Companies that build the infrastructure typically have expectations around revenues in the long run. Very frequently there are provisions built in that prevent governments from turning around and building other infrastructure that competes with the privately operated infrastructure.
Imagine a civil engineering firm builds a new highway funded by tolls. Now imagine 20 years from now, the city wants to build a transit link because the highway is at capacity and the government wants to shift travel to more ecological / efficient modes. What happens when the tollway operator hires some travel forecasters that show the new transit link cutting into their toll revenues? You end up in a strange circumstance where you're no longer just doing transportation planning balancing the desires of the citizens, the funding, and the technical challenges of transportation... you're now balancing all those things plus the business interests who are less interested in fixing transportation than they are interested in maintaining their maximum toll revenues.
P3 infrastructure projects have many good aspects, but they have some really gnarly downsides as well.
In general companies are faster movers than governments in these types of things. If that didn't happen then something prevented them from being able to do so.
The corrupted politicians are to blame here for blocking other companies from competing, not the business.
The net effect is that there is drastic under-investment from the private sector compared to the needs or the economic potential of a society with good infrastructure.
Typically P3 agreements are initiated by government and promised revenue exclusivity is the incentive to build.
A potential downside is that we might end up back in the 1940s, when the subways became unprofitable and cities were forced to buy them out of bankruptcy because residents came to rely on them.
[0]: https://en.wikipedia.org/wiki/Dual_Contracts#Conditions
Most public projects today have generous structured incentives that are given to companies for meeting goals for time and budget. We work to these incentives.
Keep in mind that often you cannot be aware of the things that will go wrong until you actually do them. This happens in software development quite a bit.
I am not aware of any extensive private tunnel construction that has occurred without public financing inside of the U.S.
So here are the drawbacks to Musk's plan:
1. He may prioritize speed over safety, either unintentionally causing loss of life or limb because of construction practices or geotechnically destablize the foundations of the buildings and infrastructure that he's traveling under.
2. I firmly believe that it's going to cost far, far more than 1 billion. That leaves the chance of a big hole in the ground that may eventually fill with water.
The craziest part is that there is already a much cheaper and not that much slower option to get to the airport. This project seems rather Quixotic.
About the cost estimate, I don't have any other completely underground metro line in a developing country to compare. But Is it the labor costs in developed countries?
The reason you don't want to do that is because the private enterprise wants to maximize its profits. There is nothing wrong with that but in order to do so they will cut corners where ever possible and do the absolute minimum for upkeep.
Yes, this happens with poorly managed and financed public projects as well but public infrastructure can and sometimes must operate at a loss.
In fact a lot of public infrastructure does not pay for itself and is subsidized by tax dollars.
Government does this and when they do it it's much, much harder to hold them accountable. Look at the Big Dig or anything the MTA touches.
When a private company acts like this and the public notices there's at least the risk that some politicians will latch on to the issue (no politician ever lost public support by being tough on a company that was mistreating the public). When government is the wrongdoer it's needs to get incredibly bad before the other parts of government hold them accountable.
I find this idea really odd that a private company is going to cut corners. The fact is it has been the public projects that have cut corners. A private company always has the incentive to stay profitable and cutting corners is not how you play the long term game. Unlike the public held transport agencies they cannot just ask for a bailout or tax increase
https://www.illinoispolicy.org/chicago-to-pay-20-million-to-...
We could do what all normal business does for infrastructure. Revolutionary idea.
But it is a good idea. Often private mass transportation is illegal. This seems to be a hybrid model, I don't quite understand what this project entails in terms of obligations by both sides.
The downsides might be that they go bankrupt with a half finished tunnel and then the government has to either put in money to finish the project or start a new project.
When the government pays for construction, the contractors don't have a strong incentive to actually finish the project. They'll keep getting paid no matter how long it runs over or how over-budget it goes.
But in this situation, Boring Co won't make any money unless and until they get it up and running.
I know nothing about this. Has this been done successfully before? What are the potential downsides I'm not thinking of?