Re:SpaceX Will Launch Its First Reused Rocket Later This Month
by alpos on Thursday March 09, 2017 @09:23AM
(#13829418)
I think the key point there is that SpaceX can offer many new options for launch that seriously expand the kinds of contracts they can accept.
If your payload and destination allow for reuse then the cost of your launch is (cost of the whole rocket) / (number of reuses) + (landing & refurbishing costs)
If you require the full fuel of a Falcon 9 it might make sense to accept higher risk and launch on a rocket that is at it's last launch.
If you also don't want that risk, then maybe a mid-life Falcon Heavy can be cheap enough for you.
If Falcon Heavy is still too expensive even with re-use then maybe a one shot Falcon 9 is right for you.
If your payload and destination allow for reuse then the cost of your launch is (cost of the whole rocket) / (number of reuses) + (landing & refurbishing costs)
If you require the full fuel of a Falcon 9 it might make sense to accept higher risk and launch on a rocket that is at it's last launch.
If you also don't want that risk, then maybe a mid-life Falcon Heavy can be cheap enough for you.
If Falcon Heavy is still too expensive even with re-use then maybe a one shot Falcon 9 is right for you.