by sschueller on Monday March 07, 2016 @03:18PM
(#11241305)
3.09B!!! That is insane. I would think after the big dig disaster they would have learned their lesson.
In Zürich they just finished a huge expansion with a complex 10km tunnel und a 3rd underground 4 track station. Project cost was 2.0B up from 1.8B. At one point a drill got stuck and they had to abandon it.
In Zürich they just finished a huge expansion with a complex 10km tunnel und a 3rd underground 4 track station. Project cost was 2.0B up from 1.8B. At one point a drill got stuck and they had to abandon it.
[1] https://de.wikipedia.org/wiki/Durchmesserlinie_Altstetten–Zü...