Re:Going Solo, Successfully by rpeden on Sunday February 17, 2019 @12:21AM (#19182806)
I believe you'll find that overall consensus on HN will strongly disagree with you on this point.

Here's the post most people will direct you to for an explanation of why you'll want to avoid hourly billing, and how to get to a place where you don't need to bill hourly:

https://news.ycombinator.com/item?id=4247615

For what it's worth - all of the people I know who have been able to do software-related consulting successfully over the long term don't bill hourly. They'd actually agree with you that having a minimum billable period of a week lots them lots of clients - but it lost them the clients that would try to nickel and dime them to death and complain about every invoice no matter low the hourly rate was.

It sounds like your experience has been different though, so I'm happy to hear you've found something that works for you.

Re:Going Solo, Successfully by jacquesm on Sunday February 17, 2019 @07:11AM (#19184081)
The HN consensus has simplified things in such a way that any shades of gray are tossed out.

When you are just starting out charging by the hour and starting with small stuff is fine. But your goal should be to transition to charging by the week as soon as you can afford it, because you can't afford to charge by the hour for your whole career.

Keep in mind that those that have 'arrived' tend to take their life experience and then condense it down to bullet points without nuance, after all, unqualified statements sound so much better than qualified ones. But it's all about the balance and to get to charging by the week you may need to start by charging by the hour.

Service > product > weekly rates > daily rates > hourly rates.

The further you are to the left the more money you'll make but you have to start somewhere.

Re:Going Solo, Successfully by bermanoid on Sunday February 17, 2019 @08:17AM (#19184304)
I agree with all of this, but I'd warn that unless you really know what you're doing and what can go wrong, jumping from weekly billing to project billing can be super dangerous and you're taking on a lot of risk. Most people aren't great at locking in scope for projects, let alone estimating the work it will take once the scope is locked; once you agree to per-project billing, you've committed and are on the hook for errors on both fronts.
Re:Going Solo, Successfully by pasta on Sunday February 17, 2019 @08:33AM (#19184360)
To add: you can even charge by the hour in blocks of 4 if you feel more like it.

It will be the same as charging per half day, but it can help you and your client to accept that charging daily will be the next step.

Re:Going Solo, Successfully by cubano on Sunday February 17, 2019 @02:16PM (#19186249)
This is what I am currently doing...plus, since everyone loves a "deal", I charge a slightly higher hourly rate then give away "one hour FREE" because we all know that FREE is the most powerful word in marketing.

Basically, I figure out what I would be happy with for 5 hours for work and then give them 4 hours plus one FREE hour for that amount.

This has the added benefit of nudging my hourly rate higher, since I always have a hard time raising my rates.

Re:Going Solo, Successfully by theli0nheart on Sunday February 17, 2019 @11:00AM (#19185052)
So true. Hourly billing is BY FAR the best way to get going. I’ve swapped to weekly contracts for a few contracts but only after an extended working relationship. Most folks won’t spring for that sort of payment, especially long term. Everyone understands and gets hourly billing.
Re:Going Solo, Successfully by lukego on Sunday February 17, 2019 @07:47AM (#19184200)
Having any rate helps to do algebra too. Clients can suppose that $x/hour ~= $8x/day ~= $40x/week ~= $1760x/year. So even if you quote an hourly rate the discussion can still be "how much should we budget for a team of ten people next year."

Maybe the correlation between hourly billing and bad projects is not causal.

Re:Going Solo, Successfully by j1elo on Sunday February 17, 2019 @07:23AM (#19184119)
I don't understand this comment as a response to your parent one. The condensed bullet point that it linked shows that dropping hourly rates wouldn't happen until step 5. As I understand it, all you describe would fall under the period of time one takes to get through 1-4
Re:Going Solo, Successfully by hardwaresofton on Sunday February 17, 2019 @01:05AM (#19182907)
One sticking point I rarely see discussed with the prevailing line of thinking (noted by tptacek, patio11 and others), is that a week is a measure of time.

If that's true, there is only time-based billing, and project-based billing. I've done both types, and project-based billing has been much more dangerous for me due to the need to accurately scope (or eat costs), usually for a client that has no idea how difficult "simple" additions can be (and often when you yourself cannot). Software scoping is effectively impossible to do accurately, and I've found the only way to get close is when you have already built the system in question before (or better yet, have a codebase you can reuse to hit 90% of the features in the first ~week of "work").

Hourly billing (whether you roll it up into a day/week/month) provides a way to cover myself from bad estimation, but limits you to charging for time to build and screws up incentives.

Project billing means I eat costs from bad estimation, but with the possibility of reward from over-estimation, along with the fact that you can charge for what the deliverable is worth (i.e. the value you deliver, not the time it took you to build the product).

As far as weeding out clients who aren't serious -- you can do that with a high-enough hourly billing (and generally you can get a feel for this from the client themselves)...

Could someone explain how I'm understanding the avoid-hourly-billing ideas wrong? It seems reasonable but it just doesn't seem to work for me in practice with the estimation thing, never mind the fact that clients need regular updates and rarely value good software development practices (so may seem like you've spent a week doing nothing if they can't immediately see the result/how it will save them time over the lifetime of the project).

[EDIT] - Another thing that I've realized when I was last thinking about this that I didn't include was that as complexity unfolded (and I realized my estimation was wrong), I did not increase prices/communicate this effectively to the business -- maybe that's where I'm getting it wrong? It feels like it would chip away at client trust to do so.

For those who are wondering what I actually do when I take projects on these days -- I just set a high hourly rate, possibly bundle it into weeks/months, and avoid project-based estimation because of the difficulty of scoping and the likelihood of scope changes. This also gives me an edge when the scope changes -- it's no longer "can this fit", and it's more "sure we can fit this in, it will take longer though".

Re:Going Solo, Successfully by groestl on Sunday February 17, 2019 @02:30AM (#19183165)
> avoid project-based estimation

You'll have happier clients as well, because with experience, the buffer in project-based estimations needs to be large enough that no possible hidden complexity can deplete it (barring complete show stoppers). Clients will usually be better off with time-based billing when the per-project cost estimate would come from an experienced provider.

Re:Going Solo, Successfully by hardwaresofton on Sunday February 17, 2019 @02:51AM (#19183222)
OK, so then in my head the advice is now: "do time-based billing but avoid hourly increments, instead opting for weekly/monthly but never disclose how many hours per week you work".

It seems inevitable that clients wonder/ask why you can't get X, Y, and Z done in a "week", when they hold a definition of what a "week" means to them. If you're billing for a week, they're going to assume you're billing for 5x8 hour days -- is the idea just to let them assume that, but you actually work however many hours it takes to get the deliverables for the week done? If so, that's basically forcing you to over estimate, or work a full work-week anyway, and then you might as well be pricing by hour (whether you show them or not).

What I've done recently is charge for X days/week, with a written agreement specifying what constitutes a "work day" for me. Clients normally don't care/micro-manage (there's enough mutual trust), and when we meet to show/discuss progress, I let them know how how "on schedule" we are (so at "based on how quickly I'm working at the current clip of 3 days/week, it looks like everything will be done in 4 weeks"). This formula would be wrong according to the usual HN advice though -- it's way too easy to translate X days/week w/ a set amount of hours that constitute a work day to X-per-hour billing.

Re:Going Solo, Successfully by lmm on Sunday February 17, 2019 @06:35AM (#19183942)
> What I've done recently is charge for X days/week, with a written agreement specifying what constitutes a "work day" for me. Clients normally don't care/micro-manage (there's enough mutual trust), and when we meet to show/discuss progress, I let them know how how "on schedule" we are (so at "based on how quickly I'm working at the current clip of 3 days/week, it looks like everything will be done in 4 weeks"). This formula would be wrong according to the usual HN advice though -- it's way too easy to translate X days/week w/ a set amount of hours that constitute a work day to X-per-hour billing.

Why do you need that "written agreement specifying what constitutes a "work day" for me."? That sounds like it's just encouraging the client to micromanage; you don't want a client that doesn't trust that you'll do a decent week's work in a billed week. And it gives you the disadvantages of a conventional job: you're now tied to working X hours/day Y days/week rather than taking a long lunch some days, working late some days, stopping early some days, and trusting that it'll all average out.

Re:Going Solo, Successfully by hardwaresofton on Sunday February 17, 2019 @07:34AM (#19184152)
I think that most clients in my current part of the world (Tokyo) have a set expectation of what a work day is -- normally ~8(+) hours. I have that in the agreement to avoid this misconception if a certain client expects me to be available/reachable during all of their own working hours.

Also, I do maintain flexibility in how I work the hours -- I don't say when those hours will be worked, just how many "days" are being billed per week. Sometimes I split it up over several days, and I almost always split it up into multiple chunks on a single day. This is the part I like most about the arrangement and my current lifestyle. Eventually you have to do some work, and the number of hours/day is the number I'm comfortable with working (it's less than 8).

Now this completely goes out the window for project based pricing jobs -- If I am charging for project/milestone completion, then I do not mention "work days" because they're irrelevant, there's only the deadline and whatever scheduled checkups/sync meetings, doesn't matter if I completely ignore the project for a whole week.

This comes back to my point before -- it seems to be the only real dichotomy is whether you charge for 1 unit of time (before/after the project deadline) or whether you charge for some derivative of hourly wages (due to the preconception of what a "workday" means in most people's heads).

Assuming you understood my previous point, are you suggesting that I should just leave the definition of "work day" vague? and treat a weekly contract as a project based one? I guess this could work, but it feels more to me like project based pricing split up into milestones that happen to have weekly delivery dates -- not what everyone is saying to "charge by week". And the problem there is the same -- how do you avoid/deal with bad estimation?

Re:Going Solo, Successfully by allannienhuis on Sunday February 17, 2019 @11:20AM (#19185161)
> how do you deal with bad estimation?

I think in part it depends on the type of client you're working with and the type of relationship you're building.

Non-tech/software clients (ie a business paying for custom software they're going to use themselves) care a lot about the total cost of $features, and often try to manage risk of cost overrun by treating estimates as part of the contract with the developer (even if it wasn't a fixed bid contract), and will hold you accountable to the project milestones: eg they don't care why things are taking longer - 'you should have considered that risk in the estimate - it's your fault'.

Tech customers (ie a software licensing or sass company) that use contractors to supplement their internal workforce usually understand the variability better, think of the contract more as buying the (expertise and) time of the developer, and they're managing more of the project and risk themselves. When things don't go to plan, they understand that many/most times this isn't the 'fault' of the developer, it's simply the inherent risks in the task being uncovered.

It's much simpler to arrange weekly rate contracts with the second type of customer than the first.

Re:Going Solo, Successfully by hardwaresofton on Sunday February 17, 2019 @12:18PM (#19185518)
Just wanted to note that this is spot on -- I've found I've enjoyed working with customers in the tech sphere a lot more than non-tech/software clients.

I end up just assuming that I just don't have the tooling/skillset just yet to handle the former set of clients well yet.

Re:Going Solo, Successfully by lmm on Monday February 18, 2019 @04:21PM (#19194566)
> This comes back to my point before -- it seems to be the only real dichotomy is whether you charge for 1 unit of time (before/after the project deadline) or whether you charge for some derivative of hourly wages (due to the preconception of what a "workday" means in most people's heads).

No. There is a huge difference between counting hours and counting weeks in terms of how much overhead it imposes on you, and how much opportunity it gives a client to nickel-and-dime.

> Assuming you understood my previous point, are you suggesting that I should just leave the definition of "work day" vague? and treat a weekly contract as a project based one?

No. I'm saying charge time-based, but by the week rather than the hour: that is, do not quibble about the difference between 39 hours and 41 hours, and do not work for clients who want to.

We really do mean what we're saying. Charge by the week, not by the hour, really does mean charge by the week, not by the hour. No more and no less. It really does make a difference.

Re:Going Solo, Successfully by hardwaresofton on Monday February 18, 2019 @10:04PM (#19196315)
> No. There is a huge difference between counting hours and counting weeks in terms of how much overhead it imposes on you, and how much opportunity it gives a client to nickel-and-dime.

> No. I'm saying charge time-based, but by the week rather than the hour: that is, do not quibble about the difference between 39 hours and 41 hours, and do not work for clients who want to.

Yeah but both of these things are what bad clients do, who we agree are weeded out (usually) with higher rates.

Also "not quibbling" about the difference between 39 and 40 hours means that there is an expected amount of hours you're supposed to be working -- how does that get set? Is the answer to just not talk about it? Why wouldn't a good conscientious client ask how much time you're dedicating to the project per week, if they find your per-week scopes to be lower than what they think could be done in their idea of a work-week?

To reiterate, I think the real kernel of advice here is "charge more to weed out bad clients", and the "charge by the week" to be a red herring. Charging more is doing the hard work here, weeding out clients that might attempt to micromanage, not changing to weekly billing. When businesses have enough headroom to not worry about whether they're maximally extracting value from you, that's when they don't care how long your work week is/what scope you set for a "week".

The legal profession seems to have no problem charging by the hour, why should we?

Re:Going Solo, Successfully by lmm on Tuesday February 19, 2019 @08:19AM (#19198722)
> Also "not quibbling" about the difference between 39 and 40 hours means that there is an expected amount of hours you're supposed to be working -- how does that get set? Is the answer to just not talk about it? Why wouldn't a good conscientious client ask how much time you're dedicating to the project per week, if they find your per-week scopes to be lower than what they think could be done in their idea of a work-week?

One could say the same about minutes in an hour - if a conscientious client thinks you're not getting enough done in your billed hours, wouldn't they ask how much of that hour you're spending writing code versus coffee breaks / bathroom breaks / sitting thinking? And indeed bad clients will ask such things, but the clients you want will accept that an hour means only that the only work you did that hour was on their project (or at least, that if you bill n hours across your clients then that corresponds to n hours of clock time on which you worked on no projects outside their collective set) and that you made a good-faith effort to work for that hour. A good client can certainly decide that you're not getting enough done in the billed time and ask you to revise your rate, or ultimately stop working with you. But good clients won't ask e.g. whether you were taking too many short breaks during a billed hour, because that conversation can't ever go anywhere worthwhile.

> To reiterate, I think the real kernel of advice here is "charge more to weed out bad clients", and the "charge by the week" to be a red herring. Charging more is doing the hard work here, weeding out clients that might attempt to micromanage, not changing to weekly billing.

Not my experience - indeed I'd say a high rate billed hourly gives more encouragement to micromanage as the client tries to "get their money's worth". For my money you get less micromanagement when billing weekly even if you charge a (slightly) lower overall rate - how much precision you bill with sets an expectation for how much precision is appropriate in all your interactions. YMMV I guess.

> The legal profession seems to have no problem charging by the hour, why should we?

As per the other reply, it's a real headache there. The legal profession has lost a race to the bottom in how billing is done. I'm sure we will too in time, as developers reach market saturation. But make hay while the sun shines.

Re:Going Solo, Successfully by speedplane on Monday February 18, 2019 @10:10PM (#19196331)
> The legal profession seems to have no problem charging by the hour

This is not true. The "billable hour" in the legal profession is a huge source of headaches for individual lawyers and the legal profession at large. The incentive is to work more, rather than work smarter, which is often in the client's interest.

Re:Going Solo, Successfully by hardwaresofton on Tuesday February 19, 2019 @02:57AM (#19197369)
I was certainly wrong in asserting that there were "no problems", but it is still the case that they predominantly charge by the hour. I agree that the incentive is to work smarter, not harder, as with most white-collar professions...

Surely the fact that the legal profession uses (begrudgingly or not) hours as a proxy for work (whether or not they actually work X hours, or who at the firm works those X hours) means something. The legal profession seems similar enough to ours (as far as this issue is concerned at least) and has been around long enough that they should have adopted a better way of doing things by now.

Re:Going Solo, Successfully by ascar on Sunday February 17, 2019 @04:07AM (#19183486)
I think the important point is not that it can't be broken down to a hourly rate, but that the smallest incrememt is 1 week or a day. They simply can't book you by the hour.

Specifying what a week or day is, is up to you. In regards to time as well as money.

Re:Going Solo, Successfully by lowercased on Sunday February 17, 2019 @08:44AM (#19184410)
> It seems inevitable that clients wonder/ask why you can't get X, Y, and Z done in a "week",

As much as I like the 'per week' idea, there's often stuff I can't get done because someone is sick during a week. Client's don't particularly like that. If they wanted to be paying someone $x/week regardless of work output, they'd hire more employees - they're often using external contractors for multiple reasons, but efficiency is usually one.

Re:Going Solo, Successfully by iceninenines on Sunday February 17, 2019 @01:53AM (#19183053)
Being paid by the discrete, incremental milestone assures the client you're not messing around and lets them know you expect to be paid after sign-off.

Having a net 10 or 15 with a ~3-4% discount is also a motivator to get paid sooner than a net 30.

Furthermore, you need someone good at collecting receivables and collections, be it you or someone else, especially dealing with education, healthcare, government, nonprofits or the military... because it will happen in spite of your selectiveness and client rapport, because some large orgs think it's cool to not pay their bills.

Re:Going Solo, Successfully by hardwaresofton on Sunday February 17, 2019 @02:23AM (#19183135)
So this is what I do on project-based projects -- I write up spec sheets, attach them to the contract/work-order, and define some amount up front payment, and break down the rest in terms of 25%/50%/100% completion, as determined by items in the spec sheets.

As far as collecting receivables, I've been either incredibly lucky or smart -- it's never been a problem for me (I am also no longer in the US -- I'm in Tokyo for now) -- clients have been big enough that this wasn't a huge problem, and whenever I sense it might be I demand a certain amount up front.

I agree with what you've said, but how do you combat the estimation problem & scope creep? Discrete milestones are great but it's very rare that requirements don't change half way through a project -- what is the best way to handle that? The problem is that you often have to make the estimate with absolutely no idea what the existing conditions will look like, there's the never ending stream of "little fixes".

Re:Going Solo, Successfully by wizardforhire on Sunday February 17, 2019 @01:22AM (#19182960)
This! One of the hardest things to learn on your own is how to say no and why. Learning how to identity problem clients and being able to say no to them in my opinion is one of the most valuable skills to attain. Not only for your sanity but also your success.
Re:Going Solo, Successfully by newnewpdro on Sunday February 17, 2019 @01:28AM (#19182977)
Learning to say no and set boundaries in general is a life skill, part of being an adult, and one many often never develop.
Re:Going Solo, Successfully by hobofan on Sunday February 17, 2019 @03:17AM (#19183306)
> https://news.ycombinator.com/item?id=4247615

That comment describes building a small consultancy (= multiple people), which is the opposite of going solo.

Sure, if you want to start up a consultancy, hire people and run the risk of "you don't eat", do that, but that is a very different trajectory to going, and staying solo.

Re:Going Solo, Successfully by csa on Sunday February 17, 2019 @04:11AM (#19183496)
Solo consultants can and have successfully followed the advice in your linked post.

patio11 is a seasoned HNer who has done this in a fairly public way.

Re:Going Solo, Successfully by dennisgorelik on Sunday February 17, 2019 @08:23PM (#19188032)
Patio11 is a full-time employee at Stripe.

Please take his [no doubt interesting] recommendations about how to do consulting -- with a grain of salt.

Re:Going Solo, Successfully by grzm on Sunday February 17, 2019 @08:34PM (#19188062)
'patio11 has been at Stripe for 2 1/2 years and was solo for many years preceding. I think his reputation is pretty solid, and have a hard time imagining how being fully employed at Stripe for the past couple of years should now make his past advice require seasoning. Have conditions changed so much recently? Would you care to expand on what you personally are concerned about (as opposed to vague aspersions)?
Re:Going Solo, Successfully by dennisgorelik on Wednesday February 20, 2019 @02:56AM (#19206379)
Prior to being a full-time employee at Stripe patio11 and tptacek tried to launch a startup [unsuccessfully].

Prior to that patio11 had been running a Bingo Card Creator and Appointment Reminder.

Corporate Consulting - is a small part of patio11 career. He managed to burn himself on that consulting path. If you want to get similar result - you are welcome to follow patio11 advice.

Re:Going Solo, Successfully by csa on Monday February 18, 2019 @02:29AM (#19189114)
He was, at one time, doing consulting for $20k-$30k a week for multi-week gigs. I can’t remember what his highest publicly stated billed rate was, but he has been fairly open and detailed about this.

I think he was in the process of jacking up his rates to $50k a week, but then he mysteriously stopped consulting. I’m curious about why. He has alluded to it before, but he was was very circumspect about the whole issue/experience.

Re:Going Solo, Successfully by jypepin on Sunday February 17, 2019 @07:21AM (#19184107)
I'm solo and I've followed this advice and it did me well.
Re:Going Solo, Successfully by iceninenines on Sunday February 17, 2019 @01:48AM (#19183040)
I've been doing client-facing Fortune 500 and startup tech consulting for about 30 years. If you're good, be choosey about clients and only work with the ones who will pay by the week, or preferably, by the milestone. You want to know your time is going to good use and that they're not going to get resentful or have any question about delivery.

Keep them apprised of progress, manage expectations, issues and demonstrate progress consistently... toiling away head-down doesn't mean anything on its own. You want to deliver as fast and with quality as you reasonably can... non-blocking, get-it-done, tempered impatience work-ethic.

Also, a master agreement is a good idea. And then each contract is a short and simple diff off that. Makes it less painful for both parties.