5 years later, costs estimated at $3.09B and project is terminated.
A Reliable Project Budget is Defined as being
within +10% and -5% of what it would Cost
to Design and Construct the Project
Costs went up over 300%. The level of incompetence on display here is borderline criminal. Have a friend who works at one of the big 4 who is being called in to audit this failed project. Should be interesting to get an insider perspective on where taxpayer money was spent.http://www.mbta.com/uploadedfiles/About_the_T/Board_Meetings...
Elsewhere in the world, the Delhi Metro Phase 2 cost $2.9B and took 3 years. 77 miles of track, 85 stations, and countdown clocks. The Bangalore Metro (phase 1) is expected to be $2.5B (including a 25% cost overrun) for 26 miles and 40 stations. It also includes countdown clocks. Barcelona spent $200M for a 5.8km rail tunnel.
Where's your money going?
https://pedestrianobservations.wordpress.com/2013/06/03/comp...
If only I thought of this - then I might have cited a Spanish construction project in the very comment you replied to, so that no one could cluelessly bring up labor costs.
In any case, even if your claim were true, there is an easy solution. Import Indians to get the job done. The goal is fixing our crumbling infrastructure rather than union featherbedding, right?
I'm going to see if I can google what a Swiss equivalent costs (pretty certain the Swiss should be more expensive than American workers).
Edit: the only metro in Switzerland is in Lausanne, and it cost SFr590 million ($472 million) for about 6 km (3.7 miles) and 14 stations.
Construction is probably much easier, but the American one still has some pretty brutal cost overruns.
In Zürich they just finished a huge expansion with a complex 10km tunnel und a 3rd underground 4 track station. Project cost was 2.0B up from 1.8B. At one point a drill got stuck and they had to abandon it.
[1] https://de.wikipedia.org/wiki/Durchmesserlinie_Altstetten–Zü...
But its really the only subway the city has, plus I think they're required by consent decree to build sometimg (Part of the "big dig" project (putting highway in a tunnel), another fine example of poor project budget control in the commonwealth of Massachusetts)
Really though, the MBTA has a bunch of major issues. Not just project management. I honestly don't know what it would take to fix it but something has to give sooner or later. People are finally getting fed up.
While the transit system here needs upgrading badly, this piece is very political. The quoting of Charles Chieppo is a give away.
"For many systems, Chieppo said, the focus is on improving stations or opening new ones rather than fixing the core infrastructure." The T is working on the first expansion of the subway rail system since the 1980s. Its going into the neighboring city of Somerville and "surprise" its over budget. They might kill the expansion with the focus on "fixing the existing" as kind of justification, instead of doing both at once? They're also reducing late night service for the extra couple hours they tacked on to friday and saturday, while proposing a fair hike. Things cost money, but people don't like to pay more to get less.
(I'm actually usually on one of the MASCO "private" buses that supplement the T for its failure to provide adequate routing to the Longwood Medical area.)