Re:SpaceX Will Launch Its First Reused Rocket Later This Month by Coincoin on Wednesday March 08, 2017 @09:44PM (#13826472)
Not all flight plans can lead to a recoverable rocket. GTO and polar orbits can't land back. This means there will be unrecoverable rockets from time to time.

But your question still applies to recoverable flight plans. How many do they need to cover all those?

Re:SpaceX Will Launch Its First Reused Rocket Later This Month by mikeash on Wednesday March 08, 2017 @09:52PM (#13826511)
GTO and polar orbits can still land, they just use the barge ("Autonomous Spaceport Drone Ship") instead of returning to the launch site.

There are launches which don't have enough margin to land at all. The upcoming EchoStar 23 launch is one of these. This is a GTO launch of a really heavy satellite, so getting it up there requires using the fuel the rocket would need to land.

However, this is rare, and it's likely that this will only happen a few more times at most

Re:SpaceX Will Launch Its First Reused Rocket Later This Month by ceejayoz on Wednesday March 08, 2017 @10:06PM (#13826582)
> However, this is rare, and it's likely that this will only happen a few more times at most

Especially once Falcon Heavy comes online.

Re:SpaceX Will Launch Its First Reused Rocket Later This Month by mikeash on Wednesday March 08, 2017 @10:11PM (#13826610)
Only six more months! As it has been for the last four years....
Re:SpaceX Will Launch Its First Reused Rocket Later This Month by alpos on Thursday March 09, 2017 @09:23AM (#13829418)
I think the key point there is that SpaceX can offer many new options for launch that seriously expand the kinds of contracts they can accept.

If your payload and destination allow for reuse then the cost of your launch is (cost of the whole rocket) / (number of reuses) + (landing & refurbishing costs)

If you require the full fuel of a Falcon 9 it might make sense to accept higher risk and launch on a rocket that is at it's last launch.

If you also don't want that risk, then maybe a mid-life Falcon Heavy can be cheap enough for you.

If Falcon Heavy is still too expensive even with re-use then maybe a one shot Falcon 9 is right for you.

Re:SpaceX Will Launch Its First Reused Rocket Later This Month by JshWright on Wednesday March 08, 2017 @09:55PM (#13826533)
Very few of their future flights will be expendable (in fact, the Echostar-23 launch coming up next will likely be one of the last).

The Block 5 upgrade will bring the performance of Falcon 9 (in a recoverable configuration) up to the point where flights like Echostar will be able to make downrange barge landings. Heavier payloads (which are _very_ rare nowadays) will fly on Falcon Heavy.

Polar orbits are almost always low-earth orbits, and therefore are much easier to recover. I would be very surprised if they ever flew an expendable launch out of Vandy in the future.

Re:SpaceX Will Launch Its First Reused Rocket Later This Month by rkangel on Thursday March 09, 2017 @05:08AM (#13828312)
> Heavier payloads (which are _very_ rare nowadays)

Yes, but how much of that is because there isn't anything to launch them? When Falcon Heavy is up and running, a commercially feasible option will exist for the first time. Maybe that'll change, and we'll start seeing things in space that weren't commercially feasible before.

Re:SpaceX Will Launch Its First Reused Rocket Later This Month by JshWright on Thursday March 09, 2017 @10:45AM (#13830031)
It's only commercially feasible if SpaceX is willing to sell that service. They are pretty firmly committed to the philosophy of reuse.

They have to fly expendable now, because customers can just fly on Ariane/Atlas/etc if SpaceX said no. Once Falcon Heavy is flying, there won't be any competitors with the same payload capacity (until New Glenn, which is also planning first stage reuse, but is still very much a paper rocket at this point).

Re:SpaceX Will Launch Its First Reused Rocket Later This Month by WesleyLivesay on Thursday March 09, 2017 @07:52AM (#13828902)
There will always be payload that pushes the rocket to its limits, make a rocket with larger lift capacity and payloads will increase.

However, they can build that into the cost of the lift. If the rocket isn't recoverable because of what they want to put in it, just charge them for the rocket.

Either way it is better than what we have now.

Re:SpaceX Will Launch Its First Reused Rocket Later This Month by JshWright on Thursday March 09, 2017 @10:47AM (#13830041)
Maybe... Elon is pretty firmly committed to reuse though. SpaceX is occasionally flying expendable now because they have to compete with Ariane and Atlas. Once Falcon Heavy flies, there won't be any such pressure.
Re:SpaceX Will Launch Its First Reused Rocket Later This Month by LoSboccacc on Thursday March 09, 2017 @08:28AM (#13829059)
yeah if computer ram size growth taught me anything is that once there's capacity, there'll be consumption.

/me looks sternly at DooM