyone’s heads, and will deteriorate there, even if those people do not leave the project.

So, by the time it’s time to do a large-scale update to the house (add a room, update ventilation to modern standards), nobody knows where the ventilation ducts run, why one of them is so much larger, that there’s asbestos in the ceiling, etc.

And of course, some people try to use agile not for building houses, but for building apartment blocks.

Re:Dear Client, Here’s Why That Change Took So Long by bartread on Wednesday May 08, 2019 @02:18AM (#19856319)
It's many years since I read this but I seem to remember the original impetus for agile was an internal software development team having a mix of longer term goals, and then lots of reactive work/support. Possibly the latter making up the majority.

It was a way to bring some sense of order to what was chaos: new requests coming in all the time, work being dropped partway through to deal with the new requests, little progress on any front.

I think agile works really well in this kind of context by bringing in a sense of discipline and keeping new work at bay until the beginning of the next cycle[1]. It can also help to keep teams delivery focussed in other contexts but, key point, does not obviate the need for additional planning outside the sprint/iteration framework.

The problem really occurs when people treat agile as sufficient on its own, or as the one project management tool to rule them all. Total nightmare, especially with multiple teams involved.

[1] How workable this is in practice is open to question: I can tell you it's not always a great approach in an environment where client projects typically last a few days and on time delivery has been known to depend on a critical bug fix for a legacy codebase. Especially problematic when requests come in either during the launch phase, because there's usually a fairly hard window, or during the reporting phase, because there's a delivery deadline looming.

Re:Dear Client, Here’s Why That Change Took So Long by HillRat on Tuesday May 07, 2019 @08:11PM (#19854677)
Agile doesn’t excuse you from having to do the work of resourcing, budgeting, business alignment, goal setting, sprint planning, acquisition, and so on. For bite-sized projects with just a few developers, it’s less of an issue, but for a project covering PMO, design, QA, change management, and multiple technical workstreams you have to have — and need to communicate to the business — at least a reasonable idea of what you’re getting into.

You ain’t wrong about how most businesses implement “agile,” though. :)

Re:Dear Client, Here’s Why That Change Took So Long by bobf on Tuesday May 07, 2019 @10:29PM (#19855420)
Not that it's the best or only methodology to project planning in a given scenario, company, or industry, but I do think there's significant value in PMP training. I completed the PMP exam in 2012 after being encouraged by a coworker, and I see it as both useful and cheap enough to suggest it to most software/hardware developers.

Learning and applying "how to plan a project" has pretty universal career relevance. I suggest 30-40 hours of study time, and it's around ~$600 to buy the book, take the exam, etc.

Re:Dear Client, Here’s Why That Change Took So Long by noego on Tuesday May 07, 2019 @03:58PM (#19852910)
Many times, they are indeed MBA problems. VPs micromanaging instead of delegating, not investing enough money into hiring, retaining and developing their talent, etc.

Other times, it is a problem with the existing developers. Choosing not to learn/follow industry best practices. Creating an over-engineered solution instead of a simple one. Skimping on automated testing and spending more time on manual testing instead. Making their colleagues wait an inordinate amount of time for a simple question, code-review or approval. There are many things developers can do that would slow down their team's productivity.

I don't think tribal finger-pointing is very productive. It really does vary case-by-case.

Re:Dear Client, Here’s Why That Change Took So Long by laughfactory on Tuesday May 07, 2019 @06:20PM (#19853981)
Ugh. MBAs? No thanks. Usually it's interactions with MBA-holding folks that gives me heartburn. They try to mechanize everything. I agree that an MBA education is probably fairly useful for developers, as long as you can retain your perspective and balance the two worlds--they are very different after all. I'm _very_ business-minded (though I don't have an MBA) and I still run into extensive frustration when I get these kind of queries from the business: why is this taking so long? As this article laid out well, the change or new feature is often conceptually simple but there can be _so_ much required to make conceptually simple things actually happen. Unless you have real development experience before becoming "management", I doubt it's possible for a developer to truly convey that complexity to you. Ultimately it ends up becoming a matter of trust, and frequently competent managers realize over time something along the lines of "well, if every developer I've ever had has taken a long time to deliver conceptually simple things then perhaps that means there's a lot to do to deliver things I think are simple." Sadly, there remain some managers who remain convinced, in the face of all evidence to the contary, that all developers are lazy, slow, and just need to be whipped more and harder.
Re:Dear Client, Here’s Why That Change Took So Long by novaleaf on Tuesday May 07, 2019 @01:56PM (#19851830)
my own anicdata: Integrate a default proxy into our existing "choose proxy" workflow takes about 2 weeks, and I'm currently on my 3rd month of those 2 weeks :)

Reasons for the delay:

1) Proxy is a stand-alone application. Needs it's own deployment and build configuration 2) Main app was running on Node 6.x. High time to upgrade to 10.x as 6.x LTS is running out. 3) Upgrade to 10.x breaks some modules we depend on (Google Cloud datastore) and that module has been deprecated in Node 8.x+.. time to refactor that.... 4) Main app is in a mono-repo with backend systems still running node 6.x Don't want to spend the time upgrading everything to node 10, so need to split Main app into it's own repo, decoupling from existing mono-repo codebase 5) Since we are upgrading main app to Node 10, Best to remove dependencies on old definitely-typed typescript typings (upgrade to npm @types definitions). And as such refactor to use latest version of all modules.... 6) Security: New Default Proxy should only allow the Main app. code a solution for this using Keypairs.... 7) Docs, sample code for users, announcement mail.

thankfully i'm currently on step 7. Usually I expect to be off on my estimates by a factor of 4x. This is excessive :)

Re:Dear Client, Here’s Why That Change Took So Long by elemeno on Tuesday May 07, 2019 @02:14PM (#19851985)
But in a case like yours if sounds like steps 2 through 5 aren't strictly relevant to the change you're making, so it's no wonder that your estimate is blown out the water. (Sorry if I'm wrong, you've obviously got more context on your own platform than I do!)

It does make me wonder though if there is a trend of 'hiding' necessary maintenance work in larger tasks - if so that seems to me to be indicative of a larger problem around not being given/making the time to do those jobs as their own tasks.

Re:Dear Client, Here’s Why That Change Took So Long by hinkley on Tuesday May 07, 2019 @02:19PM (#19852041)
Yes, there is. Probably the best four projects I worked on, there was collusion to spread out the cost of necessary maintenance across all work items. Because nobody will agree to doing maintenance stories (this is how Scrum hijacks developer ethics). Never ask permission to do something that must be done.

Or to look at it another way, if no stories are maintenance stories, then all stories are maintenance stories.

Re:Dear Client, Here’s Why That Change Took So Long by novaleaf on Tuesday May 07, 2019 @03:29PM (#19852641)
I used to be all about jumping on the next fancy thing as soon as it was (pre)released. Having been burnt and learned my lesson, now I delay until it's blindingly obvious it needs to be done.

But yeah, if it needs t be done, do it.

Re:Dear Client, Here’s Why That Change Took So Long by Sharlin on Tuesday May 07, 2019 @05:24PM (#19853579)
Version x.y.0 of most software is "public beta" quality. x.y.1 is "release candidate". x.y.2 might be production-ready.
Re:Dear Client, Here’s Why That Change Took So Long by hinkley on Tuesday May 07, 2019 @02:16PM (#19852002)
You need to get an agreement with the team that you're going to amortize future upgrade treadmill activities across all work that is done. You can't mortgage future productivity to get short term gains when your project is supposed to run for 5, 10, or 20 years. You'll spend most of your time working slowly if you work that way.
Re:Dear Client, Here’s Why That Change Took So Long by novaleaf on Tuesday May 07, 2019 @03:18PM (#19852553)
yours and a lot of other comments seem to hint that this work may not be strictly required? I'm a bit surprised.

At least in my case, as a public facing SaaS I don't think running Node 6.x past it's LTS window is a valid choice, so better to bite the bullet now. If I went about doing the minimum work, it just adds more code/complexity that needs to be refactored when upgrading Node.

Re:Dear Client, Here’s Why That Change Took So Long by Techonomicon on Tuesday May 07, 2019 @03:47PM (#19852806)
People are hinting that it is not strictly required to get what was initially desired done.

And that seems 100% true.

You do not have to do everything at one time. You can easily to one thing, and then right after that, literally right after, do another.

You could have gotten the proxy up and going, and then upgraded node.

It's not about "doing the minimum work" it's about understanding the problem space, what can be split up, and how to attack the surface area efficiently.

You're also introducing other problems that can occur by doing multiple things at the same time.

Generally speaking I advocate my developers to be really good at separating problem spaces and attacking accordingly. It's really hard to take on multiple issues at one time and actually have high confidence in not breaking many systems along the way.

Re:Dear Client, Here’s Why That Change Took So Long by novaleaf on Tuesday May 07, 2019 @04:15PM (#19853036)
okay thanks for the tips, you and everyone else :)
Re:Dear Client, Here’s Why That Change Took So Long by hinkley on Tuesday May 07, 2019 @03:46PM (#19852799)
No, it has to be done. But some people won't believe it until they've had a couple tough upgrades that show the cost of laxity.

On one project there were CERT advisories out, and we had deferred upgrades due to breaking changes in those upgrades. All of a sudden we had to deal with the upgrade and a security issue at the same time. It was ugly. After the second time, we started putting at least one upgrade story per month on the work queue. Sometimes we let the engineer pick what they wanted to upgrade (just upgrade something!). Other times we picked the engineer for the work that needed to be done.

Re:Dear Client, Here’s Why That Change Took So Long by Symbiote on Tuesday May 07, 2019 @03:53PM (#19852868)
You either need to upgrade from Node 6 or you don't.

That's nothing to do with adding a new feature, and should be planned accordingly. It's unfortunately very common for developers to hide maintenance tasks in other work, but clearly not ideal.

Re:Dear Client, Here’s Why That Change Took So Long by chris_wot on Tuesday May 07, 2019 @04:22PM (#19853104)
I agree. However, to be devil's advocate - quite a lot of developer teams aren't allowed to migrate to new systems until way too late, so it's not surprising they do it in unrelated feature requests/bug fixes.
Re:Dear Client, Here’s Why That Change Took So Long by stickfigure on Tuesday May 07, 2019 @02:31PM (#19852145)
While all platforms have some measure of this phenomenon, the update treadmill problem does seem to be especially acute in the javascript ecosystem.

I update Java dependencies maybe once a year; it's usually painless and incompatibilities are highlighted by the type system. If you let your JS dependences get stale by a few months, you're looking at hours or days of work. And that doesn't count the massive shifts in build systems and frameworks that seem to happen annually.

Re:Dear Client, Here’s Why That Change Took So Long by novaleaf on Tuesday May 07, 2019 @03:24PM (#19852599)
I've spent the last 5 years on Node, and honestly most modules are fine. The only ones I've had serious problems with are those created by Google. They keep taking huge complex dependencies on things like Grpc that break between Node versions, and keep churning their other library signatures (or deprecating entire modules).

Maybe in the last year they've settled down, maybe not. I learned my lesson and don't take dependencies on them anymore. Much easier.

Re:Dear Client, Here’s Why That Change Took So Long by tracker1 on Wednesday May 08, 2019 @03:29AM (#19856636)
I just spend maybe half a day a month updating everything to the latest and testing. There are the occasional gotchas, but it's not so bad... When you leave a codebase to rot for a few years, it doesn't surprise me that it's more painful.
Re:Dear Client, Here’s Why That Change Took So Long by Balgair on Tuesday May 07, 2019 @02:15PM (#19851994)
My own 'magnification' index is as such:

Take whatever time I think it should take. Then double that number and go up one time unit.

Exp: I think it should take me 3 hours this afternoon to do this -> 6 days.

I think it should take me 2 days to to this -> 4 weeks.

I think it should take me 1 week to do this -> 2 months.

I think this should take us one month to accomplish -> 2 years.

Re:Dear Client, Here’s Why That Change Took So Long by zbigniewc on Tuesday May 07, 2019 @02:35PM (#19852175)
Such approach assumes that literally all tasks are minefields full of unpredictability. But are they really? In my experience such reasoning and 'magnification' applies only to minority of cases, while most of the time you hopefully deal with well-enough understood domain and codebase to accurately estimate the effort based on the initial judgement.
Re:Dear Client, Here’s Why That Change Took So Long by Balgair on Tuesday May 07, 2019 @03:57PM (#19852894)
For me, it's more of a guestimating rule. Sure, some tasks take less than I'd expect them too. Sure, some take a LOT longer than even my guesstimate. But this helps me 'plan for drought and pray for rain', so to speak.
Re:Dear Client, Here’s Why That Change Took So Long by yebyen on Tuesday May 07, 2019 @04:54PM (#19853349)
To clarify why this strategy is not as bad or egregious as it seems, one must only ask: what are the consequences of overestimated time for work (that gets delivered early?) And what are the consequences of underestimating work?

Would you rather deliver a product with finished surfaces or cut corners? Proper design and good overall test coverage, or zero budget for maintenance?

It also helps to understand that management will ultimately decide that we need to do the project in half the time, and with these extra features you didn't ever plan on building.

My budgeting strategy is to always assume that for whatever scope you have planned, 50% of the complexity that you will need to deliver in order to reach the finish line, remains unknown at any given stage of planning. Compensate upward if there still remain known unknowns.

Re:Dear Client, Here’s Why That Change Took So Long by cgio on Tuesday May 07, 2019 @06:29PM (#19854025)
The consequence of overestimating is you don’t get the project. Occasionally that’s the consequence of proper estimation too, as people tend to underestimate when selling the project to get it through. Once I estimated a project at 3 months team of 5. They told me it should be 3 months team of 2. “We are doing sales mate” they told me. “You are, I am doing delivery” I responded, and then did neither sales nor delivery. ..
Re:Dear Client, Here’s Why That Change Took So Long by yebyen on Tuesday May 07, 2019 @07:35PM (#19854468)
Estimates for internal client is a different ballgame than estimates for sales, it would seem.

My approach to the same project would be different if I know that I get to walk away when the project is over, versus if I know I'll be the one to maintain the project when this phase is over and it goes into production. I work for internal clients lately, and I can't honestly say it's my way or the highway, but if you ask for an estimate, I'm going to give you an estimate.

If you tell me the deadline then we're having a different conversation entirely. (And that's OK! Deadlines are better than estimates in my book, especially if the consequence of missing the deadline is some unfinished garbage goes to production, or doesn't ship at all as we had to move on to the next thing. If you asked me for an estimate and told me "that's too much, do it in less" then you didn't really want an estimate, did you? Just tell me the deadline and I'll deal with it, in that case, let's not play games.)

Here's another approach: tell me how much time you want to spend on this project, then I'll put a pen to paper and tell you what part of the scope we can deliver given the resources you've allocated. Don't like that very much? OK, you write the plan and I'll say "yes sir." But that's not why you pay me, is it?

Estimates are a function of scope, time, and cost. If you tell me to do it in less time, I'll do it in less time, but it's going to come at the expense of one of either feature scope or quality. This is not a negotiating tactic, it's just a statement of fact. If you tell me I have to shave off a bunch of time without sacrificing anything, then we're not having an honest conversation and we're not going to have a good time. I'm sorry you had a bad experience, mate.

Re:Dear Client, Here’s Why That Change Took So Long by Drdrdrq on Tuesday May 07, 2019 @05:29PM (#19853622)
For me it works pretty well if I imagine someone else (another team member who is less experienced) doing the job, and myself reviewing the code. It turns out my estimates about other people's work are much more accurate... :)
Re:Dear Client, Here’s Why That Change Took So Long by falcongod082 on Tuesday May 07, 2019 @05:45PM (#19853735)
This is brilliant.
Re:Dear Client, Here’s Why That Change Took So Long by sneak on Tuesday May 07, 2019 @01:30PM (#19851559)
The real trick is being able to tell the difference between a normally slow process and a pathologically slow process, on non-trivial scales. I’m 20+ years in and I’m just getting a handle on it in the last 5 years or so.

Meanwhile, I see non-software people putting their complete trust in people with less than half my experience, and getting burned.

Re:Dear Client, Here’s Why That Change Took So Long by hinkley on Tuesday May 07, 2019 @02:23PM (#19852070)
Limited Work in Progress tries to address this. The longer a task takes the more scrutiny it gets from hopefully sympathetic individuals. If you are chasing your tail, after a week or two someone who understands what's going on will unwind you and set you up to complete the task.
Re:Dear Client, Here’s Why That Change Took So Long by Retric on Tuesday May 07, 2019 @03:01PM (#19852385)
That’s irreverent as each estimation is based on that team and it’s situation. If I am going to spend 20 hours a week stuck in meetings that’s going to impact my estimates.
Re:Dear Client, Here’s Why That Change Took So Long by hnlmorg on Tuesday May 07, 2019 @05:25PM (#19853594)
It shouldn't do. Estimations should be based on FTE (full time equivalents) of the broken down tasks. An estimation shouldn't be guesswork of a delivery date based on your current teams situation but rather a calculated value of the number of days of effort (eg it would take 1 person 82 days if they worked on it for 7.5 hours a day) with a little margin added for any unforeseen technical hurdles that will inevitably crop up.

If estimations are based on FTE then you can factor in meetings, holidays, and even other projects that might suck up resources ("resources" in this case being your engineers work time) into your delivery date. You can detect very early on if your deadlines are slipping (assuming your team are logging their hours against tickers or a timesheet) and you can also make informed judgements ahead of time about whether you need more resources (were that's an option / the work can be scaled across more engineers).

Obviously this is harder if you're tackling a significantly larger "green field" project - you might have to start making some educated guesses in those instances. But most of the time you should have some idea about the work involved.

Re:Dear Client, Here’s Why That Change Took So Long by Retric on Tuesday May 07, 2019 @05:39PM (#19853700)
Accurate time estimates need to be associated with specific individuals. Someone who is familiar with the relevant code is simply faster than someone who is not. Further, interruptions don’t just cost time, they also reduce productivity around them.

Now, you can try and do effort estimates using hypothetical people. But, at that point you have already given up the possibility of an accurate answer.

Re:Dear Client, Here’s Why That Change Took So Long by hnlmorg on Tuesday May 07, 2019 @06:02PM (#19853858)
> Accurate time estimates need to be associated with specific individuals. Someone who is familiar with the relevant code is simply faster than someone who is not.

This is one of the many reasons why I disagree with giving projects to specific individuals. Not only do you end up silos of knowledge (which is a risk if that engineer should leave / get fired / die in a bus accident) but you also make it harder for yourself to make estimates for the reasons you've described. Sure there will always be a variance from person to person but you stand a greater chance of that averaging out if you discourage engineers "owning" code bases.

> Further, interruptions don’t just cost time, they also reduce productivity around them.

You missed my point regarding meetings. I'm saying if you estimate a project based on FTEs (different methodologies and frameworks will have different terms but they usually amount to the same concept) then time spent in meetings becomes a modifier you can easily adjust for, rather than a hidden time sink that you can't account for.

> Now, you can try and do effort estimates using hypothetical people. But, at that point you have already given up the possibility of an accurate answer.

You don't need to make the estimate on hypothetical people. You just need a system of tracking and reporting the hours people spend in a working day. For example in JIRA you can log time against a ticket and you can create generic tickets for meetings. Therefore after a week / sprint / arbitrary point in time you can view where your engineers have spent their time and if it's below the allocated time for that project you can then either:

- enforce a new policy (eg are all the engineers going to every meeting when just one or two representatives would suffice? Are some meetings just duplicates or redundant? etc),

- inform project managers that there will be a deadline slippage due to resource constraints

- hire more resource to compensate

- or all of the above

I agree estimates are never going to be 100% accurate but that doesn't mean there aren't better ways to estimate than just applying guesswork based on your current teams circumstance.

Re:Dear Client, Here’s Why That Change Took So Long by Retric on Tuesday May 07, 2019 @07:17PM (#19854352)
I agree estimates are never going to be 100% accurate but that doesn't mean there aren't better ways to estimate than just applying guesswork based on your current teams circumstance.

The entire dev team walks out, and yes this actually happens surprisingly often and could happen to you’re team tomorrow. Now, what happens to all your estimates?

Well clearly anything short term is now worthless. You can build a new team and use older effort estimates as a guide, but with different skill sets and a massive learning curve they in no way translate into FTE hours.

Effort estimates can survive those kind of transitions. But, time outside of a functional team is not meaningful.

Re:Dear Client, Here’s Why That Change Took So Long by hnlmorg on Thursday May 09, 2019 @04:50AM (#19866492)
> The entire dev team walks out, and yes this actually happens surprisingly often and could happen to you’re team tomorrow. Now, what happens to all your estimates?

The estimate is still the same because, at risk of repeating myself, you estimate on FTE and not wild guesses at a project end date. Thus you then go back to your project managers following the steps I outlined in my previous post.

Granted in the most extreme of situations you would need to factor in some upskilling time - maybe even get the team to re-groom the tickets (if you're following the agile methodology) but your method of making wild guesses wouldn't put you in any better a position should your edge case example happen. So you're not exactly winning any arguments by raising this point.

When running projects, estimations are based on the required work to do, not the team itself. Teams can fluctuate (as you keep pointing out) where as the work required should be closer to a constant. Thus any feature creeping that happens - as often does happen in software projects - gets captured and costed before so budget holders aren't surprised by hidden escalations in costs. Delivery date is then derived from totalling up the required work.

If you have a hard end date for delivery then it's up to management (eg yourself as a hiring manager, the companies board and the projects PM), to decide if you reduce the complexity of the project, do a staged release, hire more staff or even argue if the requested delivery date can be extended.

The above is how software projects should be run when they're managed properly. Other places might do things a little more adhoc but in my professional experience that almost always ends up being a worse way of managing a project, budgets and teams.

Re:Dear Client, Here’s Why That Change Took So Long by Retric on Thursday May 09, 2019 @08:05AM (#19867439)
Hiring more staff always slows progress in the short term. It has a habit of making late projects later. https://en.m.wikipedia.org/wiki/Brooks%27s_law

I understand you’re desire for an FTE to be a meaningful measure, but imperially that’s not true. As I said several times effort estimates can be used, but after deciding to add staff progress slows down for a while. So, using effort estimates you would reduce progress over the next 3 months before expecting a longer term increase in rate of accomplishment.

Re:Dear Client, Here’s Why That Change Took So Long by hnlmorg on Thursday May 09, 2019 @08:35AM (#19867687)
> Hiring more staff always slows progress in the short term. It has a habit of making late projects later.

Brooks law applies to late projects, not new ones. If you have good estimates you can determine if you need resources early on.

All a lot does depend on the size of the project. If it's something that will take 12 months or longer than extra hires definitely wouldn't have that affect. Depending on the hire and the work required, you can shorten than time frame significantly too.

However I do agree that hiring isn't a silver bullet. This is why I suggested "hiring" as one of many outcomes that can be considered rather than the preferred outcome in all situations.

> I understand you’re desire for an FTE to be a meaningful measure, but imperially that’s not true. As I said several times effort estimates can be used, but after deciding to add staff progress slows down for a while. So, using effort estimates you would reduce progress over the next 3 months before expecting a longer term increase in rate of accomplishment.

This is where another piece in the jigsaw comes into play - an employee might not be 1 FTE. They might be part time, might have leave booked, might have commitments on other teams (effectively part time from your perspective) or might be a new hire so need upskilling time. Those are just a few common examples - I'm sure you can think of others.

This is why I keep reiterating my point about calculating your figures based on work required from FTEs. By talking about new hires as you are, you're again thinking about "teams" rather than "work required". When you look at work required then you can use your team as a variable in the calculation and instantly estimations become easier.

I'm undoubtedly explaining the process poorly but I do strongly recommend you read some books or articles online about managing projects and teams using (for example) agile methodology - even if you've already worked in places that employ scrum (again, for example). You could potentially really improve how you estimate work which in turn will improve how you manage your team. From personal experience, I've been a manager for a number of years and have found my skills really improved as I've adopted those lessons too.

Re:Dear Client, Here’s Why That Change Took So Long by irq11 on Tuesday May 07, 2019 @01:31PM (#19851579)
I’m dealing with this right now. A team that is downright arrogant about reducing their well-padded schedule, taking months to do a job that should take weeks, at most. Getting them to do anything is like pulling teeth, and accompanied with lots of arrogant lectures about how hard it is to estimate, how you can’t rush quality, and so on.

It’s mostly bullshit. This team has historical reasons for their bloated schedules, but at root, they’ve simply been coddled, and never forced to justify their behavior.

I’ve been on both sides of the table now. Developers like to gripe and moan about “unrealistic” schedules, but without aggressive pushback from management, a huge number of programmers will simply never ship.

Re:Dear Client, Here’s Why That Change Took So Long by hinkley on Tuesday May 07, 2019 @02:27PM (#19852106)
That knife cuts both ways. I am fundamentally a clever lazy person. I'm always looking for ways to reduce the amount of accidental complexity I have to do, and reduce the number of trivial interruptions I get by documenting the situation a little better every time someone asks me about it, until the rate drops below my pain threshold.

If it weren't for schedules I'd have no defense at all for 'wasting time' on something that saves each of my teammates an hour of pain per week. (I've had a lot of shitty managers. Stuff like this shouldn't need a defense).

Re:Dear Client, Here’s Why That Change Took So Long by zoomablemind on Tuesday May 07, 2019 @04:44PM (#19853277)
>"...taking months to do a job that should take weeks, at most..."

Well,this is basically lack of trust between you and your devs. Or lack of common understanding of priorities. I'm not sure if you're a project mgr or a client, but clearly some expectations are misaligned. Perhaps you don't see their barriers or they don't agree with your priorities

The existing contract doesn't work, so some mediation is due to close that distrust before any damage is done. After all it's the team that you currently consider yours.

Re:Dear Client, Here’s Why That Change Took So Long by irq11 on Tuesday May 07, 2019 @04:56PM (#19853370)
”Well,this is basically lack of trust between you and your devs”

It’s pretty amusing how many definitive responses I’m getting from devs who are diagnosing my problem without any knowledge. It’s also telling how different they are.

Like I said, there are reasons, and I’m aware of them. I’m also fully aware of the technical barriers.

The devs are padding their schedule, and think they’re being clever about it. They are not. Some of it does boil down to trust (i.e. bad history with previous managers), but a lot of it is just that they don’t want to do the thing because it’s less fun than other things, and nobody has ever held them to account in the past. A sufficiently lazy developer will find endless Legitimate Technical Justifications for not doing something he doesn’t want to do.

I’m not trying to generalize to all developers here, but I do know the people and problem I’m working with.

Re:Dear Client, Here’s Why That Change Took So Long by watwut on Tuesday May 07, 2019 @05:24PM (#19853576)
Are you saying there is trust between you and developers? Cause you surely don't trust them and the way you describe their communication sounds like they don't trust you.

Also, if they give you non-padded estimate, that is the one they will occasionally miss, will typical manager of your company force them to work weekends and evenings or otherwise punish them? Or will typical be ok with it and accept it as risk factor?

I am asking because the one manager that complained about paddings was the one that took pride in manipulating people into weekends - including by claiming they promised it. I do tight estimates when I know I can be late and generous when I assume it will be law or don't trust management.

Re:Dear Client, Here’s Why That Change Took So Long by irq11 on Tuesday May 07, 2019 @06:09PM (#19853919)
Rather than second-guessing a total stranger on the internet - concerning a situation about which you know nothing - you would do well to question why you insist on assuming that everyone is as bad as the worst manager you’ve had.

To answer your question: no. I don’t do any of that. Also, this situation has nothing to do with aggressive schedules.

Re:Dear Client, Here’s Why That Change Took So Long by watwut on Thursday May 09, 2019 @05:05PM (#19872411)
So then what the issue is? Is company loosing money on that project? Wish bigger effectivity? Estimate is just that - padded one makes it safer to plan. Padded one is also trust signal - people can be lazy while making tight estimates they will not make after. Estimate and when it is done are two different categories.

That particular manager was not worst.

Re:Dear Client, Here’s Why That Change Took So Long by throwaway55554 on Tuesday May 07, 2019 @01:45PM (#19851702)
Sounds like a hiring problem. Start hiring some new devs and keep them separate so as to not contaminate them. As they come up to speed, let one of the other devs go. Wash, rinse and repeat.

Note: I'm a dev and I can tell you I very much dislike working with prima donnas.

Re:Dear Client, Here’s Why That Change Took So Long by commandlinefan on Tuesday May 07, 2019 @01:52PM (#19851772)
> Sounds like a hiring problem.

Yes, but not the way I think he’s thinking (and maybe not the way you’re thinking either). If you were actually in a room with him and said, “ok, let’s just walk in there right now, fire these clowns and replace them with somebody better” he’d immediately hold up his hand and say, “but I can’t find anybody better…”. So yes, it’s probably a hiring problem but the problem is that he’s putting unreasonable expectations on the people he’s hiring.

Re:Dear Client, Here’s Why That Change Took So Long by megablast on Tuesday May 07, 2019 @03:09PM (#19852448)
Oh yes, keep them separate from the people who know the application, how it works, what it integrated with, all the codes, all the issues. Brilliant!
Re:Dear Client, Here’s Why That Change Took So Long by throwaway55554 on Tuesday May 07, 2019 @03:31PM (#19852663)
Right!?
Re:Dear Client, Here’s Why That Change Took So Long by Retra on Tuesday May 07, 2019 @01:45PM (#19851706)
Perhaps shipping simply produces more value for you than it does for them?
Re:Dear Client, Here’s Why That Change Took So Long by watwut on Tuesday May 07, 2019 @05:20PM (#19853553)
Aggressive pushback usually ensures the other side will treat you as the enemy. Which sounds like what happened there - typical management hates developers and vice versa.

Ate they having bloted estimates or not shipping within estimates? Why there are such large features anyway? Why is manager not a ten member but instead someone who don't belong?

Re:Dear Client, Here’s Why That Change Took So Long by HeyLaughingBoy on Tuesday May 07, 2019 @01:27PM (#19851529)
All the more reason to expect it to take longer.