Ask HN: How much of your time is spent in meetings?
If you're a developer for a 'big corp' how much of your time (% or hrs) a week is spent in meetings?
At a new 'big corp' job, and the amount of meetings seems far larger than other employers. To the point of a meeting every other hour, killing productivity. Hoping to get a better understanding of what would be considered normal/average in large organizations.
Aside from an all employees gathering, the biggest meeting yet involved two entire teams (~15ppl not all developers) for a full hour of discussion. For comparison, I had to get approval to order a $40 laptop stand, and estimating the meeting to be worth about $600 of salary time called on a whim.
EDIT (to clarify what counts): Agile/scrum company, and we don't count first day of sprint (spring planning) or last day (sprint reviews).
(
49 comments
| 31 points
| on HN
)
Serious question. How do other folks get collaborative work done on big projects without having meetings to discuss/brainstorm/check in/etc? There seems to be a strong attitude here of "I am working on $THING, therefore leave me alone unless it's an emergency," but how does that actually work when $THING gets complex, malleable, ill-defined, risky, changed, etc?
If you're seeing a product evolve in complexity that much during the development phase I'd look elsewhere for issues. Those high-touch brainstorming/problem solving phases should be worked out well in advance of engineering.
If you're speaking to those phases then I've found those are done much better in person. Even for remote teams (I'm remote as well) getting together in person for large project kickoffs is vitally important. Collaboration can be done async, but I'm a firm believer for in person meetings for conceptualizing those "new" things.
Times that you're working on $THING and a matter related to it legitimately requires you and n other people dropping what you're doing to talk about it synchronously are very rare.
I don't really mind the volume because when I was a developer I liked working with managers who tried to keep my calendar as open as possible and only bringing me into meetings when my opinions were needed.
I try to emulate that now I am a manager and have a sizable staff of developers. I will typically take meetings that traditionally would have included a developer or two. I will only bring them in if it's obvious their input is needed or they specially asked to be more visible to the process.
I'd say developers on my team average about 2 hours a week in scheduled meetings. There of course are times where breakouts need to happen to discuss some fine points of such and such thing but such things are part of the job too.
I run 3 teams, I delegate obsessively (a my team leads are smarter than me and know what they are doing better than I do) however I thing people, bosses, team, politics, now and next. Every week you MUST meet with your boss, your direct reports, you must meet with your peers and you must have a meeting about the current work and a meeting about the next work. You also need a to be doing some political meeting - random folks who want to talk to you and do things with you/for you/get you to do things.
Team/peers - you will do 2hrs to share everything (min), DR's is an hour each, I have 3 (and a half but that's another story) boss will be 1/2-1hr (as he/she will be at their wits end) big boss will be 1/2 hr (so 2 hrs bosses), politics is 3 hrs. Now is 1/2 hr if all is good.. but there are a lot of nows, so put 2 1/2 hrs min against that, if all is not good budget 5 hrs. Next is 30 mins (at the beginning of a cycle) to 5 hrs (at the end of a cycle.
Tot it up... 13 -> 20 ish.
They all have a specific purpose for me; they keep me employed and they keep the pipeline alive. Being less selfish; they keep those who depend on my engagement happy and they make sure that my company gets the value center that it invests in in the shape of my team. I deliver on the investment, build capability and a work stream.
Most of all I do not piss anyone off by being unavailable or unfriendly - for a manager work is a social activity; if you don't like it you need to look for another dev gig.
One day a week, half our day was spent in scheduled meetings regardless of whether or not there was a set agenda in advance. Additionally, daily standups would last ~15-30 minutes depending on who was rambling for the day on a team of five.
I would be invited into meetings to discuss speculative things without a set agenda all the time. After a while, I began to decline meetings in which I would have no direct impact or could get a good summary of via email.
One "prospective invite" I indirectly received was when a small project I was working on changed stakeholders, and a new person I hadn't been introduced to was looped in via email. The project was for an internal tool that less than five people in the entire company would ever interact with. This new person who was looped in said something along the lines of:
"_____ (new stakeholder), are you thinking of discussing this in our meeting next week? If so, should we extend that meeting to cover it? Let's invite ______ (me, OP) so we can talk about it."
I ended up blocking off my entire day with appointments on my calendar that were just for me working so I wouldn't get invited to as many.
We started literally putting up a cost clock, that ticked off the running cost of a meeting. It was surprisingly convincing and motivating for everyone, even (especially?) our external customers who were previously happy to sit and chat for hours.
That said, there's a reason I don't work at a 'big corp' anymore :)
So far, we've just started filing our calendar with bogus 'private meetings' so we can get stuff done. I can't see working for 'big corp' type companies forever, and I do like the experience so far -more learning about 'big corp' world.
- Oracle (past): 1.5 hours a week (a few thousands ppl)
Both cases my team and management avoided unnecessary meetings, the 1.5h is for two meetings: 1:1 and team meeting. It's not up to the company size, but instead how optimized your team wants to behave.
note: I am in a SW Engineer position. Not sure about Marketing, HR, Finance..etc.
We're full agile on the software side, so teams are mixed positions with at least one business-y person (~1000 ppl company).
You have to choose one, do what is told, or collaborate on a huge scale, in other words meetings substituted works.
Beware there are certain personality enjoy meetings and collaboration. To these characters, the more meeting the better. Collaboration is redefining their work and value. They consider meeting is the job itself. After all, what can be done without collaboration.
collaboration has become the number one platform for visibility and getting upper management attention, translate into promotion and higher pays. After all, what else matters if you can't get ahead and earn more income.
Meetings are important. Meeting is essential to career advance.
Here it explains the mystery of your problem: http://www.cosmopolitan.com/sex-love/a62768/higher-iq-less-s...
Line managers seem to spend most of their time in meetings.
Because I became an expert in some areas, I was routinely invited to meetings to give my input (which further reinforced opinions). Furthermore, I realized a lot of non-technical people are not good about responding to emails. If I needed something from a product manager, chances were better that I could get it faster by setting up a 30 minute meeting for the following day. If I needed something from a senior engineer, email was best, of course.
Honestly, given the role I had and the largish size of the company, I never felt like it was too many meetings.
That seems excessive - are you sure that's typical across your company and not just unique to your team?
Anyway, to answer your question, at VMware I spend about about two hours a week in meetings. [N.B. I'm a fairly junior engineer, more senior ones typically spend more time in meetings]
I let that happen exactly once before bringing it up to my supervisor. According to him, seems like it's at least across our dept (IT/software dev).
The history sounds like it didn't use to be an issue until they moved into a giant 'open office' with very few walls/rooms. What normally would've been a quick conversation in someone's office turns into booking a meeting room, and the mentality turns into, "Might as well invite XYZ too because now it's a meeting."
EDIT: typos and clarity
We ran the numbers for our dev team specifically, and they have ~8.5 meetings a week, taking up ~4.2 hours. We’re a smaller company; but data shows that on average, developers spend less time in meetings than the rest of their collective co-workers. More interestingly, this data shows that each company has a unique culture around meeting behaviors, and so your meeting schedule will be a function of your ‘big corp’ collaboration culture. Would love to talk more if you have questions!
A couple of jobs ago I worked at a large software company you definitely have heard about. I estimate that meetings took at least 30% of my time, sometimes more, this with my then manager shielding us from as much of outside interruption as possible, otherwise I would estimate I would have spent 250% of my time in meeting (not exaggerating). Doing the most trivial thing required days or weeks of planning.
edit: fix sentences
That said I'm a mid-level dev and I know the more senior devs & boss are in meetings more often working out how things will work with other departments and such.
This was a heavy week, I have 14.5 hours of scheduled of meetings (out of 40 worked, so ~36%). Some meetings went over, so I estimate I can easily add between 1 and 2 extra hours. I ended up having an emergency so I lost an additional 3 hours, but that's extraordinary circumstance.
Last week was lighter, at 5 hours.
If you don't count stand-ups, take 3 hours away from each week.
Thanks, I'll add that to the original post.
I'd like to hope those aren't the only two options!
In a previous role at the same company, my meeting load varied between maybe 1 and 8 hours, depending on how many things involving other teams I was working on and how controversial the design decisions for that project were.
- about 2hrs/week for larger meetings
- about 1hr/day in Skype meetings where I can tune in half-way
- about 1hr/day in working meetings with 1 or 2 other engineers
Does time spent on HN count?
If more than 1/4 of your day is in meetings as a developer you're in WAY too many and honestly... even then if it's an average it's too much (we've all had meeting heavy days, but a rolling average shouldn't be that much)