Elsewhere in the world, the Delhi Metro Phase 2 cost $2.9B and took 3 years. 77 miles of track, 85 stations, and countdown clocks. The Bangalore Metro (phase 1) is expected to be $2.5B (including a 25% cost overrun) for 26 miles and 40 stations. It also includes countdown clocks. Barcelona spent $200M for a 5.8km rail tunnel.
Where's your money going?
https://pedestrianobservations.wordpress.com/2013/06/03/comp...
If only I thought of this - then I might have cited a Spanish construction project in the very comment you replied to, so that no one could cluelessly bring up labor costs.
In any case, even if your claim were true, there is an easy solution. Import Indians to get the job done. The goal is fixing our crumbling infrastructure rather than union featherbedding, right?
I'm going to see if I can google what a Swiss equivalent costs (pretty certain the Swiss should be more expensive than American workers).
Edit: the only metro in Switzerland is in Lausanne, and it cost SFr590 million ($472 million) for about 6 km (3.7 miles) and 14 stations.
Construction is probably much easier, but the American one still has some pretty brutal cost overruns.
In Zürich they just finished a huge expansion with a complex 10km tunnel und a 3rd underground 4 track station. Project cost was 2.0B up from 1.8B. At one point a drill got stuck and they had to abandon it.
[1] https://de.wikipedia.org/wiki/Durchmesserlinie_Altstetten–Zü...
But its really the only subway the city has, plus I think they're required by consent decree to build sometimg (Part of the "big dig" project (putting highway in a tunnel), another fine example of poor project budget control in the commonwealth of Massachusetts)
Really though, the MBTA has a bunch of major issues. Not just project management. I honestly don't know what it would take to fix it but something has to give sooner or later. People are finally getting fed up.
5 years later, costs estimated at $3.09B and project is terminated.
Costs went up over 300%. The level of incompetence on display here is borderline criminal. Have a friend who works at one of the big 4 who is being called in to audit this failed project. Should be interesting to get an insider perspective on where taxpayer money was spent.http://www.mbta.com/uploadedfiles/About_the_T/Board_Meetings...